Current stage.
|
Rings
|
The Mats are done.
|
Blinding of strip At the completion of the excavation under 6days of hard work on hard and stony soil, strip begins.
|
After cutting Y20mm for the two columns as start bars, we heat the rods the be able to bend with ease.
|
Architectural drawings at an affordable price and enjoy the total package. |
Current update Excavation 98% done Blinding up next while we await the Y16mm yet undelivered
|
loffers:Y12mm Y16mm and Y20mm are for columns and beams |
900mm Mat
|
abmart80:Building from profiling and setting out to Roofing and that's called phase 1 or first phase,finishing is the 2nd phase(can fall under plastering and window installation among others) and furnishing is the Final phase |
DIORITESTRUCTURES, is a fast growing National & International Leading firm in the Design & Construction Industry with Young best brains, Vibrant, Creative, Charismatic & Intelligent Professionals who has/had played a crucial role in the Infrastructural Development of the Nation & Beyond. We comprise a team of: *Architects *Civil/Structural Engineers *Electrical Engineers *Mechanical Engineers *Quantity Surveyors *Project Managers etc. What we offer; We do all Kinds of Building Designs & Construction Services ranging from: *Architectural Designs *3D visualization *Structural Designs & Detailing *Bill of Quantity *Quality Control *Construction Planning, Execution & Management & all other Related services We offer the following as well; *Innovative Designs *Quality Assurance/Control *CCTV camera Installation *WiFi connectivity(from your phone) *Automatic Curtain installation both long and short directly connected to your phone *Door sensors in connectivity for accessibility from your phone *Gate Sensor from your mobile phone and many more *Cost efficiency *Safety of Structure to serve it's lifetime *Resource Management *Top-notch Services * And other related services. We even provide your Project duration for you with a Gantt chat showing resource allocations all in line with relevant Queuing theory. We will Definitely give your Property that Unique quality that gives it that class that you surely deserve. We have many more to offer you than these. Where to reach us WhatsApp/Call: +234-810-045-2977(WhatsApp) 08127167275. Email: dioritestructureslimited@gmail.com Site; www.dioritestructures..com https://www.nairaland.com/5004350/diorite-structures-contemporary-designs#75440590 https://www.nairaland.com/4766518/construction-4bedroom-duplex-bq-abeokuta https://www.nairaland.com/5004365/construction-4bd-rm-duplex-bq https://www.nairaland.com/5190002/construction-5bedroom-bungalow-pent-ado-ekiti |
Timtol:https://www.nairaland.com/5190002/construction-5bedroom-bungalow-pent-ado-ekiti |
Digging of pad base
|
stepone:Thanks for the question. As you know this is a sloppy plot, we stepped some points where needed but as to getting some desired depth as a question once thrown here if you check back. Thank u. |
ihebrooke:Amen Thanks |
Hitech TMT irons Y10mm Y12mm Y20mm while we await Y16mm for columns. Few points require Y20mm as columns. We have 44columns with one 1600mm pad base with two 1200mm while others are 900mm.
|
Hum2020:Thanks. I appreciate. 19.475m by 22.075m |
Getting some measurements
|
SmartHomes:Boss! |
A check on the depth
|
Binding wire for the iron works
|
More update on the irons. Y10mm Y12mm Y16mm and Y20mm respectively |
The rate of stones here is really high, it's our joy for the bearing capacity. But it delays to some extent.
|
Progress as the excavation of trenches is gradually getting done.
|
We use available materials in Ado-Ekiti. 300bags for a start
|
Progress on the excavation
|
Employing a means thru experience as best way in getting the four fancy columns done with two column seating on a mat without irregular size for column columns.
|
Hum2020:Currently we have depth of 900mm without pad base,700mm without pad base, 450mm without pad base and lowest of 300mm without pad base. |
Progress.
|
...
|
4BEDROOM DUPLEX EXTERNAL DIMENSION: 16.425m × 10.8m PROJECT DURATION: 3months(Carcass) ROUGH ESTIMATED BUDGET: 14million FEATURES GROUND FLOOR Step-up/Landscape, Terrance, Anteroom, Visitor's WC, Main lounge (7.2m × 6m) Guest bedroom ensuit, Dining, Kitchen, Balcony, Store/laundry, Staircase. FIRST FLOOR Long vestibule(lobby) Upper Lounge, Sit-out, Master bedroom with secrecy WIC,shower, basin,jacuzzi and WC. Bedroom 3 ensuit, Bedroom 4 ensuit with a sit-out. More info for your project designs and execution, call or WhatsApp this line, dealing with Consultant and Contractor. +234-810-045-2977(WhatsApp) Other: +234-812-7167275. Mail: dioritestructureslimited@gmail.com www.dioritestructures..com
|
....
|