₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,736 members, 8,513,452 topics. Date: Thursday, 05 November 2026 at 03:05 AM

Toggle theme

Skimanski's Posts

Nairaland Forum › Skimanski's Profile › Skimanski's Posts

1 2 3 4 5 6 7 8 ... 111 112 113 114 115 116 117 118 119 (of 155 pages)

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:30pm On Nov 13, 2015
Affordable architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems)
Designs & Structures.

Architect Jude O. Odemwingie.
email: jude@dnstructures.com
email: skimanski4life@yahoo.com
website: www.dnstructures.com
Tel; 08038390386 or 08185174782
follow us on Instagram: @ dezynstructures

Kindly Follow our numerous professional works Works on the pages below

https://www.nairaland.com/1164230/best-architectural-interior-construction-works
https://www.nairaland.com/2067260/lekki-gardens-finishings
https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex
https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction
https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension
Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 2:03pm On Nov 13, 2015
More updates.

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 7:25am On Nov 13, 2015
peaceland:
Thanks sir,
I got his response too sir. Grateful.
However it seems that was for wall tiles only,
I am also looking for average per bag for floor tiles bearing in mind that the floor tiles will also have sharp sand.
Thanks sir.
This Things are average calculations, as a lot of factor can also Determine that. Also some tilers have different method of mixture.
Properties › Re: Lekki Gardens Finishings. by skimanski(op): 5:11pm On Nov 12, 2015
Time and energy involved is rewarding when you see the final look of your job.

Properties › Re: Lekki Gardens Finishings. by skimanski(op): 5:07pm On Nov 12, 2015
Masters wardrobe coming out. Thanks to hardwork and Commitment.

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 2:38pm On Nov 12, 2015
Preparation for first floor beams

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 1:50pm On Nov 12, 2015
Resumption of tiling works

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 1:28pm On Nov 12, 2015
.

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 1:24pm On Nov 12, 2015
More parapet

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:36am On Nov 12, 2015
peaceland:
sir,
I am also very interested in the answer to this question, kindly share should you get it outside of this forum.
thanks
Between 5m2 - 7m2, Depending on the Thickness from the wall
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 5:17pm On Nov 11, 2015
Current look

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 3:22pm On Nov 11, 2015
Precast mould in window hoods.

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 3:13pm On Nov 11, 2015
More pics on wall screed

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 1:41pm On Nov 11, 2015
Resumption of parapet works

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 12:22pm On Nov 11, 2015
Preparing for parapet

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 5:27am On Nov 11, 2015
Dieumerci:
Good job sir.
Please I would like to know the average square metres of tiles that can be set with one bag of cement.
Thanks
Between 5m2 - 7m2, Depending on the Thickness from the wall
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:22pm On Nov 10, 2015
Current External Updates

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:21pm On Nov 10, 2015
Internal Masonry Works

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:12pm On Nov 10, 2015
More POP in Pics

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:10pm On Nov 10, 2015
Wall Screed.

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:08pm On Nov 10, 2015
Casting of Remaining Septic Tanks

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:02pm On Nov 10, 2015
Tiles Samples On ground. We Bought the Tiles From the MArket. Like almost all the clients I work for, The Client was comfortable enough to allow me Make my choice on Tiles to be used.

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op):
Arrival of some tiles as we prepare for Tiling Works. Detailed Part of the Work Has Begone now. Always Scary when it gets to this Point.

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 8:15pm On Nov 09, 2015
My Love for Big Windows

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 8:14pm On Nov 09, 2015
Spetic Tanks Works

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 8:14pm On Nov 09, 2015
Internal Screeding on Some Parts

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 8:10pm On Nov 09, 2015
Updates on POP Works

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 7:53pm On Nov 09, 2015
brabus:
Steel.
So it Means when you add that to the 4inch Slab, you are looking at a thicker reinforcement than 6inch overall
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 7:19pm On Nov 09, 2015
brabus:
C Purlins
Wood or Steel Purlins
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 6:47pm On Nov 09, 2015
brabus:
Oga koning, here's alternative solution using I-section from ground up. And there's about 4in layer of concrete
What is holding he slab underneath ?
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 10:23am On Nov 09, 2015
EgunMogaji:
But we should still look for alternatives, which I frankly think would be cheaper, such as the clay thingies you lectured on a few weeks ago.

Though I think the poster came in a bit hot but he has some valid points.

Maybe you, especially you, can spend some research time with him.

Here we have a homeowner who might want to find an alternative decking system and he just needs to liason with a builder who is willing to respond but with a well engineered and safe one.

We don't need a Ferrari to commute to work. A Kia Picanto will get it done, an analogy.
I am always with he school of taught that looking for cheaper alternatives that works is the best way to go. But my issue with @koning is not his desire for alternatives, but his inability to come to terms with the fact that no matter what means you wish to use in archiving your your structure, there are codes and processes that must be followed. Because something is done like this somewhere doesn't mean it will work somewhere else. There have to be steps taken from the foundation to ensure that it works. The one that baffled me is the fact that he sees a possibility of using 4inches thick slab for the deck. And ontop of his deck he will then use block works to partition his rooms and put a roof. Who knows he might them just put a parapet ontop.

If he feels 1.5m will do his slab. I wish him well. Lets see which slab collapses at the end. Wether u wan use labourers for free take work for ur house, we shall see. Let me not also jump into ideas sha. It's possible he has bought wood and other materials already sha.
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 7:38pm On Nov 08, 2015
segcymoor:
May good lord bless the work of your hand.



---------
Tell me, how do you intend to protect this balcony ?
The plan is not to cover the balcony at all. It has to open to the sky like a sit out. We will only just work out something to protect the exit door and that will be it.

1 2 3 4 5 6 7 8 ... 111 112 113 114 115 116 117 118 119 (of 155 pages)