Re: Lagos Light Rail Project Dragging Too Long — PDP by kunmiiii: 2:27pm On Aug 16, 2018
Pls people should already know PDP is an expert on things that drag too long, after all for 16 YRS they dragged Nigeria into the abject poverty and decay it is in right now!!

2 Likes 1 Share

Re: Lagos Light Rail Project Dragging Too Long — PDP by seguno2: 2:28pm On Aug 16, 2018
jamace:
Ask Amaechi. It was abandoned by Amaechi. It is not a viable project. Amaechi only used it to syphon Rivers state money for 2015 elections.

Thanks for pointing out that fact, which Amaechi paid N22 billion to consultants to tell him.
Such a bloody waste by a thief and rogue.

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by Omooniya1: 2:29pm On Aug 16, 2018
who dey talk? what about PDP headquarters, 18 years what have u done about it.... shameless failure dey talk

5 Likes 1 Share

Re: Lagos Light Rail Project Dragging Too Long — PDP by seguno2: 2:29pm On Aug 16, 2018
AnanseK:

PDP had 16 to do it. They did nothing. See the foolish people now complaining

PDP in Lagos for 16 years?
What are you smoking

2 Likes

Re: Lagos Light Rail Project Dragging Too Long — PDP by Tinlar: 2:30pm On Aug 16, 2018
solihu:
PDP! May you be struck by a thousand kilo joules of lightening. Be scattered into smithereens! Dirty coven of witches and wizards angry
Na waoo ,but the same PDP (lagos) that frustrated the project is still complaining that complainer must be slowpoke. Useless opposition. Go borrowed sense!!

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by Acidosis(m): 2:33pm On Aug 16, 2018
Let me guess the response from APC Lagos
"Lagosians don't need light rail, they're okay with dilapidated yellow buses"
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:36pm On Aug 16, 2018
FOLYKAZE:
PDP should shut up

Why? Has PDP ever been in charge of Lagos? Before you people will start with your anthem of 16 years of PDP...All governments should be accountable to the people whether PDP or APC!

3 Likes

Re: Lagos Light Rail Project Dragging Too Long — PDP by seguno2: 2:38pm On Aug 16, 2018
Tinlar:
Na waoo ,but the same PDP (lagos) that frustrated the project is still complaining that complainer must be slowpoke. Useless opposition. Go borrowed sense!!

How can you be doing swagger on top your “useless slowpoke opposition of borrowed sense”?
Always limit your public statements to what you know.

dreamboytobi:
www.finabiz..com/2014/09/lagos-how-we-spent-n160bn-world-bank.html
The Lagos State Government yesterday justified the N160 billion it borrowed from the World Bank, noting that the fund was channelled to finance its light rail (blue line) project.
However, the state government expressed disappointment at the progress of the project, which it said, was not executed as smoothly as possible, but was optimistic of its completion.
The state Governor, Mr. Babatunde Fashola, said this shortly after inspecting the light rail terminus at the Orile-Iganmu part of the state alongside some members of the state executive council.
Speaking with journalists, Fashola said the project would have been completed in another 12 months despite that the project execution was not as smooth and speedy as he wanted it.
The governor raised questions on the
intention of the federal government for publishing the state debt profile in the recent time, wondering what could have informed the decision to make it public.
He said: “I think it was the Debt Management Office of the federal government that published the report that we have a debt of about N160billion. I do not know the intent of the publication.
“But if it was to inform the public, I think we have always kept the public informed anytime we borrow money. If there are other intentions behind that, only those who make the publication would know what the intentions are.
“But you see, when people talk about debt of a state like Lagos, they forget that after Nigeria, South Africa, Egypt and one other country, we have the fifth largest economy in Africa.
“When you are talking of about a billion naira debt to a population of over 21 million people; because if you are measuring the debt, you also have to measure the responsibility. Those are the things people keep in isolation.”
He, therefore, explained that the state government already “has in place, strategies to repay the loan. The federal government was in the know of the state’s decision to take the bond and it approved it.”
He added that the truth “is that what they do not also say is that no state in Nigeria can borrow money outside, from any multilateral agencies without the approval of the federal government.
“What they did not say is that they approved it. No state can raise money by bond the way we have done without the federal government’s approval. Both SEC and NSE are all federal regulatory agencies through which we must pass.
If they said okay, it means there must be something good about the debt.
“Our rating as a state is the same as that of the Federal Republic of Nigeria, BB minus-stable with a positive outlook. We are the only state in Nigeria that has that rating. The first bond that was taken during my first tenure has been paid; the first tranche has been paid.
“I think the second tranche will be settled around 2016 or 2017. We are already making provisions. The provisions that will be there will be in excess of what is needed,” the governor said
Fashola expressed satisfaction on the progress of the light rail project, though decried the petty delay that was encountered as a result funding, saying the project would have should have been completed in another 12 months.

