Properties › Re: Construction Of A Nairalanders 5bedroom Duplex Budget(N17m) by Timtol(m): 8:49am On Nov 01, 2018*. Modified: 2:34pm On Nov 20, 2019 |
|
Properties › Re: Construction Of A Nairalanders 5bedroom Duplex Budget(N17m) by Timtol(m): 8:46am On Nov 01, 2018*. Modified: 7:35am On Nov 20, 2019 |
raymondFirstborn: its the side we cast.The front you are talking about is an ammendment to the blocksetting.so we used mortar to correct.(not concrete) ..... |
Properties › Re: Construction Of A Nairalanders 5bedroom Duplex Budget(N17m) by Timtol(m): 6:21am On Nov 01, 2018 |
|
Properties › Re: Construction Of A Nairalanders 5bedroom Duplex Budget(N17m) by Timtol(m): 6:20am On Nov 01, 2018*. Modified: 2:38pm On Nov 20, 2019 |
|
Properties › Re: Construction Of A Nairalanders 5bedroom Duplex Budget(N17m) by Timtol(m): 6:19am On Nov 01, 2018*. Modified: 2:37pm On Nov 20, 2019 |
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 10:53pm On Oct 31, 2018 |
bixton: Well done. So how many bags of cement was used for the flooring? Thanks bro. When we are done with German I will let you know. Just for what's on ground without German 170bags. German will take more than 100bags so let's wait and see the outcome. I'm just getting in from site... Let's see what's up tomorrow... remains little to finish casting tho ought to be done but because of little issue and well settled. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:55pm On Oct 31, 2018 |
Still @site casting...we plan to finish it up today and cure 2am and tomorrow morning before block work commence hopefully. We spent more than budgeted
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:49pm On Oct 31, 2018 |
....
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:44pm On Oct 31, 2018 |
Morning...when we started
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:40pm On Oct 31, 2018 |
Progress
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 11:37pm On Oct 30, 2018 |
..
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:55pm On Oct 30, 2018 |
Machine arrived late tonight. Had to take some risk tonight,still on site waiting for the granite from Lagos. We are set to cast tomorrow. More update tonight.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:53pm On Oct 30, 2018 |
RSAV: Good job brother. May God help you as you carry on. Amen bro Thanks |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 4:47pm On Oct 30, 2018 |
joycluv: Ok. I did my filling in May and am set for d German flooring. Do I still need to ram it since rain had been falling on it for long? I will address you to top it and ram it. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:43pm On Oct 30, 2018 |
...
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:21pm On Oct 30, 2018 |
joycluv: Good job there! Plz apart from Ramming machine,which other instruments can be used for ramming the foundation filling? No other instrument was used aside that. We only have enough water on the fillings which really helped us. So we rammed it on laterite soil then top it with sharp sand from erosion,well sharp enough and had hardcores with it. After topping it up we rammed it again before spreading our DPM. Will post images soon. On site @the moment,the rammer machine Working. |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:15pm On Oct 30, 2018 |
Amastermovic: yes it indeed rain over the weekend which is off benefit..
can I visit you guys here to learn somethings live and directly and as a student in Where are you, I mean your location? |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:31am On Oct 30, 2018 |
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:30am On Oct 30, 2018 |
More update shortly |
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:30am On Oct 30, 2018 |
Bracing for German.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:27am On Oct 30, 2018 |
Present stage and the rammed surface.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:25am On Oct 30, 2018 |
Taken some certain measurements for the mechanical guys to start their work after separated having the toilets spot rammed.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:22am On Oct 30, 2018 |
The site is getting different gradually as the fence start coming up and the building taken shape. Filling finished but because of the rain that rained heavily in Lagos/abeokuta axis we need to top it up. Machine was unable to move on the laterite soil which caused a major setback.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 11:36am On Oct 29, 2018 |
Up to work, it's Monday morning. Fence work started. Ramming machine is available to start work shortly. Abeokuta and Lagos axis experienced rain over the night. The rain had helped so far in raining on the fillings.
|
Properties › Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 4:27pm On Oct 28, 2018 |
Wetting of the fillings |
|
Properties › Re: Nigerian House Plans: Innovative Architectural Designs With Affordable Budgets by Timtol(m): 2:29pm On Oct 28, 2018 |
Hajivince: Happy Sunday to all Nairalanders. We have been busy with the Construction works we are Partnering Cornerstone CHP with & that's why we haven't been that active here. Please bear with us but you can still contact us for all kind of Designs & construction works as we have our full teams readily available. Thank you all Yeah! I recommend HAJIVINCE for you for structural works. The guy is too good. Happy Sunday |
|
Properties › Re: Architectural Design For Ibadan And Ogun State Dwellers by Timtol(op): 6:11am On Oct 28, 2018 |
PROPOSED 4BEDROOM BUNGALOW WITH PENT
CLIENT: NAIRALANDER LOCATION: IBADAN, NIGERIA
FEATURES
GROUND FLOOR
Entrance terrace Anteroom Visitor WC Guest Bedroom ensuit Main Lounge Dining Library/Office Kitchen Pantry Balcony Bedroom 2 ensuit Bedroom 3 ensuit Master Bedroom ensuit Lobby Dogleg Stairway
PENT FLOOR
Upper Family Lounge Sit out facing the Existing road.
|
Properties › Re: Start Building Your House,build Cheaply Lagos/abuja/ibadan/delta by Timtol(op): 6:07am On Oct 28, 2018 |
PROPOSED 4BEDROOM BUNGALOW WITH PENT
CLIENT: NAIRALANDER LOCATION: IBADAN, NIGERIA
FEATURES
GROUND FLOOR
Entrance terrace Anteroom Visitor WC Guest Bedroom ensuit Main Lounge Dining Library/Office Kitchen Pantry Balcony Bedroom 2 ensuit Bedroom 3 ensuit Master Bedroom ensuit Lobby Dogleg Stairway
PENT FLOOR
Upper Family Lounge Sit out facing the Existing road.
|
Properties › Re: A New Nigeria Innovative Duplex Village/store by Timtol(op): 6:03am On Oct 28, 2018 |
PROPOSED 4BEDROOM BUNGALOW WITH PENT
CLIENT: NAIRALANDER LOCATION: IBADAN, NIGERIA
FEATURES
GROUND FLOOR
Entrance terrace Anteroom Visitor WC Guest Bedroom ensuit Main Lounge Dining Library/Office Kitchen Pantry Balcony Bedroom 2 ensuit Bedroom 3 ensuit Master Bedroom ensuit Lobby Dogleg Stairway
PENT FLOOR
Upper Family Lounge Sit out facing the Existing road.
|
|