gallivant: As always, zero substance from your posts.
He thinks he has a brain because RVP engages him, LOL! Perhaps he thinks he's Rvps peer on an intellectual level - that's why he's so egocentric. He is afraid of his career in Nairaland. Any mistake he will do is to quote me. I will not massage his ego like Rvp... Rvp is extremely soft on him. That dude requires some @ss whopping.
Seems like I've been waiting my time with these Ghanaians. Apparently, their 1000km is Hot air. Fantasies, noise, pipe dreams, and in none - existence.
I regret wasting my words arguing with hobbits on stuff above their pay grade.
More than 600km are upgrades for the old rusty trains.
Ghana's total budget for rail infrastructure- both new and upgraded is a paltry $2b. Hahaaa.... Sad!
Just40: In Ghana we don't spend to make loses ... We make sure our spending is judicious.... You just built 580km SGR to nowhere that will never make profit in it lifetime... No investor is motivated to give you anymore money for that
Since you can't post any rail infrastructure. We will go to cities.
On rail infrastructure, we're done. You have offered nothing but noise. So ghana and Togo combined can't match kenya in anything rail.
Just40: Your minister just told the world that your country is done because you can't add anymore SGR for the next 100 years...
Ghana is building 4,500km of SGR .. first phase has seen the construction of 1000km .. we are in the second phase which already has almost 1300km under construction.
Good luck catching up
Post the link. Show us the progress. Spare us empty words.
I have given you pictures and links. You haven't posted any, just spewing tantrums like a kid in grade 2.
Respect your age dwarf. I know you're toffee.... But the brain capacity is not bound to remain static. Grow up --- debate like someone who has at least a drop of brain fluid.
Just40: As usual, no wonder they use camera to deceive you fool in that land of the blind ...
Build additional SGR to reach Ghana level... The Chinese have refused to give you money for the Kisumu project because you're defaulting and you broke the confidentiality clause of your previous agreement.
Ghana is already in phase 2 of it railway construction which has projects like the 1100km SGR to Burkina Faso under construction... The Eastern Corridor under construction and etc
Your Tiny 580km SGR is no match to compare to a 1000km SGR..
Our western railway line of 425km comes with double lines
Extremely ugly - low standard sGR line. Show us real pillars and SGR stations and tunnels. Our commuter line is even better than this crap.
And I've just searched, 1000km is a non-existence entity. It's like me trying to use. 3400km of proposed entire sgr line to make an argument. But year, Kenya is going to achieve that. Phase 2 started... It's now in Naivasha. Naivasha to kisumu is starting next year.... Then kisumu to malaba..
If I have to string along with dreams and fantasies like you, then we have 3500km. That is almost 4 times of a non-existing 1000km Ghanian fantasy project.
Just40: we've not even started building stations yet... We are busy getting our lines up to the length that we need...
More focus is on moving cargo which is what moves the economy.
Watch the videos and see the real infrastructure.... Kenya is broke and can't build anymore SGR when Ghana has an additional 1000km of it under construction.
Thanks for wasting my time. I thought you have concrete evidence - to prove you're something. Huh! So you and Togo are on the same WhatsApp group... Extremely backward zoo. You talk too much with nothing to show. A simple test is making you shiver like a wet chick.
Next time, respect your elders and don't post for us pipe projects.
Just40: the difference is.. there's a platform for passengers to board in Ghana and in Kenya there's none.. and mind you, that station has been there for 40 years.
It's the fact that you guys have made do much noise about SGR but your country bankrupted itself just to build a peanut 580km when Ghana has done 1000km already with more under construction.
Just spare us your empty words. We're talking about standard infrastructure, not the nonsense you're peddling. I want you to combine ghana and Togo then search for any grandiose project on rail that can come close to kenya. If you find one, post it here.
Just40: the difference is.. there's a platform for passengers to board in Ghana and in Kenya there's none.. and mind you, that station has been there for 40 years
Ok, post the recent SGR station if you have. Post your best station. Or you were yapping about a pipe dream project? I want to see real infrastructure of your SGR.
Just40: it was put there because of the traffic in that area....
Just look at it, it has more usage than your expressway... That must make your expressway look like a ghost project.
At any given time you'll video this road, it'll have more usage than your expressway
That interchange was built as a flower on an empty less busy road. The surrounding areas of that interchange rings shambolic, shanties, garbage, and empty jungle. Expressway passes from one end of a busy CBD to the other. Don't compare the two.
Just40: Good you know everything isbasically the same.... Don't expect much because nothing will change
Listen, a paved road is not the same as an unpaved Road. If you plant a tree today, it won't be the same in 5yrs. Engage your brain. Unpaved road today will still be the same as the unpaved road of 2030, unless concrete or asphalt are laid on top of it.
I said the above to say this: The video you gave out, was old. Lower road works were yet to be embarked on. The work started two month later, and I gave you the link - the aftermath of the second video Is on the first vid I gave you.
Just40: pedestrian walkway is hard to come by in Kenya ... Roads there are normally constructed without walkways so when you guys finally see one you become happy...
We did the Kwame Nkrumah interchange 7 years ago ... and it elevated section has 3 lanes on each sides
That is you with your acute glaucoma - you can't see sh*t. Any normal road construction in Kenya and Nairobi specifically comes with the full package. We don't fumble around with shoddy roadwork activity like ghana.
And we're not talking about interchanges my guy, I know you want to shift the topic to minority aspects, where your favor lies.
Just40: I've watched that video and everything is still the same
Your dumb ass is just defending the indefensible.... I admire your blind loyalty
This kind of poor workmanship will not be allowed even in Togo
How is it the same when 90% of the things you purported to be wasn't in the second video. Second video is pretty much the same as what you posted earlier, but that is when rehabilitation and asphalt overlay of destroyed lower section started - so basically, i was posting the ground beeaking of re- construction .
Hobbit, the video you posted was of a destroyed section of the lower road. I gave you the rehabilitated work; with a video uploaded two months ago, you bl0ody f**uzzy short neanderthal. Don't be in the utopia of confusion. If you have glaucoma, I can finance your treatment in Accra.
I know you'll love it because you dumb Kenyans celebrate mediocrity. Please we don't build side walks into breakwalls here and bright do our sidewalks look dilapidated or with open drains.... If you see an open drain, then it means there's no sidewalk there
Look, the video you posted was uploaded 5month ago. Re-carpeting of the destroyed lower section was completed 2month ago and some still undergoing rehabilitation.