Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:19pm On Oct 27, 2018 |
Here is the stage the terrace columns are then filling goes in the respect.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:16pm On Oct 27, 2018 |
Getting done gradually with the fillings
|
Properties › Re: A New Nigeria Innovative Duplex Village/store by Timtol(op): 7:58am On Oct 27, 2018 |
.. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:02am On Oct 27, 2018 |
.. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:13pm On Oct 26, 2018 |
sisieko02: I don reach here ooo make I learn abeg. Mo gbo mo branch. Yeah! Cool! |
Properties › Re: Cost Of Building Foundation for a 4 Bedroom Bungalow In The East by Timtol(m): 8:10pm On Oct 26, 2018 |
sisieko02: No, I mean to build the foundation of a 4 bedroom bungalow. Just foundation. How many blocks, cements etc To get the actual figures I have to see your drawings principally your floor plan. If you don't have one you can check my signature and chat me up. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:01pm On Oct 26, 2018 |
|
|
|
Properties › Re: Cost Of Building Foundation for a 4 Bedroom Bungalow In The East by Timtol(m): 7:56pm On Oct 26, 2018 |
sisieko02: Good evening everyone, I know this is an old thread, since 2017. But am hoping I can get answers to my questions from experienced builders or from people who are currently on the same project. Am starting a four bedroom bungalow project next month by Gods Grace, and would like to know how much it would cost me for a four bedroom bungalow foundation. How many blocks and cement I will need. I would like to have an idea just to avoid being ripped off. Although I don’t plan to give the job or give money to an engineer who will want to bill me recklessly. I plan to buy materials myself because I want my hard earned money to go a long way. Thanks in advance for your reply’s. Please help a sister oooo  Good! Do you mean from foundation to roofing or both interior and exterior finishing and furnishing because I only saw " how much it would cost me for a four bedroom bungalow foundation" |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:45pm On Oct 26, 2018 |
Ongoing filling Getting done gradually in respect to the ongoing terrace columns growing out to the height of 7650mm from the pad bases. Foundation done for 2weeks. Over 3m used.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 5:43am On Oct 26, 2018*. Modified: 7:44am On Oct 26, 2018 |
Amastermovic: I don't want to believe you are saying no sharp sand in Abk ..ccecc and other companies move nothing less 1000 tonnes daily from oba axis..
you will get quality maybe you need to change ur supplies.. Thanks and still following.. and you forgot to tell us the bearing capacity of the soil and depth of pads... and what's the maximum beam span We tried to get it oo but as it stands was told "e no dey" (the ones for filling but there's sharp sand) and I know if we later get it as planned it will be very expensive. We have a good soil here. No soil test was done only a survey of the soil was done for the borehole which we use as well but as it stands,we arrived at about 15 types of soil before we get our water in which we have a rock and the borehole depth is over 100m. There are even storey buildings around that only column was done @the edges and that's all because of good soil. We don't have problem about soil sir. The depth of the foundation is 750mm and the pad bases for the mat and columns is 300mm so for the pad bases we have 1,050mm and for blocks in substructure we have 750mm. If I could understand you clearly now. Thanks for mentioning ccecc... will try to ask about that. We only have a cartilever of 1.575m which TMT rods of Y20 will take that. The sitout in front in such of a curved form. All our rods are TMT anyways. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:48pm On Oct 25, 2018 |
Laterite for filling when we don't have sharp sand in abeokuta and ordering most of our materials from Lagos but sharp sand from Lagos too is expensive and there are still some that has salt which is dangerous for rods so we wanna manage our laterite jejeli* for compact it well. We will use a rammer as well. Tomorrow next for filling Thanks for following. Over 150cement bags used for foundation.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:43pm On Oct 25, 2018 |
jp130: May God giv u d strength to complete dis Amen Thanks |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 3:35pm On Oct 25, 2018 |
PPR pipes for wastes.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:35pm On Oct 25, 2018 |
We have our columns casted now Next to filling, ramming, spreading of DPM and German... thanks for following
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 6:43pm On Oct 24, 2018 |
....
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:29pm On Oct 24, 2018 |
Another 30tonnes of granite
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:27pm On Oct 24, 2018 |
...
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:53am On Oct 24, 2018 |
Straight planks for straight and smooth casting
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:52am On Oct 24, 2018 |
Nothing like an extremely straight wall. "The taste is in the difference,the difference is in the taste" All could see the difference. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:48am On Oct 24, 2018 |
Taken our German level from the back.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 9:24pm On Oct 23, 2018 |
.. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:24am On Oct 23, 2018 |
More update shortly |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 10:42pm On Oct 22, 2018*. Modified: 7:24am On Oct 23, 2018 |
Block work in substructure
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 4:56am On Oct 22, 2018 |
Peter4luv: How much is the cost of doing this borehole.. The negotiation is between the client family and the borehole man,but at it stands per distance and the hard soil hitting a rock underground I was informed 650k. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 10:07pm On Oct 21, 2018 |
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:07am On Oct 21, 2018 |
Blinding on going. Nothing less than the BEST QUALITY WORKS. Almost done.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:29am On Oct 20, 2018*. Modified: 7:06am On Oct 21, 2018 |
Checking out the accuracy
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:21am On Oct 20, 2018 |
Our iron blenders did a marvelous job and completely their work under two days for this stage. It's extremely nice and perfect.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:19am On Oct 20, 2018 |
The third largest pad base mat
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:18am On Oct 20, 2018 |
Circular column for the boy's quater.
|