Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:01pm On Oct 26, 2018 |
1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by sisieko02: 8:11pm On Oct 26, 2018 |
I don reach here ooo make I learn abeg. Mo gbo mo branch. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:13pm On Oct 26, 2018 |
sisieko02:Yeah! Cool! 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:02am On Oct 27, 2018 |
.. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:16pm On Oct 27, 2018 |
Getting done gradually with the fillings 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:19pm On Oct 27, 2018 |
Here is the stage the terrace columns are then filling goes in the respect. 3 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:27pm On Oct 28, 2018 |
Wetting of the fillings 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 11:36am On Oct 29, 2018 |
Up to work, it's Monday morning. Fence work started. Ramming machine is available to start work shortly. Abeokuta and Lagos axis experienced rain over the night. The rain had helped so far in raining on the fillings. 3 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:22am On Oct 30, 2018 |
The site is getting different gradually as the fence start coming up and the building taken shape. Filling finished but because of the rain that rained heavily in Lagos/abeokuta axis we need to top it up. Machine was unable to move on the laterite soil which caused a major setback. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:25am On Oct 30, 2018 |
Taken some certain measurements for the mechanical guys to start their work after separated having the toilets spot rammed.
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:27am On Oct 30, 2018 |
Present stage and the rammed surface.
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:30am On Oct 30, 2018 |
Bracing for German.
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:30am On Oct 30, 2018 |
More update shortly |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:31am On Oct 30, 2018 |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 12:27pm On Oct 30, 2018 |
yes it indeed rain over the weekend which is off benefit.. can I visit you guys here to learn somethings live and directly and as a student in |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 12:27pm On Oct 30, 2018 |
yes it indeed rain over the weekend which is off benefit.. can I visit you guys here to learn somethings live and directly and as a student following |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by joycluv: 12:54pm On Oct 30, 2018 |
Good job there! Plz apart from Ramming machine,which other instruments can be used for ramming the foundation filling? |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:15pm On Oct 30, 2018 |
Amastermovic:Where are you, I mean your location? |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:21pm On Oct 30, 2018 |
joycluv:No other instrument was used aside that. We only have enough water on the fillings which really helped us. So we rammed it on laterite soil then top it with sharp sand from erosion,well sharp enough and had hardcores with it. After topping it up we rammed it again before spreading our DPM. Will post images soon. On site @the moment,the rammer machine Working. |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:43pm On Oct 30, 2018 |
...
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by joycluv: 4:15pm On Oct 30, 2018 |
Ok. I did my filling in May and am set for d German flooring. Do I still need to ram it since rain had been falling on it for long? |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:47pm On Oct 30, 2018 |
joycluv:I will address you to top it and ram it. |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by joycluv: 7:27pm On Oct 30, 2018 |
Timtol:. Ok. Thanks |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by RSAV: 7:47pm On Oct 30, 2018 |
Good job brother. May God help you as you carry on. 3 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:53pm On Oct 30, 2018 |
RSAV:Amen bro Thanks |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:55pm On Oct 30, 2018 |
Machine arrived late tonight. Had to take some risk tonight,still on site waiting for the granite from Lagos. We are set to cast tomorrow. More update tonight. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 11:37pm On Oct 30, 2018 |
.. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 6:25pm On Oct 31, 2018 |
Timtol:Abeokuta onikolobo /panseke Axis sir |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:40pm On Oct 31, 2018 |
Progress
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:44pm On Oct 31, 2018 |
Morning...when we started
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:49pm On Oct 31, 2018 |
....
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:55pm On Oct 31, 2018 |
Still @site casting...we plan to finish it up today and cure 2am and tomorrow morning before block work commence hopefully. We spent more than budgeted 1 Share
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)
Yaba Building Collapse: One Person Recovered Dead From The Rubble / Ikorodu Houses Marked For Demolition By LASG; The Residents React / LASG Arrests Developer Of Yaba Collapsed Building
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19 |