Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by benzion72(m): 8:12pm On Feb 15, 2016 |
Nigeria filled with educated illiterate since 1914, Mechanical Engineer, who cannot change his car engine oil, Doctor who consults note. to diagnose patients. quantity surveyors on papers. Ask your landlord, the baba ijebu, baba egbas, how much he paid to construct the house you are now paying thousands annually. if i am the op i will become shrewd and build two flat with two bedrooms each with no. ceremonies. And become a landlord myself 2 Likes |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by austinbrown: 8:25pm On Feb 15, 2016 |
canalily:respect ur self pls |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by preggi(m): 8:26pm On Feb 15, 2016 |
Eintelekt: Yes, I meant the Kitchen. It is not compulsory but it is better to have a window in the Kitchen. That was another paragraph and the KITCHEN was discussed. It is better to understand the context before reaching conclusion. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by waldigit: 8:32pm On Feb 15, 2016 |
agarawu23:Its 3 Brm all room ensuite and we are presently around 2000 |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Nobody: 8:32pm On Feb 15, 2016 |
agarawu23:32 bag of cement @#1,800 = #57.600 Two brick layers and a casual for 6 day = #39.000 10 ton of sharp sand and 10 tons of gravel = #50.000. 2000 pcs of block @140 =#280.000 Total = #426.600 2 Likes |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by BOUNTYDOG(m): 8:35pm On Feb 15, 2016 |
Adegbulugbe: Very discouraging. Even Rome was not built in a day. Like one architect said,u stop a point where your 3m can get u and continue later when you can rather than saving the 3million and working more,u don't know wind can blow money? Trying to save more on the 3m can be so tricky! |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by segunmebodinseu(m): 8:35pm On Feb 15, 2016 |
3million can do anything ,because u will need to buy cement,sand,blocks,slate,wood,paint,tiers etc.Now talking about the workers: digging of ground is involve,workmanship(flooring of the land,setting of blocks,plastering of the wall,carpenter,painting) etc.To be sincere with you,u will need close to 9million to 10million because u are fencing the house. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Nobody: 8:49pm On Feb 15, 2016 |
agarawu23: Standard duplex? In which country? Oya com build am make I see Wont he do finishing? This is exactly why we have substandard buildings all around. This is Mowe and Ikorodu. Unless of course you want to be dealing with cracked walls and collapsing fences and water attacks, then you can go ahead and execute your project with 6 million. Lets see how long the house will continue to make you proud. Besides he didn't say he was on a tight budget did he? He simply asked for an ESTIMATE and i gave him a top notch one. Personally I wont spare any expense to build my own home. I would rather go and buy and renovate a flat in a high brow Jakande Estate or LSDPC estate than waste 6 million building a substandard home. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by hurricaneChris: 8:56pm On Feb 15, 2016 |
EgunMogaji: Could you please open another thread on this topic, lets discuss it there. I dont want us to derail this thread. If/when you open the thread, please tag me. 1 Like |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by UgoPapa: 9:02pm On Feb 15, 2016 |
Depends on the kind of material you want to use. 1). Kind of roofing sheets. (stone coated, longspan, ordinary zinc) 2). Tiles. (China, Italian, ordinary ventrified, marble etc) 3). Plumbing. 4). Electrical; Nigerian wires like cutix, Niger chin etc are more expensive than Chinese wires. Electrical fittings can be expensive but still boils down to the type you want. 5). General finishing; POP/PVC ceilings/ordinary eternit ceiling, wall screeding or you leave it like that after plastering, Type of paint. However if you want to buy cheap material/labour 3.5million to 4.5million will do the job. 1 Like |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by HRMEzeMO(m): 9:40pm On Feb 15, 2016 |
contact
an Engr on
08035090318
onyejones56@gmail.com
for proper BOQ |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by agarawu23(m): 9:40pm On Feb 15, 2016 |
Ganoderma:yes sir Standard duplex with 13m if you know pass your boundary. I am a stalker of spider's thread on his low budget duplex and i know how much he as spent and the level of the building. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by 100Cents: 9:43pm On Feb 15, 2016 |
iamlarry99: N8m with fence, borehole, C of O.. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by agarawu23(m): 9:44pm On Feb 15, 2016 |
Rotentina:oga change even remain Where did you get a bricklayer that took 39k to mould 2000pcs block? You no use iron? 1 Like |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by agarawu23(m): 9:45pm On Feb 15, 2016 |
