Sarrki's Posts
Nairaland Forum › Sarrki's Profile › Sarrki's Posts
1 2 3 4 5 6 7 8 ... 753 754 755 756 757 758 759 760 761 (of 1040 pages)
I Don't even know what to say |
The leadership of Movement for the Actualization of the Sovereign State of Biafra, MASSOB, has revealed that some traditional rulers have joined up in the pro-Biafra struggle.http://dailypost.ng/2017/03/31/tension-traditional-rulers-200-others-join-massob-enugu/
|
eph123:Live with it |
freeze001:Madame as an enlightened person Go through the budget ... The categories are from priority ONE to FOUR... PRIORITY ONE The projects under Priority 1, are termed as "national priority projects", are projects on critical economic routes on the federal road network. These are highly trafficked North-South, East-West routes used for the distribution of goods and services across the country and major river-crossing bridges. The sum of N150,470,553,292, which represents 62.22 per cent, is proposed to execute national priority 1 projects in 2017...These are; 1) Construction of Second Niger Bridge 2) Construction of the dual carriageway of Abuja-Abaji-Lokoja (Sections I-IV) in FCT/Kogi State 3) Construction of the Kano-Maiduguri dual carriage Road (Sections I-V) in Kano/Bauchi/Yobe/Borno states 4) Rehabilitation of Enugu-Port Harcourt Dual Carriageway (Sections I-IV) in Enugu/Abia/Rivers states 5) Rehabilitation/reconstruction of the Lagos-Shagamu-Ibadan Expressway in Lagos/Oyo states 6) Construction of Loko-Oweto Bridge in Nasarawa/Benue states 7) Reconstruction of outstanding sections of Benin-Ofosu-Ore-Sagamu Road in Edo/Ondo/Ogun states Rehabilitation of Odukpani-Itu-Ikot Ekpene Road section I: Odukpani-Itu Bridgehead9) Rehabilitation of Ilorin-J’ebba-Mokwa Road PRIORITY TWO On the list of projects given second priority, are projects being executed along the branch routes from the critical economic routes on the federal road network... ...These roads serve as links between the major routes and agricultural producing hubs, factories and mining deposits for the evacuation of agricultural produce, manufactured goods and raw materials to markets and ports across the country. The sum of N43,143,299,357, which represents 17.84 per cent, is proposed to execute National Priority 2 projects in 2017...These are; 1) Dualisation of Sapele-Ewu Road in Delta/Edo states 2) Dualisation of Lagos-Ota-Abeokuta Road in Lagos/Ogun states 3) Rehabilitation of Hadejia-Nguru-Gashua-Bayamari road in Jigawa/Yobe states 4) Rehabilitation of Ilorin-Kabba-Obajana Road in Kwara/Kogi states. 5) Rehabilitation of Yola-Mubi Road 6) Rehabilitation of Owerri-Umuahia Road in Imo/Abia states 7) Dualisation of Yenegwe Road Junction-Kolo-Otuoke-Bayelsa Palm in Bayelsa State Rehabilitation of Damaturu-Biu Road BornoPRIORITY THREE These projects are specifically targeted at routes leading to the nation’s refineries, petroleum depots, major ports and mineral producing areas in the country to ease the movement of petroleum products and imported goods from the ports and depots to other parts of the country. The sum of N25,508,708,266, which represents 10.55 per cent, was proposed to execute national priority 3 projects in 2017...Some of the projects are; 1) Rehabilitation of Apapa-Oshodi Expressway in Lagos Phase I & II 2) Dualisation of Suleja-Minna Road 3) Construction of Bodo-Bonny Road with a bridge across the Opobo channel in Rivers State 4) Access road to Apapa/Tin Can Port, NNPC Depot (Atlas Cove) to Mile 2 5) The construction of Agaie-Katcha-Baro Road PRIORITY FOUR Roads given priority 4 are those in key agricultural states producing cash crops like yam, rice, maize, cassava, fruits, etc. The objective is to boost the production of these crops and ease their