Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,920 members, 7,817,695 topics. Date: Saturday, 04 May 2024 at 05:28 PM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1481) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4391419 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1478) (1479) (1480) (1481) (1482) (1483) (1484) ... (3667) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abbyrose: 11:06pm On Jul 25, 2020
@EgunMogaji2

Anything is possible. It’s based on negotiations.

I’ve never been asked nor have I paid for an estimate before.

However I always make sure to compensate artisans for taking time out of their day to honor my invite.

If the request grinds your gear just go to another artisan.

Good luck on your project.


Thank you, I was surprised that he ASKED for N5k to give me a quotation. I never experienced it before either, but like you rightly said I am definitely looking for another person.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 11:07pm On Jul 25, 2020
One of the reason I love Ibadan! Life is easy there cool
EgunMogaji2:


When I hear these prices I’m happy that I only build in Ibadan.

I got 20 tons delivered yesterday for N75K in Omi Adio.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:10pm On Jul 25, 2020
Abbyrose:
@Donwizfit2
no contractor does not charge for quotation but you can show him or give him token for appreciation

Thanks for your response. I wasn't expecting him to charge for giving a quotation. Yes, giving something in appreciation is a good gesture which I don't mind.


You didn’t get “akin4sure” right, you asked for estimate of materials NOT quotation as contractor.
So the man charged you as QS to give estimate for the materials etc (bill of quantity) Not as a contractor biding for work.

6 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 11:15pm On Jul 25, 2020
One thing some people don't know is that manner is very important in work! Same thing happens last week when a brick installer working on my brother's project said I will be the one to provide water for him because we don't have running water on site. I see altitude like that as proudness!
EgunMogaji2:
Hello.

My Tiler just delivered this work as finished. When I inquired about the cement “film” on the surface he claims that cleaning it is not part of his package. That it requires chemical and is extra work to be paid for.

Is this industry standard or is he taking a piss?

Thanks.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 11:17pm On Jul 25, 2020
I wish most of us can be doing this undecided
michlins:
these things don't have industrial standard. I think a worker should deliver a perfect job. Cleaning the tiles won't take him more than two days. It will endear him to you and tomorrow you are definitely going to look for him. Some people don't understand how competitive the market is becoming. A single job can bring a million more to you
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by diordaves(m): 11:23pm On Jul 25, 2020
Abolarin91:
One thing some people don't know is that manner is very important in work! Same thing happens last week when a brick installer working on my brother's project said I will be the one to provide water for him because we don't have running water on site. I see altitude like that as proudness!

It is your brother's responsibility to provide water though.

9 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mufutau55(m): 11:31pm On Jul 25, 2020
Abolarin91:
One thing some people don't know is that manner is very important in work! Same thing happens last week when a brick installer working on my brother's project said I will be the one to provide water for him because we don't have running water on site. I see altitude like that as proudness!

Proudness? Whom do you want to provide water?
The Client always has to provide water not the bricklayers. That is more reason it is better to first drill a borehole on your project before you commence, it is more economical too.

Hajji M.

12 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 11:36pm On Jul 25, 2020
Abolarin91:
I wish most of us can be doing this undecided
most of us won't be successful in our field. That's why most of us won't know that
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 11:54pm On Jul 25, 2020
playces:
We did the oversite concrete 2 days ago and today wen I visited the site, I discovered cracks almost all over the surface of the floor. There was rainfall that lasted for 10/12 yst. And another saddening part is that the verandah part was noticeably depressed. Size of the oversite is 4 inches.
Pls I need your advice on the way forward. I feel totally sad about it

Its simple - The filling was not well compacted, (wet and compact in layers next time - for best results)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by lawofeso: 12:37am On Jul 26, 2020
folmus:


How is development in Igode now?

The area is being built up as we speak
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyiwaolu: 12:38am On Jul 26, 2020
I am planning to production of 9" and 6" blocks for a property at Osun State. I am looking to build rates for this blocks. Anyone has an idea how I can achieve this?

Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by folmus: 2:25am On Jul 26, 2020
lawofeso:


The area is being built up as we speak

Thank you. My bro has a plot there with foundation done.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Pascopele: 4:57am On Jul 26, 2020
Queenserah26:
Good Evening Everyone,

Kindly contact Seradale Ventures for your quality Waterproofing Chemicals at affordable prices.
Nationwide delivery is available.
Hello! I have cracks in my wall can I have your contacts?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Biztech05(m): 5:08am On Jul 26, 2020
BEST QUALITY WORK 
@
friendly and reliable price!