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:39pm On Aug 16, 2018
RevenGeMission:
idiots

you didnt concieve the idea for 16 years


all you do is condemn

idiots

Has PDP ever been in charge of Lagos? Is it not a shame and shouldn't you be worried that a project that should not take more than 3 years is being projected to be delivered 14 years after commencement?

2 Likes

Re: Lagos Light Rail Project Dragging Too Long — PDP by Lawalemi(m): 2:41pm On Aug 16, 2018
Take the message and leave the messenger
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:41pm On Aug 16, 2018
post=70331562:
See who is talking?!
Bunch of failures.
Shameless lots.

Has PDP ever been the ruling party in Lagos? This is a state project and not federal. From Tinubu to Fashola and now Ambode, which of them were or are PDP members?
Re: Lagos Light Rail Project Dragging Too Long — PDP by obi58: 2:42pm On Aug 16, 2018
Tinlar:
Na waoo ,but the same PDP (lagos) that frustrated the project is still complaining that complainer must be slowpoke. Useless opposition. Go borrowed sense!!

How did PDP frustrate a project that has gulped over a billion Dollars (not naira o!) in World Bank loans which Lagosians are being taxed to repay since 2008 and all can be promised for 2022 is phase 1 of the project alone.

For your information phase 1 is just 3km long.

So dear brother don't make this about party please.

APC has administered Lagos for the last 19years and should account for what 1 billion dollars of Lagosians money has been used to deliver.

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by deomelo: 2:46pm On Aug 16, 2018
PM is completing in less than 3 what the same PDP clowns couldn't finish in 16 years...

No wonder Nigerians kicked them to the curb...

Bunch of worthless losers

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by Jokerman(m): 2:47pm On Aug 16, 2018
Although it's coming from the worst of sorts, APC in Lagos have not tried... Lagos should be on par with great cities by now in terms of rail transport, State cleanliness, education, Local govt amenities considering the kind of revenue it generates....

Buh what do I know, APC is my tribal party so I must support them even if they are not doing enough...
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:47pm On Aug 16, 2018
SEONaijaExpert:
Arrant Nonsense!

I think if we want to criticize we should do that with our common sense and not dive into destructive criticism just to gain cheap political points.

Everybody knows Ambode's performance record can NOT be compared to that of any PDP Governor.

The closest one somewhere in the east is just an imitation of the successes recorded in Lagos like 2 years ago.

So why is it going to take 14years to complete a 27km light rail that other countries in Africa have started, finished and started using even after Lagos commenced its own? Ambode came into office in 2015, he is projecting 2022 for this so u mean such a 'performer' needs Seven whole years for this project?
Re: Lagos Light Rail Project Dragging Too Long — PDP by Nobody: 2:47pm On Aug 16, 2018
seguno2:


Slow down the project by approving the World Bank loans for the light rail?
Why don’t you ask Lai Mohammed to teach you how to tell lies ??

You are pretending to forget that the jonadrunk administration delayed approving the second tranche of the world Bank loan?

You ex tanoids and your game of revisions.

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:48pm On Aug 16, 2018
oyb:
The same jokers who did what they could to slow down the project. grin

How?
Re: Lagos Light Rail Project Dragging Too Long — PDP by osazeeblue01: 2:49pm On Aug 16, 2018
seguno2:


The failures are properly identified.
PDP and Jonathan built the Abuja metro and Kaduna-Abuja railways in 16 years and Buhari completed it.
The 20 years continuity of Tinubu, Fashola and Ambode has FAILED to complete one small light rail after borrowing billions of dollars from the World Bank.
The same light rail started by Jakande before oloriburuku Buhari cancelled it in 1984 and made the state pay $75 million penalty for breach of contract.
Useless APC can only commission an incomplete bus stop 34 years after that senseless cancellation.
Failure knows itself.

Thank you for educating them..

Many of them don't reason with their brain.

