Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,812 members, 7,820,869 topics. Date: Tuesday, 07 May 2024 at 11:48 PM

Construction Of Mini Bakery/ Office Space By Rotech77 - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of Mini Bakery/ Office Space By Rotech77 (19088 Views)

Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 / The Benin Kingdom Project By Rotech77 / The Finishing Of Osun State Edifice By Rotech77 (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 6:09pm On Dec 13, 2020
Lintel and columns formwork is in progress
Watch out for the pics
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 8:49am On Dec 14, 2020
Pics update

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 5:45pm On Dec 14, 2020
More pics update

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 6:07pm On Dec 16, 2020
Casting in the upper columns and lintel done
Pics coming soon
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by kopell: 6:39pm On Dec 16, 2020
rotecch77:
Casting in the upper columns and lintel done
Pics coming soon
Well done jare, you proof to us even with little budget things can be done without compromising safety.

1 Like

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 8:57pm On Dec 16, 2020
kopell:
Well done jare, you proof to us even with little budget things can be done without compromising safety.

Yes...its possible to achieved
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 10:05am On Dec 18, 2020
More coming
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 5:54pm On Dec 19, 2020
Block settings to hiding roof evel is on the way.
Also we are starting our finishing work of the project such as soon.
-Plastering
- glassing
-partitioning
-electrical work
-Plumbing work
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 5:16pm On Dec 21, 2020
Update pics

The final laps for the sum of 2.5m for carcass of this building is almost here.

Budget for the flat roof here is only
N300,000
This cover cost of

**Wood work***
Plank
Nail
Labour
Logistic

**Covering**
Long span aluminum
Accessories
Logistic

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 10:02am On Dec 24, 2020
Update pics soon
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by akinola98: 2:36pm On Dec 24, 2020
rotecch77:
Block settings to hiding roof evel is on the way.
Also we are starting our finishing work of the project such as soon.
-Plastering
- glassing
-partitioning
-electrical work
-Plumbing work

Well done Rotecch for the job so far

I like the hidden roof style ( contemporary design) but when it rains.... water can splash ontop and sides of the block settings covering the roof ..... this can soak the block and drip inside the house damaging the paint .... how do u prevent this from happening?

I know to get such damages above can take some months or years to occur thou
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 3:37pm On Dec 24, 2020
akinola98:


Well done Rotecch for the job so far

I like the hidden roof style ( contemporary design) but when it rains.... water can splash ontop and sides of the block settings covering the roof ..... this can soak the block and drip inside the house damaging the paint .... how do u prevent this from happening?

I know to get such damages above can take some months or years to occur thou

Thanks for your time here.
Truly all aspect of building components needs maintenance. But
There is a way to do handle all aspects of building construction work perfectly.
When a competent building personnel handle building job, my brother nothing to be worried about.

2 Likes

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 9:03am On Dec 26, 2020
Pics update coming soon
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 9:41am On Dec 27, 2020
Still on the way
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 5:29am On Dec 29, 2020
Watch out for the finishing of this contemporary structure.
Call on us if you want same.

Fully DIY approach can’t give you what real structure entails from scratch to finishings stage.
Let’s building professionals handle your project.

Fact.

2 Likes

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 3:39pm On Jan 01, 2021
WELCOME TO YEAR 2021

Watch out for new restructuring of our firm ..
Range from client brief to delivery of the project

1 Rotech building concept
2 Arbo contractor Ltd
Both are fully registered firm with CAC

Architectural drawing
Construction
Renovation work
Mini estate road

Our team includes
*Builder
*architect
*structural engr

Our skilled workers includes
* plumber
*tiler
* bricklayer
*iron bender/welder
*finishings installer (pop, painters, artwork men)
*carpenter/ joinery

Mail: Rotech77@yahoo.co.uk
Direct contact;08066619493



Update on this project coming soon
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 10:00am On Jan 02, 2021
Roof carcass done
Pics coming soon
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 1:04pm On Jan 02, 2021
Roof wood work and Aluminum cover cost update

Total cost of wood, nail with transport N75,000
Carpenter N20,000
Aluminum 0.55mm gauge with transport and installation cost N245,000

Total cost N340,000

The flat roof really save us a lot of Money here.
If it’s hipped roof we will spend about
N650,000
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 5:20pm On Jan 03, 2021
Why going far when you have us around you to handle these services at reduce cost

New building construction
Architectural Drawing
Renovation work
Finishing work(tiling, painting etc)
Plumbing
Electrical
Mini road

08066619493
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 3:34pm On Jan 04, 2021
Plastering loading
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by Myhelper1: 7:35pm On Jan 05, 2021
rotecch77:
Plastering loading
Sir, are you still under 3million budget for this project?

1 Like

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 8:35pm On Jan 05, 2021
Myhelper1:
Sir, are you still under 3million budget for this project?

The thing shock you? Don’t worry my brother
Actually the 2.5m budget is for only the carcass only and we have delivered that.

Now we are in finishing stage
Plastering
Glassing
Tiling
Electrical
Plumbing
Which is another cost separately

2 Likes

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by Myhelper1: 9:57pm On Jan 05, 2021
.

1 Like

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 7:35am On Jan 06, 2021
Myhelper1:
I'm not surprised, because you always say it as it is. Note me down for same kind of project and I will come back here to testify of your great work. Weldone sir!

Thanks so much I will be expecting.

1 Like

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 10:11am On Jan 09, 2021
Plastering loading
Watch out
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by Greenarrow01(m): 1:26pm On Jan 09, 2021
Good morning
Oga rotech
Pls don't be angry with my question sir.
I have been following this thread since first day. And I love your work.
I will like to ask a question regarding this project
It Been going on for over 2 months now.
In my thinking.
I thought it won't be more than 6-8 weeks max ooo
Pls can you enlighten me.
Is it because of lack of steady funds or what
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 2:08pm On Jan 09, 2021
Greenarrow01:
Good morning
Oga rotech
Pls don't be angry with my question sir.
I have been following this thread since first day. And I love your work.
I will like to ask a question regarding this project
It Been going on for over 2 months now.
In my thinking.
I thought it won't be more than 6-8 weeks max ooo
Pls can you enlighten me.
Is it because of lack of steady funds or what

You are right, it’s about two month now.
If you check front page you will notice that I programmed the carcass of the building for 55days ( equivalent 2months)

But if you want such in 6weeks we can deliver it
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 3:14pm On Jan 10, 2021
More coming

1 Like

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 7:23am On Jan 12, 2021
Plastering update pics will surface soon.
Watch out !
Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 9:18pm On Jan 15, 2021
Current update pics

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(m): 2:19pm On Jan 16, 2021
More pics

Re: Construction Of Mini Bakery/ Office Space By Rotech77 by AreaFada2: 5:08pm On Jan 16, 2021
Nice work. Kudos.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)

4 Bedroom Duplex At Agege Lagos State,design & constructed by archaran / Borehole Owners In Aba To Pay 30k Fee / Residential Building Burnt Down By Electric Spark In Benin City (photos)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 32
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.