| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:30am On Sep 28, 2023 |
Closer..........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:33am On Sep 28, 2023 |
More pictures from the outside........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:16am On Sep 28, 2023 |
Work goes on today........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:07am On Sep 29, 2023 |
We started working on the soakaway system of this building since two days ago. All othe plastering and dressing works are also going on smoothly. More picture updates later. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:14am On Sep 29, 2023 |
We're also expecting to hang all the windows for this house today or tomorrow, workers waiting to dress the windows are on site waiting fornit. More updates later. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:32am On Oct 04, 2023 |
We had started the construction of a soakaway system for this house.............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:14am On Oct 04, 2023 |
We continued works at the soakaway, block walls...........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:14am On Oct 05, 2023 |
Windows arrives, fitted and ready to be dressed in.............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:17am On Oct 05, 2023 |
Front of the apartment block............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:19am On Oct 05, 2023 |
Soakaway system
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:21am On Oct 05, 2023 |
Treatment of internal wall spaces in readiness for painting..............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:23am On Oct 05, 2023 |
More rooms done...........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:44pm On Oct 05, 2023 |
spyder880:How many soakaway will this building have. Can this be constructed using 9" hollow block? I see you're using 5"solid block . |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:56pm On Oct 05, 2023 |
Gen2men:1 soakaway will be good for this house, I had to use 6" solid blocks to save more space. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:01pm On Oct 05, 2023 |
spyder880:OK Sir |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:03pm On Oct 05, 2023 |
Was P.O.P done on the under deck, and how many tanks will this tank stand carry? |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:20am On Oct 06, 2023 |
Gen2men:Yes we did full POP on the under decking, the tank stand will carry 6 tanks. Thanks. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 4:29pm On Oct 06, 2023 |
spyder880:Everything looks standard. The rails looks simple and sturdy. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by michlins(m): 5:59pm On Oct 06, 2023 |
Gen2men:I did the doors and rails |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 6:22pm On Oct 06, 2023 |
michlins:Okay nice job! |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:57am On Oct 08, 2023*. Modified: 6:24am On Oct 12, 2023 |
We have bought and dropped some of the floor and wall tiles at this site. Work is going on withe the wall screeding, doors and windows hanging and dressing, soakaway system completed. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 3:38am On Oct 12, 2023 |
spyder880:No pictures ![]() |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:29am On Oct 12, 2023 |
Gen2men:I couldn't get to the site, market was too rowdy with impending price hikes, after buying the tiles, I sent my workers to drop them at the site while I moved to another market to buy electrical fittings. But these are examples of the tiles we want to use at this site. For walls.
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:39am On Oct 12, 2023 |
Some of the floor tiles chosen
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 4:21pm On Oct 12, 2023 |
spyder880:Nice selection |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:37am On Oct 15, 2023 |
We have bought all the tiles needed to complete the floor and wall tiles for this whole building, tiling starts soon. More pictures later. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 3:54pm On Oct 15, 2023 |
spyder880:Please engineer, what width and height do you use for kitchen cabinets? |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 4:26pm On Oct 15, 2023 |
Chidimercy:There are no specific height or width, cabinets are designed according to the size of the kitchen and the free spaces available after removing door lapping space, and possibly fridge or other appliances that might rest on the wall. Most people use 90cm as the work table height. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 2:51am On Oct 16, 2023 |
spyder880:Are these Spanish or Nigerian tiles? |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:55am On Oct 16, 2023 |
Gen2men:Nigerian made tiles, Spanish is so so expensive these days due to the exchange rates. And the quality doesn't worth the difference in price. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 12:47am On Oct 17, 2023 |
spyder880:Oh I see, the Nigerian made tiles doesn't look bad . |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 6:17am On Oct 17, 2023 |
spyder880:Thanks so much engineer |