movement to markets. This is to enhance food sufficiency in the country and minimize losses. N8.9bn which represents 3.68 per cent, is proposed to construct and rehabilitate roads in this category...Such projects include; 1) The rehabilitation of Sokoto-TambuwaI-Jega-Kontagora-Makera in Sokoto/Kebbi states 2) Rehabilitation of Otukpo-9th Mile-Enugu-Port Harcourt dual carriageway in Benue/Enugu states 3) Rehabilitation of Abakaliki-Afikpo Road in Ebonyi State; 4) Rehabilitation of Akure-Ondo Road in Ondo State 5) Rehabilitation of Aba-Azumini-Opobo Road (Aba-Azumini section) in Abia State 6) Rehabilitation of Wukari-Mutum Biyu-Jalingo-Numan Road Section I: Wukari-Mutum Biyu Road in Taraba State. SOURCE: Power, Works & Housing Ministry #PMBAtWork |
eph123:Live with it baba is the C in C |
NDPVF:... The categories are from priority ONE to FOUR... PRIORITY ONE The projects under Priority 1, are termed as "national priority projects", are projects on critical economic routes on the federal road network. These are highly trafficked North-South, East-West routes used for the distribution of goods and services across the country and major river-crossing bridges. The sum of N150,470,553,292, which represents 62.22 per cent, is proposed to execute national priority 1 projects in 2017...These are; 1) Construction of Second Niger Bridge 2) Construction of the dual carriageway of Abuja-Abaji-Lokoja (Sections I-IV) in FCT/Kogi State 3) Construction of the Kano-Maiduguri dual carriage Road (Sections I-V) in Kano/Bauchi/Yobe/Borno states 4) Rehabilitation of Enugu-Port Harcourt Dual Carriageway (Sections I-IV) in Enugu/Abia/Rivers states 5) Rehabilitation/reconstruction of the Lagos-Shagamu-Ibadan Expressway in Lagos/Oyo states 6) Construction of Loko-Oweto Bridge in Nasarawa/Benue states 7) Reconstruction of outstanding sections of Benin-Ofosu-Ore-Sagamu Road in Edo/Ondo/Ogun states Rehabilitation of Odukpani-Itu-Ikot Ekpene Road section I: Odukpani-Itu Bridgehead9) Rehabilitation of Ilorin-J’ebba-Mokwa Road PRIORITY TWO On the list of projects given second priority, are projects being executed along the branch routes from the critical economic routes on the federal road network... ...These roads serve as links between the major routes and agricultural producing hubs, factories and mining deposits for the evacuation of agricultural produce, manufactured goods and raw materials to markets and ports across the country. The sum of N43,143,299,357, which represents 17.84 per cent, is proposed to execute National Priority 2 projects in 2017...These are; 1) Dualisation of Sapele-Ewu Road in Delta/Edo states 2) Dualisation of Lagos-Ota-Abeokuta Road in Lagos/Ogun states 3) Rehabilitation of Hadejia-Nguru-Gashua-Bayamari road in Jigawa/Yobe states 4) Rehabilitation of Ilorin-Kabba-Obajana Road in Kwara/Kogi states. 5) Rehabilitation of Yola-Mubi Road 6) Rehabilitation of Owerri-Umuahia Road in Imo/Abia states 7) Dualisation of Yenegwe Road Junction-Kolo-Otuoke-Bayelsa Palm in Bayelsa State Rehabilitation of Damaturu-Biu Road BornoPRIORITY THREE These projects are specifically targeted at routes leading to the nation’s refineries, petroleum depots, major ports and mineral producing areas in the country to ease the movement of petroleum products and imported goods from the ports and depots to other parts of the country. The sum of N25,508,708,266, which represents 10.55 per cent, was proposed to execute national priority 3 projects in 2017...Some of the projects are; 1) Rehabilitation of Apapa-Oshodi Expressway in Lagos Phase I & II 2) Dualisation of Suleja-Minna Road 3) Construction of Bodo-Bonny Road with a bridge across the Opobo channel in Rivers State 4) Access road to Apapa/Tin Can Port, NNPC Depot (Atlas