Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 5:49am On Dec 19, 2019 |
First soil compaction today, filling starts. |
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 8:54pm On Dec 18, 2019 |
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:32pm On Dec 18, 2019 |
The milestone ends this weekend. |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:12pm On Dec 18, 2019*. Modified: 10:25am On Dec 19, 2019 |
Wetting of the seemly termed first layer...compacting the soil 2 times.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 6:02pm On Dec 18, 2019 |
More update shortly |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 10:58am On Dec 18, 2019 |
First leveling and backfilling in progress as well as the continuation for the iron works as casting progresses.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 4:56am On Dec 18, 2019 |
Timtol: More from this side the formwork and iron works progresses simultaneously We move |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 7:27pm On Dec 17, 2019 |
More from this side.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 6:45pm On Dec 17, 2019 |
Plumbing works
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 6:43pm On Dec 17, 2019 |
More from this side the formwork and iron works progresses simultaneously
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 3:43pm On Dec 17, 2019 |
gateleo: Good job...Timtol Thanks. Appreciate you following.  |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 2:07pm On Dec 17, 2019 |
Timtol: More update later today. Gradually! Casting of columns done. Neat unrivalled quality as usual. 
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 12:29pm On Dec 17, 2019 |
More update later today.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 12:25pm On Dec 17, 2019 |
Casting of columns and progress on the "foundation beam" simultaneously |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:27am On Dec 17, 2019 |
Number of blocks used for substructure works.
1150 blocks. |
Properties › Re: Contemporary 3d/interior Works by Timtol(op): 5:30am On Dec 17, 2019 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:51pm On Dec 16, 2019 |
Putting joy on the client's heart thru expression  All 30 Columns align 100%. 75bags of cement used for pad bases, blinding and substructure works.
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:49pm On Dec 16, 2019 |
Day 2 on substructure works. Done!
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 10:14am On Dec 16, 2019 |
Getting ready as the substructure works end
|
Properties › Re: Contemporary 3d/interior Works by Timtol(op): 12:49am On Dec 16, 2019 |
|
Properties › Re: CONTEMPORARY & AFFORDABLE BUILDING DESIGNS/NIGERIAN HOUSE PLANS STORE by Timtol(op): 12:44am On Dec 16, 2019 |
|
Properties › Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 12:43am On Dec 16, 2019 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 12:41am On Dec 16, 2019 |
|
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 8:28pm On Dec 15, 2019 |
|
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 10:12am On Dec 15, 2019 |
EgunMogaji2: Also, though, one should be mindful of unnecessarily high roof. It may lead to wastage in terms of cooling and heating when it's not really needed. Hajj, at almost 7 feet needs high roof and non standard bed and mattress. Lol True!  |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 9:24am On Dec 15, 2019*. Modified: 11:57am On Dec 18, 2019 |
Ring sample for the plinth.
|
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 8:21am On Dec 15, 2019 |
spyder880: Internal beam positions...... Lovely! |
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 8:03am On Dec 15, 2019 |
spyder880: 200mm for beams Column I mean tho...it's ok |
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 7:33am On Dec 15, 2019 |
spyder880: Still doing the wood works....... What's your ring spacing brother?  |
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 7:32am On Dec 15, 2019 |
spyder880: I like your early warning to the builders and how it was planned before they start. There was a building I was constructing, the owner called me and asked for block increase when I have even finished with the lintels reinforcement, we were doing lintels carpentry before they decided we should add a 10th block before the lintel, we now had to start lifting all the rods before adding blocks, before we could continue.
There was a lot of delays, and the lap length of the top floor was not enough.
Welcome Baba, you are a blessing to us in the property section. A way out 10coaches to lintel and 3 after lintel. |
Properties › Re: CONSTRUCTION Of A Modern Soft 4BEDROOM DUPLEX @PORT HARCOURT by Timtol(op): 6:32am On Dec 15, 2019 |
Visitation to site increases as people become more amazed with the accuracy of the little done so far.
Here is our kitchen 
|
Properties › Re: The Anambra Modern Duplex Construction by Timtol(m): 5:22am On Dec 15, 2019 |
mufutau55: Agreed with you as in my last build, I told the builder to add one more course to make it 3 and 1 extra as beam for decking. He gave me so mucg excuse about the standard being too high... but I told him I want a custom build because I am almost 7ft tall and after the POP, I don't want a low ceiling where I cannot extend my hands upward.. so he has to agree with me and the last floor also had 3 courses added. So, customized is difference from standard based who will live in the house...
Hajji M We are all used to 3m-3.15m headroom for residential building, but as things stands now designs and ideas are overtaken which isn't bad but makes things better. 10coaches from the oversite concrete appeals for higher doors and 7-8coaches for windows, longer windows looks very nice(aesthetically). 3 coaches after lintel looks cool. From my desk I list 4 major things as advantages of high headroom to others it might not be totally agreed.1. Gives the room a sense of been big and spacious 2. Enough space for pop designs as clients desires 3. Circulation of air(air flow and air movement) is better with high headroom, taken an auditorium or a shopping mall as sample.4. Air conditioning installation. I think an idea is been added. Thanks |