Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,154,161 members, 7,821,942 topics. Date: Wednesday, 08 May 2024 at 10:23 PM

Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) - Car Talk - Nairaland

Nairaland Forum / Nairaland / General / Car Talk / Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) (6246 Views)

Container Falls On A Toyota Hiace Bus Along Ilasa-Oshodi Expressway (Pictured) / Update On The 10-lane Lagos-badagry Expressway (pictures) / Current State Of Lagos-benin Expressway - (pictures) (2) (3) (4)

(1) (Reply) (Go Down)

Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by pheesayor(m): 11:15am On Feb 28, 2013
Earlier in the year we reported that FERMA started the patching of some bad portion of oshodi expressway and people condemned the FG for abandoning the rebuilding which Julius Berger started and stopped.
However it has been noticed that Julius Berger plc has returned to the road to continue from where they stopped, whether it would be the whole stretch of the road which is already in bad shape, or just for another short distance, time will tell.
They initially stopped at Sanya and resumed from the service lane from Sanya, they are currently at Ijesha bus stop
http://www.watchinglagos.com/2013/02/juliu-berger-resumes-work-on-apapa.html

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by taharqa: 11:57am On Feb 28, 2013
GOOD....

Like I suggestd that day on d 'Patching' thread, the initial stoppage was probably due to d usual budgetary constraints. Hope now that that has bn put behind us, JB and that oda Company, wud mk sure they complete dis very critical route b4 d Middle of dis yr as was originali plannd...

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Nobody: 12:01pm On Feb 28, 2013
Progress, progress everywhere. Nigeria is marching forward. The few but noisy ENEMIES of progress should either join the moving train or they'll soon be crushed.

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by watchinglagos: 12:09pm On Feb 28, 2013
pheesayor: Earlier in the year we reported that FERMA started the patching of some bad portion of oshodi expressway and people condemned the FG for abandoning the rebuilding which Julius Berger started and stopped.
However it has been noticed that Julius Berger plc has returned to the road to continue from where they stopped, whether it would be the whole stretch of the road which is already in bad shape, or just for another short distance, time will tell.
They initially stopped at Sanya and resumed from the service lane from Sanya, they are currently at Ijesha bus stop
http://www.watchinglagos.com/2013/02/juliu-berger-resumes-work-on-apapa.html

Thanks for posting
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by watchinglagos: 12:14pm On Feb 28, 2013
this is not to praise the FG but to notify the public as we are unbiased, after initially reporting the patch done by ferma

taharqa: GOOD.... Like I suggestd that day on d 'Patching' thread, the initiali stoppage was probably due to d usual budgetary constraints. Hope now that that has bn put behind us, JB and that oda Company, shld mk sure they complete dis very critical route b4 d Middle of dis yr as was originali plannd...
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Sunnybobo3(m): 12:29pm On Feb 28, 2013
Jonathan is working, haters are talking.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by free2ryhme: 12:31pm On Feb 28, 2013
GOD KNOWS i WILL NEVER FOLLOW THAT ROAD EXCEPT IT IS A SUNDAY OR A SERIOUS PUBLIC HOLIDAY
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Nobody: 12:33pm On Feb 28, 2013
Resume or not,what we want is a motorable road,shikena.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Tolexander: 12:37pm On Feb 28, 2013
starting is not as interesting as finishing the road.
When the construction is completed, that is when i have a song to sing.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by honeric01(m): 12:46pm On Feb 28, 2013
After how many months? and how long is it going to take them to finish between Sanya and Ijesha which is just one bustop apart? if they're to[size=18pt] patch[/size] the whole road from Mile 2 to Oshodi, it'll well take them 3 years to finish!

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Soso990240(m): 12:47pm On Feb 28, 2013
Na old news nah..dm dn dey site since january.we ar usin service lane along coconut-mile 2.

2 Likes

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by guvnor83: 12:52pm On Feb 28, 2013
Frst 2 cmment
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by AdmiralD: 12:56pm On Feb 28, 2013
Well am happy they're back... I trust JB to do a great job. smiley
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by lacasa: 12:57pm On Feb 28, 2013
Anϑ some sycophants are already using wat shld ave bn finished a long time ago to raise a stupid govt


Nawa 4 some less than complete humann beings sha!

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by blazingtrain: 1:13pm On Feb 28, 2013
good
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Pappyshoes(m): 1:13pm On Feb 28, 2013
Sunny_bobo: Jonathan is working, haters are talking.

How many of this work is going on in S.West?
We are still waiting, if possible, put pictures. GEJ is highly ungrateful to S. Westerner.
Not a matter of ethnicity pls.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by koruji(m): 1:21pm On Feb 28, 2013
You need to stop pursuing imaginary enemies of progress. GEJ and his govt. actions are the reason for skepticism. Now it will take much more to convince anyone of GEJ's sincerity but it can be done - let's see a longterm change of pace & behavior first. Stop all the lying to the public, and ethnic bias.

Sincere 9gerian: Progress, progress everywhere. Nigeria is marching forward. The few but noisy ENEMIES of progress should either join the moving train or they'll soon be crushed.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by talktimi(m): 1:22pm On Feb 28, 2013
Fashola is working o jare, another proof of it.

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by chukxie(m): 1:31pm On Feb 28, 2013
Good development. Will all the roads would stand the test of time?

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Nobody: 2:01pm On Feb 28, 2013
Thank God o
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by premlove(m): 3:11pm On Feb 28, 2013
Sunny_bobo: Jonathan is working, haters are talking.
hmm abeg make i hear word
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Revolva(m): 4:00pm On Feb 28, 2013
smileywell works have been going on since na...dis is a place I dey run tins almost everyday...
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Boss13: 4:04pm On Feb 28, 2013
Sincere 9gerian: Progress, progress everywhere. Nigeria is marching forward. The few but noisy ENEMIES of progress should either join the moving train or they'll soon be crushed.

Road repairs is progress? Na wa oh.
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by seguno2: 4:26pm On Feb 28, 2013
talktimi: Fashola is working o jare, another proof of it.

Thanks for the sarcastic comment o jare.
BTW, who is responsible for clearing the gutters along the road?
Who is responsible for ensuring people do not throw garbage on the road?
Who is responsible for sweeping the road and keeping it clean after construction so it can last for much longer?

1 Like

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by taharqa: 12:43am On Mar 01, 2013
seguno2:

Thanks for the sarcastic comment o jare.
BTW, who is responsible for clearing the gutters along the road?
Who is responsible for ensuring people do not throw garbage on the road?
Who is responsible for sweeping the road and keeping it clean after construction so it can last for much longer?


Hehehehehehehehehehe..........

You correct, O jare... grin grin grin

2 Likes

Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Nobody: 9:02am On Mar 01, 2013
Revolva: smileywell works have been going on since na...dis is a place I dey run tins almost everyday...
my Broda no vex o, u be DANFO CONDUCTOR?
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Boyoorisha: 1:12pm On Mar 01, 2013
uihebom: my Broda no vex o, u be DANFO CONDUCTOR?
Na only Danfo conductor dey ply the road daily?
Re: Julius Berger Resumes Work On Apapa-oshodi Expressway (pictures) by Boyoorisha: 1:13pm On Mar 01, 2013
I hope the work won't stop again!

(1) (Reply)

Good Car Mp3/cd/fm Player / The Remain Of A Family Car After Crashing Into A Wall With 120MPH. / Toyota Tundra Experience

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.