Cove) to Mile 2 5) The construction of Agaie-Katcha-Baro Road PRIORITY FOUR Roads given priority 4 are those in key agricultural states producing cash crops like yam, rice, maize, cassava, fruits, etc. The objective is to boost the production of these crops and ease their movement to markets. This is to enhance food sufficiency in the country and minimize losses. N8.9bn which represents 3.68 per cent, is proposed to construct and rehabilitate roads in this category...Such projects include; 1) The rehabilitation of Sokoto-TambuwaI-Jega-Kontagora-Makera in Sokoto/Kebbi states 2) Rehabilitation of Otukpo-9th Mile-Enugu-Port Harcourt dual carriageway in Benue/Enugu states 3) Rehabilitation of Abakaliki-Afikpo Road in Ebonyi State; 4) Rehabilitation of Akure-Ondo Road in Ondo State 5) Rehabilitation of Aba-Azumini-Opobo Road (Aba-Azumini section) in Abia |
NDPVF:You Always promote regional politics |
... The categories are from priority ONE to FOUR... PRIORITY ONE The projects under Priority 1, are termed as "national priority projects", are projects on critical economic routes on the federal road network. These are highly trafficked North-South, East-West routes used for the distribution of goods and services across the country and major river-crossing bridges. The sum of N150,470,553,292, which represents 62.22 per cent, is proposed to execute national priority 1 projects in 2017...These are; 1) Construction of Second Niger Bridge 2) Construction of the dual carriageway of Abuja-Abaji-Lokoja (Sections I-IV) in FCT/Kogi State 3) Construction of the Kano-Maiduguri dual carriage Road (Sections I-V) in Kano/Bauchi/Yobe/Borno states 4) Rehabilitation of Enugu-Port Harcourt Dual Carriageway (Sections I-IV) in Enugu/Abia/Rivers states 5) Rehabilitation/reconstruction of the Lagos-Shagamu-Ibadan Expressway in Lagos/Oyo states 6) Construction of Loko-Oweto Bridge in Nasarawa/Benue states 7) Reconstruction of outstanding sections of Benin-Ofosu-Ore-Sagamu Road in Edo/Ondo/Ogun states Rehabilitation of Odukpani-Itu-Ikot Ekpene Road section I: Odukpani-Itu Bridgehead9) Rehabilitation of Ilorin-J’ebba-Mokwa Road PRIORITY TWO On the list of projects given second priority, are projects being executed along the branch routes from the critical economic routes on the federal road network... ...These roads serve as links between the major routes and agricultural producing hubs, factories and mining deposits for the evacuation of agricultural produce, manufactured goods and raw materials to markets and ports across the country. The sum of N43,143,299,357, which represents 17.84 per cent, is proposed to execute National Priority 2 projects in 2017...These are; 1) Dualisation of Sapele-Ewu Road in Delta/Edo states 2) Dualisation of Lagos-Ota-Abeokuta Road in Lagos/Ogun states 3) Rehabilitation of Hadejia-Nguru-Gashua-Bayamari road in Jigawa/Yobe states 4) Rehabilitation of Ilorin-Kabba-Obajana Road in Kwara/Kogi states. 5) Rehabilitation of Yola-Mubi Road 6) Rehabilitation of Owerri-Umuahia Road in Imo/Abia states 7) Dualisation of Yenegwe Road Junction-Kolo-Otuoke-Bayelsa Palm in Bayelsa State Rehabilitation of Damaturu-Biu Road BornoPRIORITY THREE These projects are specifically targeted at routes leading to the nation’s refineries, petroleum depots, major ports and mineral producing areas in the country to ease the movement of petroleum products and imported goods from the ports and depots to other parts of the country. The sum of N25,508,708,266, which represents 10.55 per cent, was proposed to execute national priority 3 projects in 2017...Some of the projects are; 1) Rehabilitation of Apapa-Oshodi Expressway in Lagos Phase I & II 2) Dualisation of Suleja-Minna Road 3) Construction of Bodo-Bonny Road