FG To Commission 40MW Kashimbilla Hydropower Plant Soon by jarawa(op): 6:06am On Sep 02, 2019
The federal government said it will soon commissioned the already completed 40 megawatts (MW) Kashimbilla hydropower plant, the Takum, Wukari transmission substations in Taraba state and other projects to boost national electricity grid.

The Minister of Power, Engr. Sale Mamman confirmed this at the weekend during an inspection tour to the plant along with the Minister of State, Mr Goddy Agba and other dignitaries. They also inspected the plant’s 330/132 kilovolt (kV) switchyard and the Takum 2×60 MVA, 132/33kV transmission substation. The Project Manager in the Ministry of Power, Engr Ali-Dapshima Abubakar who conducted them around the project sites said the Kashimbilla Hydropower was upgraded from 6MW to 40MW.

He said the dam and the hydropower components were completed since October 17, 2017; the evacuation project was at 90% level in June, 2019 and will be ready for power generation soon.

The dam will check flood threats from Lake Nyos located along the Cameroon line of volcanic activity while providing power. It will also provide water supply to about 400,000 people and boost irrigation for agriculture. At the Takum 2x60MVA, 132/33kV substation, Engr. Abubakar said the Wukari, Takun and Kashimbilla power projects were 100% completed and ready to energize.

Engr. Mamman expressed satisfaction on the projects and assured of addressing challenges to ensure they are energized. The Managing Director of the Transmission Company of Nigeria (TCN), Mr Usman Gur Mohammed said he was satisfied with the substation’s work. Briefing the ministers, he said when power is evacuated from the plant; it would serve the Northeast, North-Central and the Southeast.

Read more: https://www.dailytrust.com.ng/fg-to-commission-40mw-kashimbilla-hydropower-plant-soon.html
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Mynd44(mod):
It is more of an irrigation, flood control and a water project than power.


But Nigerians care about power more so…..
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by abbeyloyee(m): 6:11am On Sep 02, 2019
Hmm
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Twenty47(m): 6:11am On Sep 02, 2019
Nice one
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Osyxcel(m): 6:12am On Sep 02, 2019
Just give us light. Simple!
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by lilfreezy: 6:12am On Sep 02, 2019
40mw chimoooooo grin

Restructure this country and let every region generate its own electricity and see if we won't have steady power. Power will bring investors. A state like Imo State alone is capable of generating 4000mw with its gas reserve. We know what to do but it must be business as usual.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by twinskenny(m): 6:13am On Sep 02, 2019
Mynd44:
It is more of an irrigation, flag control and a water project than power.


But Nigerians care about power more so…..
right but little by little we should get there
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Nobody:
Baby steps. When naija go get 24 hours like other African countries self.

Nigeria is one of the few countries left in the dark of the middle ages in the world.

Na we corrupt passhuh Kai!
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by mallamnari: 6:14am On Sep 02, 2019
Soon..
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Kendumazy(m): 6:14am On Sep 02, 2019
OK
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by sonnie10: 6:15am On Sep 02, 2019
Upon all the natural dams and water falls in the South, none of them is worth constructing an hydro power plant.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by rottennaija(m): 6:15am On Sep 02, 2019
Upgrade from 6MW to 40MW is commendable. Probably Kainji needs similar upgrade
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Celestyn8213: 6:15am On Sep 02, 2019
Easier said than done... We're watching
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by greatiyk4u(m): 6:16am On Sep 02, 2019
Soon it specified
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Rootprof(m): 6:18am On Sep 02, 2019
A whole FG wan commission ordinary 40mw or 40000mw huhIt's well with Nigeria.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by lifezone247(m): 6:18am On Sep 02, 2019
As I just open this thread, nepa just take light wey them bring 10minute ago.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by rottennaija(m): 6:19am On Sep 02, 2019
lilfreezy:
40mw chimoooooo grin

Restructure this country and let every region generate its own electricity and see if we won't have steady power. Power will bring investors. A state like Imo State alone is capable of generating 4000mw with its gas reserve. We know what to do but it must be business as usual.
The process of restructuring, even if started today will yield the desire results in decades, not the next 2 or 3 years. The same with effort to increase power supply, it will take more than 10 years for Nigeria to achieve stable 24 hours electricity.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by ArmaniUhuru: 6:20am On Sep 02, 2019
40 or 4000?

Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by winterfell007(m): 6:22am On Sep 02, 2019
lilfreezy:
40mw chimoooooo grin

Restructure this country and let every region generate its own electricity and see if we won't have steady power. Power will bring investors. A state like Imo State alone is capable of generating 4000mw with its gas reserve. We know what to do but it must be business as usual.
Seplat plc has begun the construction of ANOH gas processing plant capable of supplying 300mmscf of gas per day. Eastern region as a whole is replete with gas for industrialization while the northern region should use dams for hydroelectricity and irrigation for agriculture
A win-win situation for all.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Nobody: 6:22am On Sep 02, 2019
Positive move towards the right direction. Contact me for your quality 2kva 24v modified sinewave inverters for 39k with a year warranty. Call/WhatsApp. 09097430451

Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by anonimi:
twinskenny:
right but little by little we should get there
Why are you telling lies like this? grin
We are already there since with Fashola and barawo bubu in charge of change since 2015. Abi you no dey our kontri sincehuh


www.nairaland.com/attachments/9760331_7983202images1jpegd981a8b1fae6a56cbfd792de36a93677_jpeg_jpeg05f2a37058f47ccd54d587d7ac1e34f4
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by ThinkSmarter: 6:24am On Sep 02, 2019
Kudos to nigeria
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by flexyrule(m): 6:26am On Sep 02, 2019
40MW on the news?
Oh lawd! How did I end up in Nigeria?
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by anonimi: 6:27am On Sep 02, 2019
correctguy0900:
Baby steps. When naija go get 24 hours like other African countries.

Nigeria is one of the few countries left in darkness of the middle ages in the world.

Na we corrupt passhuh Kai!
You need to seriously update yourself o bros.
Have you been in the diaspora since baarawo bubu took over governmenthuh


We’ll generate 20,000mw of electricity in 4 years, says Buhari
Monday, February 2, 2015

The All Progressives Congress Presidential Campaign Organisation (APCPCO) on Sunday said it would provide 20,000 megawatts (mw) of electricity in the first four years of governance at the center. The party noted that its presidential candidate, General Muhammadu Buhari, if elected will improve the power situation significantly.

The proposed 20,000mw of electricity in four years will surpass Nigeria’s consumption level of around 15,000mw as at today.

https://www.pmnewsnigeria.com/2015/02/02/well-generate-20000mw-of-electricity-in-4-years-says-buhari/
www.nairaland.com/attachments/3492308_buhari20000mwelectricitypromise_jpegb3d308b82b0aaf0f68a6c50acecfbb5c
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Nobody: 6:28am On Sep 02, 2019
rottennaija:
The process of restructuring, even if started today will yield the desire results in decades, not the next 2 or 3 years. The same with effort to increase power supply, it will take more than 10 years for Nigeria to achieve stable 24 hours electricity.
when u restructure is is not the same leaders that would rulehuh Make una dey console una self
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by DAutoDiagnosis: 6:30am On Sep 02, 2019
cool
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Kaybaba5(m): 6:30am On Sep 02, 2019
We are improving
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by anonimi: 6:32am On Sep 02, 2019
ThinkSmarter:
Kudos to nigeria
Technology14:
Positive move towards the right direction.
Twenty47:
Nice one
Upon all the SOON that was written in the title and inside the story without date for evaluation of performance and delivery?
Why is it so easy to deceive us when we are not all 200 million mumus??


jarawa:
He said the dam and the hydropower components were completed since October 17, 2017; the evacuation project was at 90% level in June, 2019 and will be ready for power generation soon.
www.nairaland.com/attachments/3084794_DumbPeople_jpg287f2b4d3ead2f536f99f92cbca9c590
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by allthingsgood: 6:32am On Sep 02, 2019
lilfreezy:
40mw chimoooooo grin

Restructure this country and let every region generate its own electricity and see if we won't have steady power. Power will bring investors. A state like Imo State alone is capable of generating 4000mw with its gas reserve. We know what to do but it must be business as usual.
Under the constitution., Every state is already allowed to generate it's own power. Forget this restructure nonsense
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by Nobody: 6:32am On Sep 02, 2019
Not until we find way to swap to nuclear that electricity can be solved. Hydro, and other renewable systems are waste of resources in my opinion.
Re: FG To Commission 40MW Kashimbilla Hydropower Plant Soon by AnanseK(m): 6:33am On Sep 02, 2019
sonnie10:
Upon all the natural dams and water falls in the South, none of them is worth constructing an hydro power plant.
You’re right. The natural dams and waterfalls in the south lack the required vertical water load component and other criteria for effective dam construction. You will however notice that all the thermal electricity generation stations are in the south. Since you are a bigot you will not see logic or technical reasoning.