Construction Of A 4bd/rm Duplex With A Bq @Abeokuta by Dioritestructures / CONSTRUCTION & DESIGN OF 4bedroom Duplex With 2bedroom 2flat Attach IN LAGOS / Construction Of 4bedroom Duplex With 2bedroom 2flat Attach At AIT Road Alagbado (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 5:52pm On Oct 19, 2018 |
More update shortly... 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:00am On Oct 20, 2018 |
Mixing begins to blind pad bases and cast the bases. 3 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:01am On Oct 20, 2018 |
Blinding of the pad bases 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:11am On Oct 20, 2018 |
Extremely straight 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:18am On Oct 20, 2018 |
Circular column for the boy's quater. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:19am On Oct 20, 2018 |
The third largest pad base mat 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:21am On Oct 20, 2018 |
Our iron blenders did a marvelous job and completely their work under two days for this stage. It's extremely nice and perfect. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:29am On Oct 20, 2018 |
Checking out the accuracy 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:07am On Oct 21, 2018 |
Blinding on going. Nothing less than the BEST QUALITY WORKS. Almost done. 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by isahkadir1(m): 9:12am On Oct 21, 2018 |
I love this, following 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 10:07pm On Oct 21, 2018 |
isahkadir1:Appreciated! 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Peter4luv: 12:06am On Oct 22, 2018 |
How much is the cost of doing this borehole.. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:56am On Oct 22, 2018 |
Peter4luv:The negotiation is between the client family and the borehole man,but at it stands per distance and the hard soil hitting a rock underground I was informed 650k. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 10:42pm On Oct 22, 2018 |
Block work in substructure 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:24am On Oct 23, 2018 |
More update shortly 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:24pm On Oct 23, 2018 |
.. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bless2tom(m): 10:51pm On Oct 23, 2018 |
Nice work. following and learning from this. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 1:48am On Oct 24, 2018 |
Taken our German level from the back. 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 1:52am On Oct 24, 2018 |
Nothing like an extremely straight wall. "The taste is in the difference,the difference is in the taste" All could see the difference. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 1:53am On Oct 24, 2018 |
Straight planks for straight and smooth casting 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 6:40am On Oct 24, 2018 |
following .. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:27pm On Oct 24, 2018 |
... 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:29pm On Oct 24, 2018 |
Another 30tonnes of granite 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 6:43pm On Oct 24, 2018 |
.... 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:35pm On Oct 25, 2018 |
We have our columns casted now Next to filling, ramming, spreading of DPM and German... thanks for following 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 3:35pm On Oct 25, 2018 |
PPR pipes for wastes. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by jp130(m): 6:49pm On Oct 25, 2018 |
May God giv u d strength to complete dis 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:43pm On Oct 25, 2018 |
jp130:Amen Thanks 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:48pm On Oct 25, 2018 |
Laterite for filling when we don't have sharp sand in abeokuta and ordering most of our materials from Lagos but sharp sand from Lagos too is expensive and there are still some that has salt which is dangerous for rods so we wanna manage our laterite jejeli* for compact it well. We will use a rammer as well. Tomorrow next for filling Thanks for following. Over 150cement bags used for foundation. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 10:14pm On Oct 25, 2018 |
Timtol: I don't want to believe you are saying no sharp sand in Abk ..ccecc and other companies move nothing less 1000 tonnes daily from oba axis.. you will get quality maybe you need to change ur supplies.. Thanks and still following.. and you forgot to tell us the bearing capacity of the soil and depth of pads... and what's the maximum beam span |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 5:43am On Oct 26, 2018 |
Amastermovic:We tried to get it oo but as it stands was told "e no dey" (the ones for filling but there's sharp sand) and I know if we later get it as planned it will be very expensive. We have a good soil here. No soil test was done only a survey of the soil was done for the borehole which we use as well but as it stands,we arrived at about 15 types of soil before we get our water in which we have a rock and the borehole depth is over 100m. There are even storey buildings around that only column was done @the edges and that's all because of good soil. We don't have problem about soil sir. The depth of the foundation is 750mm and the pad bases for the mat and columns is 300mm so for the pad bases we have 1,050mm and for blocks in substructure we have 750mm. If I could understand you clearly now. Thanks for mentioning ccecc... will try to ask about that. We only have a cartilever of 1.575m which TMT rods of Y20 will take that. The sitout in front in such of a curved form. All our rods are TMT anyways. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:45pm On Oct 26, 2018 |
Ongoing filling Getting done gradually in respect to the ongoing terrace columns growing out to the height of 7650mm from the pad bases. Foundation done for 2weeks. Over 3m used. 1 Like
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)
Estimate For Decking / ANOTHER REASON TO INVEST IN IBEJU LEKKI / This Building Belongs To Chairman Of AA Oil; He Bought The Land For N1billion
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20 |