with a bridge across the Opobo channel in Rivers State 4) Access road to Apapa/Tin Can Port, NNPC Depot (Atlas Cove) to Mile 2 5) The construction of Agaie-Katcha-Baro Road PRIORITY FOUR Roads given priority 4 are those in key agricultural states producing cash crops like yam, rice, maize, cassava, fruits, etc. The objective is to boost the production of these crops and ease their movement to markets. This is to enhance food sufficiency in the country and minimize losses. N8.9bn which represents 3.68 per cent, is proposed to construct and rehabilitate roads in this category...Such projects include; 1) The rehabilitation of Sokoto-TambuwaI-Jega-Kontagora-Makera in Sokoto/Kebbi states 2) Rehabilitation of Otukpo-9th Mile-Enugu-Port Harcourt dual carriageway in Benue/Enugu states 3) Rehabilitation of Abakaliki-Afikpo Road in Ebonyi State; 4) Rehabilitation of Akure-Ondo Road in Ondo State 5) Rehabilitation of Aba-Azumini-Opobo Road (Aba-Azumini section) in Abia State 6) Rehabilitation of Wukari-Mutum Biyu-Jalingo-Numan Road Section I: Wukari-Mutum Biyu Road in Taraba State. SOURCE: Power, Works & Housing Ministry #PMBAtWork https://www.google.com.ng/amp/www.premiumtimesng.com/news/headlines/222807-works-minister-fashola-lists-top-federal-road-projects-2017.html/amp
|
99100:Then leave |
eph123:The truth is don't sit down in wadata plaza with the smug look on your face and quote one if the most dubious and cunny politicians on earth it's out if sheer hatred for pmb |
All the so called leaders are tyrants When they are not favored politically they make divisive statements Why didn't Gej do the needful |
[quote author=orunto27 post=55125805][/quote]uncle quote rightly |
eph123:Let me educate you its not about notherner supporting him or not Wherever you come from so fat you are a progressive I don't care sis don't just sit down in the confine of your room and make us regret the line we tow THE TRUTH IS WE DONT |
President99:Ibb supported Gej Don't get it twisted |
eph123:I will agree with those that supported him from the word go Most of wailers is sheer hatred You don't know what they call constructive criticisms |
eph123:Then south is south |
eph123:Kperogi is from north central same way we classified the south so get that sis |
Babacele:Baba needs to do something If not he will loose his sincere followers |
Nukualofa:The truth is they should leave all this divide and rule 8 years in the north then south east too taste it for equality and fair play |
xoxo001:Make baba Lala know hear you oooooo |
Nukualofa:Are you one of the Atiku boiz? |
eph123:Kperogi is in Babangidas camp what do you expect? in the south are we that united? same to the north wake up |
Nukualofa:The truth is either we hide it or not Every region will clamor for the number one seat 1) Harmony 2) Unity 3) sense of belonging No one is slave to one another What is good for the goose is also good for the gander The truth |
Just because that you guys are scared of your re elections your governors won't allow you guys Nigeria can't continue this way |
Likewise Yours sir |
Baba prophet you are not God!!!!!! |
Omooba77:Lol which duty baba |
Alisegun:My brother you need to understand how the game works They are born with politics |
Farooq right? The true is the north only have one term left All your scheming to Bring another northerner for 8 years won't work Thank you sire |
Homeboiy:Bro it's not good our overhead is more than our capital projects it doesn't make sense at all |
Eggcelent:Nothing more to hard in times like this we should be reducing overhead |
Jacksparr0w127:Lol |
1 2 3 4 5 6 7 8 ... 753 754 755 756 757 758 759 760 761 (of 1040 pages)
Rehabilitation of Odukpani-Itu-Ikot Ekpene Road section I: Odukpani-Itu Bridgehead