Re: Estimating Building Costs, One Step At A Time. by seguntijan(m): 3:38pm On Jun 29, 2016 |
abdurrazaq: Exactly my point sir |
Re: Estimating Building Costs, One Step At A Time. by abdurrazaq(m): 3:46pm On Jun 29, 2016 |
seguntijan:I was just trying to point out the difference between Construction Management and Project Management. Peace |
Re: Estimating Building Costs, One Step At A Time. by seguntijan(m): 5:14pm On Jun 29, 2016 |
abdurrazaq:I get sir, I was only against the point that the Architect is the chief consultant, I was just trying to explain that there's no superiority in the built environment professions. |
Re: Estimating Building Costs, One Step At A Time. by Nobody: 5:30pm On Jun 29, 2016 |
Chai, I was late to class. |
Re: Estimating Building Costs, One Step At A Time. by AssoJnr: 12:28pm On Jun 30, 2016 |
NLresidentQS:that's why I never mentioned setting out, I only said site plan. setting out is sorely the responsibility of the land surveyor 1 Like |
Re: Estimating Building Costs, One Step At A Time. by NLresidentQS(m): 12:26pm On Jul 01, 2016 |
troubleshooter: God bless you too, sir. |
Re: Estimating Building Costs, One Step At A Time. by miredia(m): 5:28pm On Aug 02, 2016 |
NLresidentQS:You are a good man. |
Re: Estimating Building Costs, One Step At A Time. by NLresidentQS(m): 6:04am On Aug 03, 2016 |
miredia: God bless you sir. |
Re: Estimating Building Costs, One Step At A Time. by chubbyG(m): 8:26pm On Aug 03, 2016 |
is this thread closed? No posts again? |
Re: Estimating Building Costs, One Step At A Time. by NLresidentQS(m): 5:50pm On Aug 10, 2016 |
It is very much active sir...! |
Re: Estimating Building Costs, One Step At A Time. by lusen(m): 11:36am On Aug 12, 2016 |
wow! insightful thread. |
Re: Estimating Building Costs, One Step At A Time. by NLresidentQS(m): 12:27pm On Aug 12, 2016 |
Thanks Sénor. Our services are very much available and reliable. You will definitely come rushing back. Not for complains tho, but for more... |
Re: Estimating Building Costs, One Step At A Time. by harryjunior17(m): 3:28pm On Dec 24, 2016 |
Pls.. Sir.. Continue wit d measurements for concrete frames at d super structure... D slabs and beams.. Waiting |
Re: Estimating Building Costs, One Step At A Time. by jidesp(m): 12:19pm On Aug 04, 2017 |
if Laterite filling is 200mm directly below the ground level, does that mean average depth of topsoil excavation to be 200mm as well or it would still be taken as the Average depth of 150mm. |
Re: Estimating Building Costs, One Step At A Time. by bixton(m): 1:08pm On Aug 04, 2017 |
jidesp:You ought to know your excavation depth first before you determine what volume to fill. |
Re: Estimating Building Costs, One Step At A Time. by Osekele(m): 1:37pm On Sep 08, 2018 |
Pls what is d current rate for 1.Blockwork 2.Concrete and 3.Excavation? Thanks. |
Re: Estimating Building Costs, One Step At A Time. by Kokopos(m): 7:46pm On Feb 07, 2019 |
good job 1 Like |
Re: Estimating Building Costs, One Step At A Time. by kingmuyiwa(m): 2:48pm On May 22, 2019 |
call and whatsapp for you structural designs and drafting 08034698250 1 Like 1 Share |
Re: Estimating Building Costs, One Step At A Time. by NLresidentQS(m): 10:47am On May 26, 2019 |
Kokopos: Thank you |
Re: Estimating Building Costs, One Step At A Time. by OgundiranSeun: 12:07am On Oct 08, 2020 |
This is a nice write up however there's a huge gap (in some areas) which is far from reality. Backfilling from your post is not what is experienced on the field. A lay man will at the end of the day use your post and the architectural drawing ( which at most times the architect don't visit the site to know the terrain, level or otherwise at the site) then juxtapose the cost of "actual filling" needed to complete the job while forgetting that there are procedures to back filling itself. It will be noteworthy to clearly state that your piece does not reflect what happens on site (most drawings are done by architect; who rarely visit the site and the structural drawings are much straight to point). |
What Is That Diabolical Sign To Look Out For While Renting An Apartment? / Tears As Lagos Government Demolishes 13 Houses In Ajao Estate (Video) / Sandra Duru's Landlord Throws Out Her Properties From Lagos Home (Photos)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19 |