Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 9:08am On Jul 15, 2021 |
This is where we kept our reinforcements.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 9:06am On Jul 15, 2021 |
As we're waiting for the Capenters to finish the formwork for the first floor slab, 12mm and 16mm rods were supplied so that iron benders will start work as soon as possible.
|
|
Family › Re: How Many Children Would You Like To Have?? by STINOS(m): 5:09pm On Jul 13, 2021 |
MummyD2020: What are the tips please? Let's talk on WhatsApp with the number in my signature. |
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 1:04am On Jul 13, 2021*. Modified: 1:59am On Jul 13, 2021 |
Gaddafi1: The pictures showing broken blocks and brown stones being used as part of the composite for the concrete mixture have been carefully removed. Sorry I am only advising so that you will not be prosecuted when this construction work goes south. You can follow Spydder880 on this property section and learn how to execute a civil work. I will go ahead and advise clients to buy the materials rather than trust contractors with a hard earned money. My two kobo Like I said earlier, please come up with a more constructive criticism and stop dilly dallying. Thank you. |
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 3:46pm On Jul 12, 2021 |
Some beautiful fence designs I saw this morning somewhere in Anambra. I will like my client to see it. If he will like any of them.
|
Education › Re: WORLD Biggest Mistake ( Photos ) by STINOS(m): 3:39pm On Jul 12, 2021 |
A very big mistake.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 3:20pm On Jul 12, 2021 |
Hopefully iron benders will start work by Friday.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 3:18pm On Jul 12, 2021 |
...
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 3:18pm On Jul 12, 2021 |
View from the top.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 3:17pm On Jul 12, 2021 |
Men at work
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 3:16pm On Jul 12, 2021 |
Capentry formworks still ongoing.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 2:49pm On Jul 12, 2021 |
Gaddafi1: Quite obvious that these blocks were molded 40 blocks per bag (commercial production). Stones are being used rather than chippings or granite which has a higher strength and will not fail on the application of load. A builder used stone on my house and I am now witnessing a crack. Last week a house collapsed at Awka and we need to learn from that incident. Firstly we didn't use local stones as coarse aggregates take a look at the picture below, secondly we bought these machine vibrated blocks from one of the best block industries around. Others are selling N195 but we bought these blocks at N220 because of its high quality. Having said that, blocks are non load bearing members, it's main purpose is to demarcate various compartments in a building. Take a look at the picture of a framed structure attached. Did you see any blocks? So poor quality blocks are not the reason why buildings cracks or collapse. Please come up with a more reasonable constructive criticism. Thank you.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 11:29am On Jul 12, 2021 |
Gaddafi1: I don't like the quality of the concrete mixture as well as the blocks. let's avoid building collapse. and if I may ask, what is the ratio of the mixture that made you not to like it? |
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:27am On Jul 12, 2021 |
Paswill: Nice work Stinos. Thanks bro |
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 12:59pm On Jul 11, 2021 |
More
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 12:46pm On Jul 11, 2021 |
...
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 12:21pm On Jul 11, 2021 |
Materials for the formwork for the first floor slab arrived within the week and carpenters have already started work.
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:25am On Jul 11, 2021 |
Backfilling already commenced for the BQ
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:24am On Jul 11, 2021 |
Meanwhile we have leveled the foundation block work for the 2bedroom BQ.
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:12am On Jul 11, 2021 |
...
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:10am On Jul 11, 2021 |
More concrete works.
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:07am On Jul 11, 2021 |
We started pouring concrete and needle poker vibrator was used to achieve adequate compaction.
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 11:05am On Jul 11, 2021 |
And concrete cover was adequately placed so that the reinforcements will be completely submerged in concrete.
|
Properties › Re: Construction Of 5 Bedroom Duplex and 2bedroom BQ In Anambra State. by STINOS(op): 10:59am On Jul 11, 2021 |
The rain has slowed down the pace of work but thank God for yesterday's weather.
Pipes for the electrical wiring was installed within the week.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 7:14pm On Jul 06, 2021 |
All will be leveled by tomorrow and carpenters will start the first floor slab form works ASAP |
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 7:13pm On Jul 06, 2021 |
...
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 7:12pm On Jul 06, 2021 |
Men at work
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 7:12pm On Jul 06, 2021 |
More
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 7:11pm On Jul 06, 2021 |
We have started adding 3coaches of blocks on the lintel to level it.
|
Properties › Re: Construction Of A Hotel In Anambra State. by STINOS(op): 2:05pm On Jul 03, 2021 |
Hopefully we will finish today and start laying blocks on the lintel by Monday.
|