Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,321 members, 7,819,100 topics. Date: Monday, 06 May 2024 at 11:11 AM

FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road (23517 Views)

First Kilometre Of Lagos-Calabar Coastal Highway Completed With Street Lights / Lagos To Demolish Landmark Beach Resort For Coastal Road / Lagos - Calabar Coastal Highway Includes Railway Tracks In The Middle (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Great100000: 3:04am On Mar 08
The Federal Government has announced the commencement of construction work on the 700km Lagos-Calabar Coastal Highway, spanning 9 States with two spurs leading to the Northern States.

Minister of Works, Engr. David Umahi, announced this during the official handover of the first phase of the project, made up of 47.47 kilometers dual carriageway, to Hitech Construction Company Ltd, and which is to be constructed in concrete pavement.

This was contained in a statement issued by the Special Adviser (Media), to the Minister, Hon. Orji Uchenna Orji, in Abuja, late on Thursday.

According to him, the Minister who was in company with the Federal Ministry of Works’ Controller in charge of Lagos State, Engr. (Mrs) O. I. Kesha, emphasised the need for all contractors handling Federal Government’s road projects to deliver within a record time, noting that the government would not allow variation arising from delays or slow pace of work once mobilization had been done.

Orji quoted the minister as commending Hitech Construction Company Nigeria Ltd for being reputable for quality and speedy delivery of jobs.

The minister he said, acknowledged their efforts in starting work immediately after the contract was awarded.

He quoted Umahi as saying,”They have completed some filling of 1.3 kilometer from the day the project was awarded to them. It shows the speed they are going to deploy to this project.

“Within a couple of weeks, we awarded the project to them, they mobilized a lot of dredging equipment, and you can see that they have recovered 1.3 kilometer of section one of the phase.”


Orji said the Minister who also visited project sites at the Queen’s Drive Ikoyi, the Third Mainland bridge top deck, the under water, the Eddo bridge, the Eko bridge and Carter bridge expressed the determination of the Federal Government to carry out a comprehensive rehabilitation of the bridges which he said are critical links between the Mainland and the Island of Lagos, the economic hub of the country.

Quoting the minister further, statement read, “These repairs are expected to cover not only the top of the bridge but also the under bridge works.

“At the Third Mainland bridge, we have three or four critical elements to be rehabilitated. The first one is the deck, and the deck is about 11 kilometers two. That is dual carriageway, including the ramps, and it has been done by CCECC.

“They have done very beautiful jobs, but we have not concluded. Before the end of March, we’ll be concluding the asphalt milling and the reasphalting.

Umahi added , “But that is not all our commitment there. We are installing the guardrails, we are replacing the lights with solar light, we are going to put some decorative lights too, and then we are going to put CCTV camera both on top and under the bridge to check insecurity and illegal mining of sand, which is causing scouring on the piles and the pipe bits.

“The second job is that some sections of the slab are deflected, and so what we have done is to get an expert to understudy the level of deflection.

“That’s the tendons of the slab that deflected. And so we are going to cut open the slabs, enter and then look at it, scoop it, and then reinstate the tendons of the slab. There’s nothing to worry about. It’s been done at a Eko bridge by Buildwell. So this one is not a threat to us at all.”

The minister also commended what Julius Berger Nigeria Ltd is already doing, which is restoration of deteriorated peirs and peir caps including the cover of peirs and peircaps themselves, and said the piles which he also inspected were the most critical of the works to be done.

Earlier in their respective remarks, the State Controller, Federal Ministry of Works and the representatives of Hitech Construction Nigeria Ltd, Julius Bergger Nigeria Ltd, China Civil Engineering Construction Corporation Ltd, and. Buildwell Nigeria Ltd assured the Honourable Minister that they would continue to work in line with the spirit of excellence, which the Renewed Hope administration of *His Excellency President Asiwaju Bola Ahmed Tinubu is known for.

Source: https://www.vanguardngr.com/2024/03/fg-begins-construction-of-700-km-lagos-calabar-coastal-road/

25 Likes 7 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Asonaijaaso: 3:10am On Mar 08
Another good news from the Federal Government.
Engr David Umahi for president.

