Thank you for following, been looking at other ways to be more productive as a person and as a team member due to the current realities in the country as a whole. Meanwhile a couple of letters of completion we got aside from the initial ones posted are attached. Happy New Year To Every One Who reads this. I wish U peace,happiness and greatness in the year 2017.
|
justi4jesu:Hi,Added you on bbm, you are yet to accept. |
texasbullet:Please take note that tbc is different from btc. |
Hello everyone, been quite busy, rounded up an office renovation and remodeling in Asaba, still working on their zonal office in Kano and doing a renovation in Bode-Thomas, Surulere, Lagos. Pictures and updates will come soon. Merci EgunMogaji and Gbadexy. |
Thanks for the mentions and possible referrals EgunMogaji and gbadexy. Grateful much!!! Ese. Got attached yesterday on the radio station development.
|
Cont'd
|
Floor Screeding done,underlay and rug expected. Interior designers expected with furniture etc Walkway leading to external toilet done Time to party. Thank you for viewing. Chief Egunmogaji, gracias.
|
gbadexy:Thank you. |
Progress Photos Cont'd... Suspended Ceiling Installation and floor screeding
|
Finishing Stages Bulk heads used to mirror the deep and large sized beams supporting the slab on the existing build. At this point it was clear the floor marbles were not going to arrive the country before the intended use of the hall. A mentor,Mr.Bisi decided it was best to screed the floor with lean mix concrete that can be easily taken off when required. the plan was to screed and then have a rug laid on both areas.
|
nija4us:3.2 as at 1.18pm |
gbadexy:Hi Boss; you spoke of creating a sump and also creating aprons the way a raft slab can be extended at the bottom (like heel something like a humans feet in spreading body weight). I really don't know the scenario but what u have written can help reduce water from one place into the sump and can also reduce load from an area by spreading outwards. Kudos!!! |
Stress Free Pools Are Things of Pride n Joy when one is still young and full of energy. You just want to take a dip,take a picture,invite friends over etc.
|
progress photos let's see the joint on this side of the building tiling of column sides cont'd terrace tiling electricals cont'd EgunMogaji,thank you for the mention.
|
Greetings to everyone in the house. Egun, thanks for the mention. |
Progress Photos and report; scenario...the initial building has a roof deck before the aluminium roof which houses birds, reduced the sound effects of rainfall and also acts as thermal insulator. Now, we cannot have another slab for time constraints and we ended up using vitapur insulation which was going to do exactly what we needed, thermal insulation and helps with sound as well because of the sprayed foam. Electrical works continued,tiling of internal columns started.
|
Progress made; Installation Of Windows Fixing of marbles cont'd;
|
More progress Photos i learnt something new whilst on this project. Plastering and tiling was done almost concurrently as opposed to the more common method of plastering and rubbing so as to allow the surface to be a bit rough for adhesion of cement and tiles over it. The plastering was done and some metal fasteners were fixed( because of the weight of marble) and then the marble were adhered to the surface after the addition of cement paste as usual.
|
Hi Boss, I would like to know why you have double walls in some (internal)areas? |
EgunMogaji:Thought u've roofed the garage already and on the main building now? No job is too small or too big Boss. PM or straight on your thread? |
progress photos...
|
Week 5 1. Internal marble laying cont'd 2. Exterior wall marble laying 3. M n E cont'd
|
EgunMogaji:Thanks Boss Egun, na Grace o as I'm just a regular builder. 1. Aluminium fascia 2. Fixing of internal wall marbles
|
Week 4 cont'd 1.Roof Covering 2.Window aluminium sub-frames installation. 3. electrical works
|
week 4 cont'd Roofing Carcass Roof Covering Roof insulation Thank you for viewing.
|
week 4 1. blocksetting to lintels cont'd ad finished 2. terrace concreting 3.fabrication of aluminium roof trusses
|
Week 3 Cont'd I didnt cast no roof beams again because i was using light weight aluminium trusses and also light weight aluminium roof covering but one thing i did do was to short columns(linked to lintels) where i had steel tapes like ''oja agba'' to anchor roof members down to the structure.
|
Week 3 1. Blocksetting 2. Rebars/formwork/casting of columns 3. Formwork/Rebars and casting of lintels and overhang( lintels shoots out on either side)
|
During Concreting ...
|
more progress photos... we worked at nights at times. 1. DPM( thick nylon) 2.Blinding 3. laying of A142 wire mesh 4. Concreting: 1 no concrete mixer was used. Regards, RichYoungRuler for Rich Ruler Ltd.
|
nextstep:Hi Boss, just a question, do you think using a thick membrane like tarpaulin or thick gauge nylons before installing the panels could have worked? |
Week 2 Backfilling Compaction levelling Compaction Damp Proof Membrane Laying Blinding
|