Shelliz's Posts
Nairaland Forum › Shelliz's Profile › Shelliz's Posts
1 (of 1 pages)
Hello everybody. Please what could be responsible for the crack of this foundation wall? Pic below
|
Good day everyone. Please house, is BRC MESH indispensable for the construction of an oversite concrete (german floor) of a 2 bedroom bungalow on a dry Land in Edo state? I was told to buy it but i am thinking of using only the DPM sheet. Thanks all |
Dennis3D:ONLY IN NIGERIA!!! Any other part of the world where transparency is the order of the day, the price of an item, goods or services is open to all with either possibility of negotiating or not. But in NIGERIA, the reverse is the case. It's really a PITY!!!!!!!!!!!!!!! Please be specific when you talk about "work ethics"..... Next time you should state "some untransparent nigerians work ethics". Thank you |
I don't know how people manage to build for a cheaper price. My project is a block of 2 flats (4 bedrooms ensuite, visitors toilet and 2 bedrooms plus visitors toilet at the back and a gateman house. I have spent over 10 million naira excluding the land and the project isn't finished yet. I am even scared that it might get to 15 million - 17 million at the end of it. When i see people that built or are building for less , i Begin to wonder HOW? |
Good day all. Please it's very urgent. Which wire or brand of wire is best for POP speaker connection? Thanks in advance |
Reply to @Boay : Thanks alot! The sqm is actually 230 and not 250 as earlier stated (the gatehouse has been floored already). Location is in benin city and i was told to pay 7k per m3 for the concrete as last price and 50k for the supervision. 15ton of granite = 95k double trip of sharp sand = 25k quote author=boay post=79948283] Concrete volume 31.25m³ @ 4000/m³ labour is #125,000 We pay #4000 to the casting team. They will provide/rent the concrete mixer themselves. Cement (if 1:3:6) = 138bags @#2500/bag =#345,000 Give me the cost of material in your location to get the cost of sand and granite[/quote] |
Good day all. Please house, What is the cost of labour and materials for the oversight concrete (german floor) 5inch thickness of a bungalow measuring 250sqm? Granite? Sand? Cement? Labour? Would be more than greatful if anyone could help out. Thanks all |
Good day all. A competent builder/engineer needed in benin city, to modify a building that is almost at completion. Your job would be more of a supervisor, to ensure that the modification is carried out accurately. Thanks |
Good day all. Please i would need the help of a quantity surveyor or anyone willing to help me go through the cost of construction and list of materials that i was given by my engineer. The project is to modify a 4 bedrooms flat. I would be more than greatful. Thanks all and especially to those always willing to help and reply questions. |
Good day please what is the actual unit price of 16mm rod and 12mm? In benin city, they said the price is #4500 naira unit price for 16mm and #2500 for 12mm. Thanks Someone just sent me the real prices. Thanks to all those that have been contributing to this thread. I have learn't a whole lot and i am grateful...... |
Good evening/day all. Please does anyone have an idea about concrete swimming pool and fiber glass swimming pool in terms of cost, maintenance and durability? Thanks |
Thanks alot @Ife barbie. Please was the floor of the soakaway floored with concrete and cement alongside the septic tank or it was only the septic tank tat was floored and plastered? |
@Ife barbie i really appreciate! Whatabout the wood work, number of blocks and granite? Was bamboo also used? I have really been ripped off!!! |
@twinskenny yes in benin. @ifebarbie could you please give a detailed cost of your's? Thanks in anticipation. |
@Goodfaith thanks for the swift response. Unfortunately the roofing and windows have been done. My project is at amagba/ogunmwehi axis. I intend doing the septic tank/soakaway before rainning season. @Bixton the project is a block of 2 flats (4 bedrooms ensuit at the front and 2 bedrooms ensuite at the back). Thank you |
Also, someone told me that the floor of soakaway is not floored with concrete to allow liquid to sink into the earth while another told me that the ground is floored with concrete. How true is this? Thanks |
