Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos (2112 Views)

Dunamis Church: Unveiling The World Largest Church Auditorium (glory Dome) / Queens Garden Estate Simawa Close to Rccg New Auditorium .i / Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice (2) (3) (4)

(1) (2) (Reply) (Go Down)

Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 3:43pm On May 18, 2018
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers.

We currently have a brief for a client to construct a church auditorium using steel stanchions as the framework and blockworks for the facade carcass.

There is an existing church auditorium building on the land and this will be demolished once the new auditorium is completed.

We will share the floor plan, elevations and 3D views once we have permission from the client.

Size of land - 1075.2sqm
Total area of building - 416.0sqm
Estimated budget for construction - currently unknown
PROJECT timeline - 6 months

We have started with the foundation work which is a pile foundation and work is moving at a steady pace. We will be casting the suspended german floor soon. Reinforcements work is ongoing on site.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Dominionng(m): 2:41am On May 19, 2018
Well-done boss, been a while.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Nobody: 3:55am On May 19, 2018
Are the planks on a one way trip?
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 1:55pm On May 19, 2018
Dominionng:
Well-done boss, been a while.

Yes boss, its been a long hiatus for me. Juggling work and updating projects progress became a hassle due to fatigue, but am back now. How have you been?
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 1:57pm On May 19, 2018
EgunMogaji:
Are the planks on a one way trip?

Yes sir, one way trip. Its a suspended floor slab so it removes the backfilling stage. Plus and minus variable cost of backfilling against cost of losing the woods.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Nobody: 3:31pm On May 19, 2018
BITSWORKS:


Yes sir, one way trip. Its a suspended floor slab so it removes the backfilling stage. Plus and minus variable cost of backfilling against cost of losing the woods.

Thanks for the explanation. And double thanks for taking time to share your project with us.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by mufutau55(m): 4:07pm On May 19, 2018
BITSWORKS:

We have started with the foundation work which is a pile foundation and work is moving at a steady pace. We will be casting the suspended german floor soon. Reinforcements work is ongoing on site.

My Oga is back. Always your follower and learning. Welcome back.

Hajji M.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:05pm On May 19, 2018
Reinforcements mat work on suspended wood platform formwork.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:07pm On May 19, 2018
mufutau55:


My Oga is back. Always your follower and learning. Welcome back.

Hajji M.

My oga Hajji M, am loyal sir. Am pleased to be back too, have missed this forum.

3 Likes

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by twinskenny(m): 5:14pm On May 19, 2018
Welcome back chief.. good luck
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Rubbiish(m): 5:46pm On May 19, 2018
Nice one! Thought u guys have abandoned this forum....
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Rubbiish(m): 5:49pm On May 19, 2018
BITSWORKS:
Reinforcements mat work on suspended wood platform formwork.
We would have loved to see how the piles were bored...Meaning there is no sand filling for this building?
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by mufutau55(m): 8:35pm On May 19, 2018
BITSWORKS:

My oga Hajji M, am loyal sir. Am pleased to be back too, have missed this forum.

Yes Sir. Glad to hear you have been busy.

Hajji M.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Nobody: 9:34pm On May 19, 2018
mufutau55:


Yes Sir. Glad to hear you have been busy.

Hajji M.

Astute and demonstrated professionals like him will always be busy.

1 Like

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 3:31pm On May 20, 2018
twinskenny:
Welcome back chief.. good luck

Thanks Twinskenny.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 1:30pm On May 21, 2018
Rubbiish:

We would have loved to see how the piles were bored...Meaning there is no sand filling for this building?

Unfortunately, I had a mishap with my phone on site and lost those pictures due to formatting of the memory. However, the pile points are 40 in all with 24 pile cap and we used percussion machine with casing. It took about 30 days to complete the boring, casting of pile points, pile caps and tie-beam.

Yes, we are not backfilling the trenches. The german/over site concrete slab will be suspended.

2 Likes

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Rubbiish(m): 3:17pm On May 21, 2018
BITSWORKS:


Unfortunately, I had a mishap with my phone on site and lost those pictures due to formatting of the memory. However, the pile points are 40 in all with 24 pile cap and we used percussion machine with casing. It took about 30 days to complete the boring, casting of pile points, pile caps and tie-beam.

Yes, we are not backfilling the trenches. The german/over site concrete slab will be suspended.
Okay...Well explained sir.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:57pm On May 21, 2018
Casting of the suspended german floor/oversite concrete. We had dumped 2 trips of 30 tons granite and 4 trips of 20 tons sharp sand. The thickness of the slab is 6inches ( 150mm ) and the mix ratio is 1:2:4.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:58pm On May 21, 2018
More pictures

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 6:06pm On May 21, 2018
The finished work.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 6:21pm On May 21, 2018
Installation of the steel stanchions.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by Nobody: 6:42pm On May 21, 2018
Looking good.

Money is showing.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by EndiaSami: 12:39am On May 22, 2018
Welldone o. Oga bitsworks.... Welcome, we don miss u sha.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 7:27am On May 24, 2018
EgunMogaji:
Looking good.

Money is showing.

Yes boss!
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 7:28am On May 24, 2018
EndiaSami:
Welldone o. Oga bitsworks.... Welcome, we don miss u sha.

Thank you, missed you too my brother.
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by InvertedHammer: 9:07am On May 24, 2018
/*
Not impressed.


*/
Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 9:25am On May 24, 2018
Steel stanchions installation completed.

Aerial shots of steel stanchions taken by our DJI Phantom drone.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:51pm On May 24, 2018
Blockwork using 9inches sandcrete blocks as shell on the steel stanchions.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 5:55pm On May 24, 2018
Block setting. The first coach run has to be properly bedded and plumb right to have a straight and consistent course.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 6:09pm On May 24, 2018
Block setting.

Re: Bitsworks Project Memoirs: Construction Of A Church Auditorium Surulere Lagos by BITSWORKS: 6:53pm On May 24, 2018
Regular checks with a plumb, line and range ensures we maintain a straight and firm blockwork course.

(1) (2) (Reply)

Looking For A Good Architect And Builder In Ibadan, Oyo State / 100 Plots Of Land Beside Greenspring School, Lekki / Another 3 Plots Of Land In Ogombo Greenland Estate Ajah @ 1.7m Par Plot

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.