| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 11:26am On Nov 09, 2023 |
Other bathrooms where we are doing tiles in other flats............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 6:33pm On Nov 09, 2023 |
spyder880:What kind of toilet door is this Spyder |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:04pm On Nov 09, 2023 |
Gen2men:This is a new product in the market, they calling mirror face, golden colour. I bought it for N75,000 each before the dollar started its upward journey. Its made of aluminium and imported, very well polished. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Pius4me: 7:20pm On Nov 09, 2023 |
spyder880:Spyder the speed you reply to questions i was wondering if you don employ an assistant lol. This dollar wahala is killing everything in Najia N75000 for toilet door. Nigerian importers are not helping matters too. keep up the good work my brother. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:45pm On Nov 09, 2023 |
spyder880:It's beautiful, how much will the regular plain aluminium toilet door cost.? Just for comparison |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:58am On Nov 10, 2023 |
Gen2men:This one will sell for about N35,000 Locally produced, aluminium and perspex combination.
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:35am On Nov 10, 2023 |
Updates from our works at this building ..............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:38am On Nov 10, 2023 |
More pictures from the front and side...........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:48pm On Nov 10, 2023 |
spyder880:Wow twice the price. That mirror toilet door will increase the rental value of those flats .. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by kingralph(m): 2:13pm On Nov 18, 2023 |
Spyder is there further update on this project? |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 2:49pm On Nov 18, 2023 |
kingralph:Plenty. I will update some updates today as time permits. About 10 of my workers are still working here today till next weekend, and more will join as we aim for the finish. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 11:06pm On Nov 18, 2023 |
Improvements on the finish of this building, wall screeding works almost completed...........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 11:22pm On Nov 18, 2023 |
From the front and sides of this ongoing building
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 11:26pm On Nov 18, 2023*. Modified: 2:38am On Nov 19, 2023 |
We have bought the materials to start the wardrobes and cabinets in this building............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by akeme1: 11:30pm On Nov 18, 2023 |
Nice work, Do you also work in Lagos? |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 2:39am On Nov 19, 2023 |
akeme1:Not at the moment Sir. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:11am On Nov 19, 2023 |
Introducing more Wall belts to enhance the beauty of this house..........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:13am On Nov 19, 2023 |
More.....
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 4:21am On Nov 22, 2023 |
spyder880:What kind of plywood is these Boss |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by denzel231: 5:50am On Nov 22, 2023 |
spyder880:it's like the same one I told you about that I used for my house and you said it was 25k lol, I shock. Greetings baba |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by denzel231: 5:52am On Nov 22, 2023 |
Nice update |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:11am On Nov 22, 2023 |
denzel231:Much greetings my brother, welcome. |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 2:57pm On Nov 26, 2023 |
We have been working on the wardrobe cabinets and kitchen cabinets of this house.............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:00pm On Nov 26, 2023 |
Excavations in preparation of the generator stand for this house............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:03pm On Nov 26, 2023 |
We have also bought a lot of materials in preparation of the security post construction............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:52pm On Nov 26, 2023 |
Some balconies completed with floor tiles.........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:53pm On Nov 26, 2023 |
Inspecting the finish works from the inside of the compound.............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:56pm On Nov 26, 2023 |
Inspecting the finish works from outside the compound..............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:49am On Nov 27, 2023 |
We are making arrangements to buy paints and start the painting of the outside walls, starting with the parapet fascia of this building................ |
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:43am On Dec 05, 2023 |
Working on the decking of the generator base for this house............
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:46am On Dec 05, 2023 |
Staircase tiles ongoing...........
|
| Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 1:35pm On Dec 09, 2023 |
spyder880:Please engineer, what's the size of this soakaway, and what's the labour cost for digging the soakaway? |