Contact Biztech consult we always ready to serve and give you Best of the best.

Call us for any of your construction projects

** AS SITE SUPERVISOR
**PROJECT MANAGER
**AS A CONSULTANT

Let handle your project for you today and relief from the stress.
Remember what's doing right always being good 

Email; Biztech05@yahoo.com
Phone/ WhatsApp ::+2347066483964
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DaBogu: 5:09am On Jul 26, 2020
Please what's can be done to remedy the situation of the crack wall in the picture below

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Takoro13(m): 5:10am On Jul 26, 2020
Muyiwaolu:
I am planning to production of 9" and 6" blocks for a property at Osun State. I am looking to build rates for this blocks. Anyone has an idea how I can achieve this?

Thanks
where in osun state
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by DaBogu: 5:14am On Jul 26, 2020
mufutau55:


Exactly what I can see, the concrete mix ratio is ver my low. Look, you can hardly see any cement/granite mix but sand. And looks like filling was not well compacted either.
Look at the picture #2 for the lousy mix-ratio.

Hajji M.
Sir, please help me with the picture above. Thank you in advance.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 7:05am On Jul 26, 2020
Looking at the edge of the crack I noticed there no enough mixing ratio, this is bad. Engineers in the house pls help
playces:
We did the oversite concrete 2 days ago and today wen I visited the site, I discovered cracks almost all over the surface of the floor. There was rainfall that lasted for 10/12 yst. And another saddening part is that the verandah part was noticeably depressed. Size of the oversite is 4 inches.
Pls I need your advice on the way forward. I feel totally sad about it
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by drkay(m): 7:25am On Jul 26, 2020
DaBogu:
Please what's can be done to remedy the situation of the crack wall in the picture below
Hmmm, interesting.
As a layman that I am, I think that building should be sitting on a raft foundation which I dont think it is.
That foundation is not stable.
Solution to this(I pray there's one) may be very costly and/or temporary.
Let's see what the elders have to say.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 8:14am On Jul 26, 2020
These are the major reasons! I pray God provide enough for everyone of us to consult professional and also give us the spirit to cherish the value of professionals grin[quote author=rotecch77 post=92105972][/quote]
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 8:16am On Jul 26, 2020
EgunMogaji2:


My current site is at Omi Adio and some of the prices are location dependent.

6” blocks N170
9” blocks N185
20 ton plaster sand N30K
20 ton granite N75K
Cement to site N2,600

Moniya, Ojoo, Eleyele axis...

Stone dust blocks..
6” blocks N170
9” blocks N210

Ordinary blocks
6” blocks N150
9” blocks N180

20 ton plaster sand N40K
20 ton granite N90K
Cement to site N2,600
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by KolaShangOne(m): 8:31am On Jul 26, 2020
playces:


Thanks for ur comment. After filling, it was mechanically rammered after which the oversite was done.
What is the way forward pls.

1.) Are you Sure? If yes, please show us picture proof that it was well compacted.

2.) What material.did you use in filling void spaces? The material used if you want to do your "German floor" immediately after filling IS different from what you use when you want to give room for natural compaction.

3) I've seen people use rubbish to fill. They called it condemned sharp sand. It contained grasses, nylon, plastic etc
Infact it was brought to my site by the client and when I rejected it, the supplier claimed I'm not happy because I wasn't buying materials.

4. I'll like to note that.. Sometimes, people can't afford professionals. So we can help them from here. Infact I want to upload YouTube videos on how to build a 3 bedroom from start to finish.

4 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 8:38am On Jul 26, 2020
So the client should go and fetch water for him or what, when there is water in the next house?
diordaves:


It is your brother's responsibility to provide water though.

2 Likes 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abolarin91(m): 8:44am On Jul 26, 2020
Sir, there is water close to the site. What he wanted is that we should get someone to fetch the water for him
I also work outside, recently I work for a nairalader at ikorodu, we only talk on phone and he directed me to her house, will I call her to come and get me water? When we are not in a desert grin
mufutau55:


Proudness? Whom do you want to provide water?
The Client always has to provide water not the bricklayers. That is more reason it is better to first drill a borehole on your project before you commence, it is more economical too.