Good day all. Please i need help, got this bill of quantity from an engineer for the construction of 2 septic tanks/2 soak away with decking. I think the cost is high, what are your opinions please? Is there a recent thread for septic tanks construction here? Thanks all (60) 12mm rods @2100 unit price =#126000 (5) 8mm rods @unit price 1100 = #11000 (60) 1×12×18 wood @unit price = 2300 = #138000 40 bags of cement @unit price 2500 = #75000 7 tonnes of granite = #45000 half role of binding wire =#3500 Bag of nail #8000 20 bamboo @unit price 200 =#4000 (20)2×3 wood @unit price 1050 =#21000 2 trips of sand #50,000 Labour Digging of 2 septic tanks/soak away #50,000 Setting of the blocks #48000 Plastering #48000 capenter (without decking work) #32,000 Labour for casting #36000 Welder (without decking work) 16000 To pour the decking of the 2 septic tanks #24000 Supervision #40,000 Total #775,200 + cost of blocks + cost of welder and capenter for the decking. LOCATION : EDO STATE/BENIN CITY |
Good evening all. Please, does anyone have the contact of a professional landscape architect? I have a large space in my compound and intend to utilize it for landscape/garden with flowers. Thanks |
@chekitaut thanks for your response. Please do you know of a good builder/engineer that can do the job in benin city Edo state? Also, i learnt that 2050 blocks might give more than 2100 blocks because of the halfs. Would they also be charged at 50 naira or not charged at all? Thanks |
Good evening house. Please i need your opinions. Is 150k too small to set about 2050 blocks for fencing (digging of the back side inclusive because the both sides have been dugged and fenced with few coaches of block already). The Land is a 100ftby100. Intially the builder agreed for 2000 block but refused when he learn't that the moulder molded 2050. The painful part is that, he was supposed to commence tomorrow morning but didn't give me his reply until this evening when i called him. Your opinions please. |
Good day all, please i need your opinions on the price i was given for casement windows. Please is it a fair deal? Tower standard aluminium profile with net inclusive (WITHOUT BURGLARY) 1200by1200 =#47,250×14 =#661,500 (3 panel openings, picture attached). 900by900=1window #30,000 600by700=8windowsx#15,000 =#120,000 Fixing and transportation to site inclusive. TOTAL = #811,500
|
Thanks to everyone that replied, i was beginning to loose it! Thanks once more. |
Good day all! Please i need help���� My project (a block of 2 flats with concrete parapet and stone coated roofing tiles) was built with 5 inches blocks, didn't know of it until recently. I base abroad and the building was entrusted in the hands of a family member.What are the risks of building with 5 inches blocks? It's as if my world is crumbling �� I read somewhere that such structures are not solid. Please help me, advice me on what to do. I have spent all my savings erecting the structure. Thanks
|
Good evening all. Please which is preferable between 1. Doing art work of a house before plastering or 2. Plastering before art work? Thanks to those that will reply. |
Good day all. I asked a question some days ago, even pleaded for answers but only got 1 response. Please is this thread for " man know man" only? My question is in what order should the below listed be done? Plumbing and electrical piping Plastering Fixing of window protectors and casement windows Fixing of doors tiles Pop. Thanks in advance to those that will reply me. |
Good day all. Please i will be more than greatful if any engineer can list out step by step job to complete a house that was roofed recently. I need someone to help me arrange them in the right order,and if possible, add the reasons why certain jobs are to be done before others. Electrical and plumbing wall piping Burglary for windows Cassement Window Art work Plastering Interior and exterior doors p.o.p tiles electrical and plumbing fittings Painting. Please you can add whatever i didn't add to the list above . |