41 Likes 5 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by BewareOf419: 3:26am On Mar 08
Hitech of Tinubu wan do road

11 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Biodun556(m): 3:31am On Mar 08
Good

1 Like

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Tellmeastory: 3:42am On Mar 08
Lagos - Calabar Coastal Highway



Rail

16 Likes 10 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Nbotee(m): 4:43am On Mar 08
This is a welcome development, these roads will open up new areas and connect more states and villages but what about existing roads in horrible states?? The road leading from before Ajaokuta to Oturkpa to Enugu is in horrible state. Some portion of the Lagos Ibadan is still there. These bad roads are now a hotspot for criminals and are what's aiding Kidnappings on the roads

37 Likes 4 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Cassandraloius: 6:48am On Mar 08
Good development.

1 Like

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Anguldi(m): 6:49am On Mar 08
tongue
Tinubu Amaka

4 Likes 3 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Okete001(f): 6:49am On Mar 08
Hehehe

Enemies of this country will never appreciate good gestures.

They will start calling it propaganda again .

Only a bastard wishes his father's house sinks.

Orílè èdè Nigeria á dára oo, àmín èdùmàrè

22 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Wisejohnson47(m): 6:50am On Mar 08
Early morning good news, hope they complete it on time,
God bless Nigeria

5 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by GardenOfGod(m): 6:50am On Mar 08
Calabar Itu highway that this government should ensure its completed, they have not.. Now they want to start a project that will not be completed in the next 50 yrs.

Modified:
naija4life247:


Cry, weep, wail. We are moving forward while you are crying backwards
Who is moving forward?
Is it a country where rice is 80k a bag? Cement 11k a bag?
De play grin

25 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by ClearFlair: 6:50am On Mar 08
People are hungry
Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Umueme: 6:50am On Mar 08
Do we really need this now? Of what economic essence is this road? Nigeria and misplaced priorities. We only endure all this rubbish cos we vote alongside illiterate and unenlightened people who only care for money given to them at the polling booth, and not what each person on the ballot has to offer



#MyOpinion

11 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Nbote(m): 6:50am On Mar 08
Maintaining and fixing up existing ones would make a whole lot more sense.

14 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by DearDealz: 6:51am On Mar 08
Ok ooo
Mathematics Assignment.

Lagos ibadan expressway 120km ; 11 years and still not completed.



Lagos Calabar road 700km ; How many years E go be ?

33 Likes 3 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Blackfire(m): 6:51am On Mar 08
Story story.....story

4 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Eteka1(m): 6:52am On Mar 08
Let's watch and see how it goes

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by omowolewa: 6:53am On Mar 08
That is good

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by EnglishUsa: 6:54am On Mar 08
Let them use concrete so that there will be know much maintenance in future

4 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by marlow1962(m): 6:55am On Mar 08
Nothing Nigerians glorify more than roads. If you like starve them for generations to come, just tell them you will give them a poorly constructed roads and watch them jubilate and sing praises to your name. They don't give a phuck about every other thing affecting them, just construct roads for them, roads that even 70% of praise singers will not apply.

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Judolisco(m): 6:56am On Mar 08
Good but like someone said above let's fix horrible roads..... Ilorin - kabba road and bida-minna road have been there for years...

4 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by datola: 6:57am On Mar 08
All the best
Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Ernerstdavid55(m): 6:57am On Mar 08
Will it pass tru epe or ibeju lekki
Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Thisis2raw(m): 6:58am On Mar 08
Buhari woefully 8yrs is making Tinubu work twice as hard.

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Judolisco(m): 6:58am On Mar 08
Umueme:
Do we really need this now? Of what economic essence is this road? Nigeria and misplaced priorities. We only endure all this rubbish cos we vote alongside illiterate and unenlightened people who only care for money given to them at the polling booth, and not what each person on the ballot has to offer



#MyOpinion
iswr jst fix d bad roads... We can build new ones later

6 Likes 1 Share

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by tolue42(m): 6:59am On Mar 08
Blackfire:
Story story.....story

This is not story story.. sand filling started two weeks ago

18 Likes 2 Shares

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by onuman: 7:02am On Mar 08
To suck more resources from the Niger delta region to the SW region, that’s all about the rush; koweei

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by onuman: 7:04am On Mar 08
tolue42:


This is not story story.. sand filling started two weeks ago

Rush rush. In the presence of economic crisis. Objective?

2 Likes

Re: FG Begins Construction Of 700 Km Lagos-Calabar Coastal Road by Tap0lane: 7:15am On Mar 08
Don't mind him Geometric or Innoson should have been the ones to do the road n not Hitech


BewareOf419:
Hitech of Tinubu wan do road

5 Likes

(1) (2) (3) (4) (Reply)

Azman Air Commences Flight Operations From Kebbi To Other States(pics) / Photo: Young Nigerian Medical Doctor Missing In Texas / Fully Loaded PMS Tanker Falls at Otedola Bridge Due To Brake Failure

Viewing this topic: 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.