Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,154,736 members, 7,824,084 topics. Date: Friday, 10 May 2024 at 10:21 PM

CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI - Properties (20) - Nairaland

Nairaland Forum / Nairaland / General / Properties / CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI (226781 Views)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI / PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI / Construction Process Of A Wing Duplex+flat At Ajah (2) (3) (4)

(1) (2) (3) ... (17) (18) (19) (20) (21) (22) (23) ... (101) (Reply) (Go Down)

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by amanikondo: 2:27pm On Aug 17, 2013
Make sure the compound is slope downward to drain properly. That works like a charm.
ahf:

As asked,
2) How do we prevent the growth of agae on the stones?

This question is a current big problem of a lot of jobs seen. To be fair, some jobs don't have the algae problem.

Thus, what causes the algae?
How can one prevent it?

Thanks for the information exchange, guys are great on this forum !!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:14pm On Aug 17, 2013
Door frame

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:12pm On Aug 18, 2013
amanikondo: Make sure the compound is slope downward to drain properly. That works like a charm.
correct
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:04am On Aug 19, 2013
Happy new week!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 1:38pm On Aug 19, 2013
I wanna learning, thanks for the continuous teaching
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 7:13pm On Aug 19, 2013
to prevent algae growth , pressure wash your stones occasionally, in most cases the beauty of stones is better when it is averagely level than having it sloppy if you do not want to the slope method or you already have your stone on a plane level then pressure wash.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by amanikondo: 12:32am On Aug 20, 2013
Aventures: to prevent algae growth , pressure wash your stones occasionally, in most cases the beauty of stones is better when it is averagely level than having it sloppy if you do not want to the slope method or you already have your stone on a plane level then pressure wash.
It has to slope a bit to drain properly my chairman. How many homes like to do pressure washing in Nigeria for their concrete regularly? We lack maintenance culture.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:25pm On Aug 20, 2013
Many activity in progress ...pics soon
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 2:29pm On Aug 20, 2013
segcy.moor:
Many activity in progress ...pics soon

Eyes are itchy
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:35pm On Aug 21, 2013
[quote author=Fhemmmy]

Eyes are itchy [/quote
Very soon
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:36pm On Aug 21, 2013
[quote author=Fhemmmy]

Eyes are itchy [/quote
Very soon .

.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:39pm On Aug 21, 2013
[quote author=Fhemmmy]

Eyes are itchy [/quote
Very very soon .

.
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 5:57pm On Aug 21, 2013
grin cheesy tongue
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:07am On Aug 22, 2013
Monring
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:20pm On Aug 22, 2013
!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:02pm On Aug 23, 2013
!!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by tlops(m): 5:46pm On Aug 25, 2013
The building is becoming clearer by the day... Kudos to you and your team!

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:15pm On Aug 26, 2013
tlops: The building is becoming clearer by the day... Kudos to you and your team!
thanks..
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:55am On Aug 27, 2013
Tiles work continues
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:01am On Aug 27, 2013
pics

1 Like

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by twinskenny(m): 10:06am On Aug 27, 2013
my oga weldone sir,

I email the man as you said, but no reply from him up till now.. i am still hoping though grin grin
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 1:40pm On Aug 27, 2013
Keep teaching us jare . . .
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by mufutau55(m): 3:52pm On Aug 27, 2013
Fhemmmy: Keep teaching us jare . . .

I like the way Segcy.. is putting this combination of wall/wall tiles and the floor tiles.. This is pro finishing.

Hajji Mufutau
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 3:59pm On Aug 27, 2013
mufutau55:

I like the way Segcy.. is putting this combination of wall/wall tiles and the floor tiles.. This is pro finishing.

Hajji Mufutau

very nicely done
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:13pm On Aug 27, 2013
Door fixing

Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Fhemmmy: 1:23pm On Aug 28, 2013
Presence Sir, for more learning! . . . Clear and Sharper pix Sir
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:59am On Aug 29, 2013
[ . . . Clear and Sharper pix Sir[/b][/color][/quote]
Noted!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:54pm On Aug 29, 2013
twinskenny: my oga weldone sir,

I email the man as you said, but no reply from him up till now.. i am still hoping though grin grin
He actually acknowledge ur mail. I think he will contact u when due
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:28am On Aug 30, 2013
!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:44pm On Aug 30, 2013
segcy.moor:
!
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by fendorf(m): 11:06pm On Aug 30, 2013
[quote author=segcy.moor][/quote]
Re: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:16pm On Aug 31, 2013
!

(1) (2) (3) ... (17) (18) (19) (20) (21) (22) (23) ... (101) (Reply)

Prices For These Paints / How Large Is 'A Plot' Of Land? / Best Architectural, Interior And Construction Works

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 16
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.