Nairaland Forum / Nairaland / General / Properties / Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain (1225 Views)

Cost Of Building A House In Nigeria / Rhematex Real Estate: Apartments for sale and rent in ibadan / 16 Rooms Self Contain Hostel (2) (3) (4)

(1) (Reply) (Go Down)

Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by TR00ZE: 1:36am On Dec 13, 2015
Hello......
Can some one help me with an estimate of building an apartment of 6 storey building with 53rooms self contain on each floor and a open plan ground floor on not more than 8plots...
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by Nobody: 3:04am On Dec 13, 2015
TR00ZE:
Hello......
Can some one help me with an estimate of building an hostel of 6 storey building with 53rooms self contain on each floor and a open plan ground floor on not more than 8plots...

I believe that this is beyond the scope of this forum. Or at the very least will require a paid effort for the level of work that it will require.
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by Domaro: 3:05am On Dec 13, 2015
Such can be determined when i saw the survey plan, and a close approximated estimate can only be achieved when you have finished the design. I can model a good design for you if you care. check my signature for my contact lets talk more. .
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by Domaro: 3:10am On Dec 13, 2015
53 bedroom per floor turns out to be approx. 7 rooms per plot, in all it may take only about 50-60% of the entire space, this mean that you will have enough space as compound. the building will not necessary be a single structure per say, but it may be design to look as such.

1 Like

Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by eghosajohnny: 6:53am On Dec 13, 2015
TR00ZE:
Hello......
Can some one help me with an estimate of building an hostel of 6 storey building with 53rooms self contain on each floor and a open plan ground floor on not more than 8plots...

I can handle it for you that will be 6 selfcon on 3plot and 7 on 5plot

And the location too.

Here's my contact below

07014709098,07031886484 both on whatsapp

Expecting to hear from so I can give out the quote
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by KolaShangOne(m): 4:41pm On Dec 13, 2015
TR00ZE:
Hello......
Can some one help me with an estimate of building an hostel of 6 storey building with 53rooms self contain on each floor and a open plan ground floor on not more than 8plots...

Estimate ke? For 6 storey building? Especially if it's an area like Ajah..
You had better go to a registered construction firm, sit, discuss and analyse before taking any decision. Ask for certifications.

1 Like

Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by TR00ZE: 7:33pm On Dec 13, 2015
Thanks to every one who gave a reply.... And for domaro here is my contact 08144492296 perkles302@gmail.com
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by TR00ZE: 12:56am On Dec 14, 2015
Keeping my fingers crossed
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by TR00ZE: 3:39pm On Dec 26, 2015
Hello
Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by olumide4christ: 8:20pm On Dec 26, 2015
TR00ZE:
Hello......
Can some one help me with an estimate of building an apartment of 6 storey building with 53rooms self contain on each floor and a open plan ground floor on not more than 8plots...

You cannot embark on such a project without first engaging a professional QUANTITY SURVEYOR (a specialist in construction costs and economics) to provide you with what is called a preliminary cost (budget) estimate, based on previous cost data on such projects and/or some preliminary sketch from your architect .

Its called preliminary because its assumed you don't have detailed architectural and structural drawings yet and as such, when you eventually get the detailed drawings, bills of quantities will be prepared which will give you accurate cost of the proposed project.

Any other figure that anyone might tell you off-hand would just be guesswork.

Re: Cost Of Building a 6storey building With Capacity Of 318 Rooms self contain by brabus(m): 6:21am On Dec 29, 2015
EgunMogaji:


I believe that this is beyond the scope of this forum. Or at the very least will require a paid effort for the level of work that it will require.

It's not just beyond the scope of the forum. The forum is not the starting point for such project. The OP just need to understand that only the Governor (Lagos state I know) can approve such project. That's the starting point. The contractors must be duly registered and provide the evidence that he has worked on a similar project. The bills must be prepared by a certified QS. Bros, no be seresere o.

Your project board must be clearly displayed with the names of the main contractor, architect, structural firm, electrical and mechanical firm. You'll need to submit (can't remember exact no) about 7 copies of EIA report to the governor who gives the approval. Soil tests must be carried out and the reports must accompany the proposal with the name of the lab (if not govt lab) and a lot more.

Bros, you may want to ask why all this? The rate of building collapse in Lagos is very alarming and so Gov. Fashola mandated this.
I'm sharing this info with you because you'll see people that will tell you to go ahead, we will settle the officials. The truth is you have to ask yourself "Does it worth the extra effort?" And let your conscience do the rest.

However, a structure (already at 7th floor) belonging to one of the new generation bank in Nigeria was ordered for demolition for non compliance and structural failure.

That's my 50 cent!

1 Like

(1) (Reply)

Roofing Cost / Using 0.55mm Steptiles Aluminium In Yanapaja (cost) / Hot Rent........2beroom To Let @majek Area Of Lagos Wit Pictures

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.