waldigit:OK sir! |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Nobody: 9:45pm On Feb 15, 2016 |
agarawu23: And how exactly do you define boundary. Remember its a home not a development project |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by thedio(m): 9:50pm On Feb 15, 2016 |
[quote author=yemmit90 post=42947625] Be realistic please. maximum he can spend on blocks work plus workmanship is 500k. @op, use your 3m very well, i'm sure you may not need up to a million if the money is not enough. Nawa o, some people just dey call millions anyhow. Well, experience they say is a best teacher.[/quote 500k is small around 800k will complete the brick work with workmanship |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by agarawu23(m): 9:51pm On Feb 15, 2016 |
Ganoderma:https://www.nairaland.com/2712462/making-low-budget-5-bedroom |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by phizzle20: 9:54pm On Feb 15, 2016 |
dependin on d foundation type if the soil is gud...with finishes 6 million shld finish it if well managed...4rm xperience as an engineer |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by innie77(m): 9:59pm On Feb 15, 2016 |
iamlarry99: With modest Finish, max should be 3.5m with external works. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Lanceslot(m): 10:09pm On Feb 15, 2016 |
wristbangle:1. How many blocks do he need to build the 3 bedroom bungalow? 2. How much do they sell block around ikorodu/mowe area? |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Engineermbugame(m): 10:18pm On Feb 15, 2016 |
tosyne2much:na smal moni o get place wey i go work d man dey buget 21 million only for lister @hotel |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by tosyne2much(m): 10:23pm On Feb 15, 2016 |
Engineermbugame:God dey oooo baba |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by vitality22(m): 10:25pm On Feb 15, 2016 |
Chukazu:Honestly, I will like to have you builders contacts. I bought a land in mowe and plan to build a duplex there. Unfortunately, my budget is 6million |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Engineermbugame(m): 10:27pm On Feb 15, 2016 |
tosyne2much:building dey drain money wella |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by ogunsbanjul(m): 10:31pm On Feb 15, 2016 |
Within Mowe here it will cost 4.5 millions naira but in Ibadan it will cost 3.9 million while in Abuja 7 million and in Lagos 7.5 million. Thanks |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by tosyne2much(m): 10:33pm On Feb 15, 2016 |
Engineermbugame:No be small money e dey drain oooo |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Nobody: 10:41pm On Feb 15, 2016 |
agarawu23: You see yourself. Na una dey lead person enter inside hole. As at the last estimate of your link the figure stands at close to 5 million and the Superstructure is only barely completed. Roofing has not even started yet not to mention plastering before you now start talking about fittings and finishing which by the way is the most expensive part of a building construction. Secondly this is Enugu and not Lagos. You cannot compare the cost of labor in both places. Thirdly, the quality of the blocks used are nothing to write home about. Those blocks will give way with just a small pinch form my fingers. In time the walls of that building will start cracking and you begin to have water marks all over the place. And you know what that means. Mould and fungi with highly carcinogenic properties. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Chukazu: 11:05pm On Feb 15, 2016 |
agarawu23: no problem. will try and see what I can do about the analysis because majority are with my younger sister, who though was a bit wasteful but very helpful.. because the house is located in my villa, all I did was send money to her for necessary materials. have been saving up some pictures and idea to share with everyone, maybe it's time to do so. just gif me this week to share. thanks |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by Chukazu: 11:07pm On Feb 15, 2016 |
vitality22: will do that sir. |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by topaaz(m): 11:11pm On Feb 15, 2016 |
ricki:when you're through with painting and would needing a cleaner, i'll be at your service sire. 08123198896 |
Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by topaaz(m): 11:20pm On Feb 15, 2016 |
sheunflexy:Boss, you can always contact me whenever there's a need for a cleaner. 08123198896 |
(1) (2) (3) (4) (5) (6) (7) (8) (Reply)
The Nigerian City With The Most Outrageous Accommodation Fees / The Nigerian Tenancy Law On Eviction? / Building from the Diaspora: 3 Bedroom Bungalow + Penthouse (2 Rooms) at Calabar
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 59 |