Hajji M.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ollykay619(m): 9:12am On Jul 26, 2020
EgunMogaji2:


When I hear these prices I’m happy that I only build in Ibadan.

I got 20 tons delivered yesterday for N75K in Omi Adio.

Good day sir, I am been charged 90k for 20 tons in ibadan, mosfala area. Can I get the supplier contact?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 9:16am On Jul 26, 2020
DaBogu:
Please what's can be done to remedy the situation of the crack wall in the picture below
Causes:
1) Foundation
When I see defects or settlements such as this on building, the first thing I will ask is "is the foundation done properly or better still if the right foundation type was used."

2) Ineffective bonding between the blocks and mortar

Remedy

Get a structural engineer to help you determine if the crack is a major or minor one.
If the latter is the case, before plastering, he should re add mortar to those crack lines in other to create a better bond between the mortar and block wall

Then nail chicken nets to that area before plastering as shown in the attached picture

CharisDesign

8 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by psychologist(m): 9:21am On Jul 26, 2020
.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 10:00am On Jul 26, 2020
EgunMogaji2:


When I hear these prices I’m happy that I only build in Ibadan.

I got 20 tons delivered yesterday for N75K in Omi Adio.
Agbalagba, i hail ooo i still pondering over this, but a ton of granite in ibadan is N3,000/ton x20=N60,000, N15k for transportation that means the quarry is 4 street to your site, or perhaps magomago don enter... The closest Quarry to your location is CNC Quarry but stop working long time ago, hence the closest is Odeda Quarry, Ogun State.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by JustCryptos: 10:05am On Jul 26, 2020
KolaShangOne:



3) I've seen people use rubbish to fill. They called it condemned sharp sand. It contained grasses, nylon, plastic etc
Infact it was brought to my site by the client and when I rejected it, the supplier claimed I'm not happy because I wasn't buying materials

@ point 3. My site engineer recommended I buy condemned sharp sand instead of laterite for filling. So, this will be the end result. Thanks man.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Neweko: 10:05am On Jul 26, 2020
Morning All,


What can be done to these crack pls.
Building is over 10yrs old

cc
@Charisdesigns
@Aventure
@spyder880
@gabbytabby- Help me show your trusted people. Still grateful for all the reliable workmen

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Wyloutproperty: 10:40am On Jul 26, 2020
nannymcphee:
Please can someone help out. how do I maximize this space?

1. The estate rule is that the building should have 3m space on the back and sides, while 6m in the front

2. I had the concept of 1unit of 3bedroom and 2units of 2bedroom bungalow in mind. I plan to demarcate the 3bedroom from the 2bedroom. Everyone goes in through the 2bedroom side. occupants of 3bedroom goes to their side. The estate does not allow 2 external Gates into the land but will turn a blind eye to an internal one. I equally need space on the 3bedroom side.

3. If 2 is not feasible in terms of getting space on the 3bedroom space, I might consider story building. 4units. 3bedroom and 2bedroom on ground floor, then same on 1st floor. my issue with this is funds for completion and I will have to share space with the occupant on 1st floor on the 3bedroom side. 3bedroom duplex attached with 2units of 2bedroom story building will give me the Isolated space I need on the 3bedroom side.


4. Please can someone share ideas with me

Summary:I want to maximize space, have a personal building(3bedroom) cut off from the tenants then building for tenancy(estate rule, not more than 4flats for this land). I am on a budget too. if I build my 3bedroom now, I will have to reapply for another building approval to add additional structures hence the need to capture everything once(Approval cost 100k)

Rent in this Estate goes for

2bedroom goes for 220-250k PA

1bedroom goes for 130-160k PA

Self contain goes for 84-120k PA

CC
mufutau55
spyder880
abdulwastecx
erico2k2 et al






Good day Ma,

You can contact us at WYLOUT DESIGNS LIMITED if you are still in need of the services of a Building consultant, Architect/Design and Materials engineers. We are builders with specialization in renovations and building remodeling. Kindly contact Alex on 08170406903 or Victor on 08034356667.

Thanks.

(1) (2) (3) ... (1478) (1479) (1480) (1481) (1482) (1483) (1484) ... (3667) (Reply)

Viewing this topic: 3 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 62
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.