Good day all. Please i need the help of this honorable thread to help me cross check the 2 lists that were given to me by 2 différent Électrical engineers for the initial électrical piping work of my project. The différence in prices is enormous, i am a complete novice in this field and would need your help. The plan of my project is below. Thanks in advance . ENGINEER 1 8 Digniti pipe 20mm uk = 6500 × 8 =52000 1 A$B 18 fuse = 25000 1 A$B 12 fuse = 16500 2 original cooker box = 1500 × 2 = 3000 3 main bush 20mm = 1200 ×3 = 3600 3 copular 20 mm = 1200 × 3 = 3600 8 pcs of Adaptable Box = 400 × 8 = 3200 17 Mk Box = 700 × 17 = 11,900 6 Ubox = 1200 × 6 = 7200 Nails 3inches 8 pans = 200 × 8 = 1600 Cement = #2550 Labour = #60,000 TOTAL = #192, 150 ENGINEER 2 25mm pipe (15) at #170 × 15 = #2550 20mm pipe 2 bundle = #5000 McB (3 phase 12 ways) = #25,000 mcb (1 phase 8 ways) #15,000 Cooker box (2)= 800 ×2 = #1600 10 Mk box 3/6 (10) = 100× 10 = #1000 M box 3/3 (8pack) =500× 8 = #4000 Conduit box (2pack)= 1500 × 2 = #3000 Adaptable box 6/6 = #1000 Labour #40,000 TOTAL = #98150
|
Good day, have been quietly following this thread. Please i need the prices of the below listed to my email. ernesto_35@outlook.fr Location : Benin City. The best quality of aluminium cassement (please include the name on it), 5mm thick glass, 16mm bar for the burglaries and net inclusive. 4×4 = 14 2×2 = 8 5 × 5 = 1 Thanks in anticipation |
Good day all. Please i need help! I need the assistance of experts in roofing nogging. I intend roofing a block of 2 flats (4 bedrooms at the front and bedrooms at the back flat) and the carpenter gave me an estimate for the roofing wood nogging and the ceiling nogging for a king size of 20ft. (Location Benin city). 3by4 = 35 pièces (unit price, #1900) 2by4 = 270 pièces (unit price, #970) 2by3 = 60 pièces (unit price, #850) 2by2 = 560 pièces ( unit price, #600) 1 bag of nail 3inches (#8000) 1 bag of 4 inches ( #8000) Transportation #30,000 Labour for the wood work including ceiling nogging #190,000 Total amount =#951,400. I am not a rich person, just managing to build a home and i think only wood and ceiling nogging for almost 1 million naira is excessive. What are your thoughts please? Will be more than greatful for your replies
|
Good day all. Please i need help! I have been a silent reader here. Am sorry if am intruding here but please i need the assistance of all the experts in roofing nogging. I intend roofing a block of 2 flats (4 bedrooms at the front and bedrooms at the back flat) and the carpenter gave me an estimate for the roofing wood nogging and the ceiling nogging for a king size of 20ft. (Location Benin city). 3by4 = 35 pièces (unit price, #1900) 2by4 = 270 pièces (unit price, #970) 2by3 = 60 pièces (unit price, #850) 2by2 = 560 pièces ( unit price, #600) 1 bag of nail 3inches (#8000) 1 bag of 4 inches ( #8000) Transportation #30,000 Labour for the wood work including ceiling nogging #190,000 Total amount =#951,400. I am not a rich person, just managing to build a home and i think only wood and ceiling nogging for almost 1 million naira is excessive. What are your thoughts please? God bless you sir as you reply. |
Good day all. Please i need help! I have been a silent reader here. Am sorry if am intruding here but please i need the assistance of all the experts in roofing nogging. I intend roofing a block of 2 flats (4 bedrooms at the front and bedrooms at the back flat) and the carpenter gave me an estimate for the roofing wood nogging and the ceiling nogging for a king size of 20ft. (Location Benin city). 3by4 = 35 pièces (unit price, #1900) 2by4 = 270 pièces (unit price, #970) 2by3 = 60 pièces (unit price, #850) 2by2 = 560 pièces ( unit price, #600) 1 bag of nail 3inches (#8000) 1 bag of 4 inches ( #8000) Transportation #30,000 Labour for the wood work including ceiling nogging #190,000 Total amount =#951,400. I am not a rich person, just managing to build a home and i think only wood and ceiling nogging for almost 1 million naira is excessive. What are your thoughts please? God bless you sir as you reply.
|
Good day all. Please i need help! I have been a silent reader here. Oga mufutau55 and all the experts in roofing nogging. I intend roofing a block of 2 flats (4 bedrooms at the front and bedrooms at the back flat) and the carpenter gave me an estimate for the roofing wood nogging and the ceiling nogging for a king size of 20ft. (Location Benin city). 3by4 = 35 pièces (unit price, #1900) 2by4 = 270 pièces (unit price, #970) 2by3 = 60 pièces (unit price, #850) 2by2 = 560 pièces ( unit price, #600) 1 bag of nail 3inches (#8000) 1 bag of 4 inches ( #8000) Transportation #30,000 Labour for the wood work including ceiling nogging #190,000 Total amount =#951,400. I am not a rich person, just managing to build a home and i think only wood and ceiling nogging for almost 1 million naira is excessive. What are your thoughts please? God bless you sir as you reply. |
1 (of 1 pages)