Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) - Properties (5) - Nairaland
Nairaland Forum › Nairaland General › Properties › Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) (39807 Views)
1 2 3 4 5 6 7 8 9 Reply (Go Down)
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by nettan: 1:39pm On Apr 05, 2016 |
skimanski:You've got a mail.Pls check and let us discuss. Thanks |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:03pm On Apr 05, 2016 |
nettan:Confirmed |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:05pm On Apr 05, 2016 |
Affordable architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems) Designs & Structures. Architect Jude O. Odemwingie. email: jude@dnstructures.com email: skimanski4life@yahoo.com website: www.dnstructures.com Tel; 08038390386 or 08185174782 follow us on Instagram: @ dezynstructures Kindly Follow our numerous professional works Works on the pages below https://www.nairaland.com/1164230/best-architectural-interior-construction-works https://www.nairaland.com/2067260/lekki-gardens-finishings https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4 https://www.nairaland.com/2770635/construction-works-units-flats-new https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:38pm On Apr 06, 2016 |
Installation of Aluminium Windows (White Profile with Plain Blue Glass)
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:39pm On Apr 06, 2016 |
Kicking off Wiring As Well
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by talk2kay(m): 2:33pm On Apr 07, 2016 |
skimanski:Skimanski, i did sent you an email subject "From NairaLand / Architectural Design Needed Mr Jude!". check and get back. |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 11:05pm On Apr 07, 2016 |
talk2kay:Responded |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:40pm On Apr 12, 2016 |
More Wiring Pictures as we Link our Lines to Distribution Board
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:43pm On Apr 12, 2016 |
In the Mean Time, Septic Tank Reinforcement Is ongoing outside the House.
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:44pm On Apr 12, 2016 |
Also In locations where the Wiring have been Completed, POP works have Kicked Off. Tiling to Follow too
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by talk2kay(m): 5:47pm On Apr 13, 2016 |
skimanski:Oga Skimanski, i did not receive any reply from you ooo. Please check and re-forward to me please! |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:55pm On Apr 18, 2016 |
Updates on Gate House and We finish Rendering. Also Current pics on External during conclusion of Septic Tank concrete Cast
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:59pm On Apr 18, 2016 |
POP Updates for Master's Bedroom and Main Lounge on Two Flats
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by danny34(m): 11:03pm On Apr 18, 2016 |
beautiful work I must say. would u need a professional Painting touch on this building? we are one call away... |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 6:34am On Apr 19, 2016 |
Tiling works resume. Trying to Make Good use of our China Tiles
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 1:32pm On Apr 23, 2016 |
Master's Bathroom Tiling.
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 1:34pm On Apr 23, 2016 |
Wall Screeding Also On going as We tile
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 1:37pm On Apr 23, 2016 |
Sinking on Our Septic Tank/Soakaway Pit
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 1:41pm On Apr 23, 2016 |
Gate House Update
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by Miscellaneous(m): 6:24pm On Apr 23, 2016 |
skimanski:oga.... how deep is this pit ? |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 7:54pm On Apr 23, 2016 |
Miscellaneous:2.4m deep |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:14pm On May 02, 2016 |
Complete Sealing of Septic Tank Floors. Been Watching it for days now and No Water Out Yet. Thumbs up to my Workers.
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:16pm On May 02, 2016 |
Flat 1: Kitchen Tiling
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:18pm On May 02, 2016 |
Precast Molding Design. External Look taking Shape Gradually.
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:18pm On May 05, 2016 |
Updates on Tiling Works
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by class0247: 11:57pm On May 05, 2016 |
This is very nice.Please can you give me the full estimate for this building |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 8:17pm On May 06, 2016 |
class0247:Kindly Email me via below email info: skimanski4life@yahoo.com jude@dnstructures.com |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:36pm On May 06, 2016 |
Arrival of Cabinets and Wardrobe Materials
|
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by Favored4gud: 2:34am On May 10, 2016 |
I tried to look for the meaning of screeding and plastering. Pretty much same. Please enlighten me, what is this form of screeding u have displayed called?? And what is the purpose after plastering the house.I am working on my house now n keep getting this screeding offer thrown in. But not convinced of its significance. skimanski: |
| Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:08am On May 10, 2016 |
Favored4gud:This is POP Wall Screeding. Different from Plastering with Cement and Plaster Sand. It makes the Wall surface Smoother than when its just plastered Wall. Its called Quality. A painted wall that was screeded has a more quality look than a Painted wall without Screeding. |
Our Renovation Diary (a New Dimension To Nigerian Architecture) • Construction Of Flats In Owerri (new Dimension To Nigerian Architecture) • 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) • 2 • 3 • 4
5 Bedroom Duplex Built With Italian Materials selling cheap • Best Way To Prevent Water From Sipping Into Your Building Through The Floors • Part Of My Farmland's Fence Fell Down For The 2nd Time (Photos)