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:50pm On Aug 16, 2018
seguno2:


The failures are properly identified.
PDP and Jonathan built the Abuja metro and Kaduna-Abuja railways in 16 years and Buhari completed it.
The 20 years continuity of Tinubu, Fashola and Ambode has FAILED to complete one small light rail after borrowing billions of dollars from the World Bank.
The same light rail started by Jakande before oloriburuku Buhari cancelled it in 1984 and made the state pay $75 million penalty for breach of contract.
Useless APC can only commission an incomplete bus stop 34 years after that senseless cancellation.
Failure knows itself.

And thankfully, they are all lumped in their saintly party where no one ever does wrong. Their hypocrisy is factory-fitted and second to none!

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by deomelo: 2:50pm On Aug 16, 2018
obi58:


How did PDP frustrate a project that has gulped over a billion Dollars (not naira o!) in World Bank loans which Lagosians are being taxed to repay since 2008 and all can be promised for 2022 is phase 1 of the project alone.

For your information phase 1 is just 3km long.

So dear brother don't make this about party please.

APC has administered Lagos for the last 19years and should account for what 1 billion dollars of Lagosians money has been used to deliver.



Sadly for you, they don't have to account for anything when it comes to this project because Lagosians are not blind, they see this project and serious work going on everyday, they see workers and engineers building massive rail bridge across the Lagoon everyday on their way to and from work. Lagosians are not stewpid or ignorant like a lot of trolls and irrelevant PDP losers.

Worry about your own village and useless village governors sometimes..

1 Like

Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:51pm On Aug 16, 2018
AnanseK:

PDP had 16 to do it. They did nothing. See the foolish people now complaining
How? That is a state project and not federal. When did PDP ever govern Lagos?
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:55pm On Aug 16, 2018
deomelo:
PM is completing in less than 3 what the same PDP clowns couldn't finish in 16 years...

No wonder Nigerians kicked them to the curb...

Bunch of worthless losers

Hello? PMB completing bawo? It is a state project and not federal; Lagos has never been a PDP state so what's the connection with PDP on this issue in the first place?
obi58:


How did PDP frustrate a project that has gulped over a billion Dollars (not naira o!) in World Bank loans which Lagosians are being taxed to repay since 2008 and all can be promised for 2022 is phase 1 of the project alone.

For your information phase 1 is just 3km long.

So dear brother don't make this about party please.

APC has administered Lagos for the last 19years and should account for what 1 billion dollars of Lagosians money has been used to deliver.
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 2:57pm On Aug 16, 2018
Jokerman:
Although it's coming from the worst of sorts, APC in Lagos have not tried... Lagos should be on par with great cities by now in terms of rail transport, State cleanliness, education, Local govt amenities considering the kind of revenue it generates....

Buh what do I know, APC is my tribal party so I must support them even if they are not doing enough...

So that is what APC is? A/Your tribal party? No wonder...
Re: Lagos Light Rail Project Dragging Too Long — PDP by adeoba2008(m): 2:57pm On Aug 16, 2018
Have they ever ruled Lagos? PDP should shut up! We don't need their sympathy.
Re: Lagos Light Rail Project Dragging Too Long — PDP by obi58: 2:57pm On Aug 16, 2018
deomelo:




Sadly for you, they don't have to account for anything when it comes to this project because Lagosians are not blind, they see this project and serious work going on everyday, they see workers and engineers building massive rail bridge across the Lagoon everyday on their way to and from work. Lagosians are not stewpid or ignorant like a lot of trolls and irrelevant PDP losers.

Worry about your own village and useless village governors sometimes..


Hahahaha my Biafra brother you are back! How market?

You say a government that has spent over a billion dollars on a project since 2008 and is promising 3km will be ready by 2022 should not account for public funds spent to its own people?

What brand of tramadol do you take? You need to send me the recipe so that we can both get high grin

2 Likes

Re: Lagos Light Rail Project Dragging Too Long — PDP by deomelo: 2:59pm On Aug 16, 2018
freeze001:


Hello? PMB completing bawo? It is a state project and not federal; Lagos has never been a PDP state so what's the connection with PDP on this issue in the first place?



Obviously, I was talking about the uncompleted and abandoned PDP federal projects that PMB is completing.


lol @ what concern the PDP.

Read the topic, look for PDP or just learn how to read and comprehend.
Re: Lagos Light Rail Project Dragging Too Long — PDP by stevenson007: 3:00pm On Aug 16, 2018
hmmmm. they are just delaying the project

Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 3:02pm On Aug 16, 2018
deomelo:


Sadly for you, they don't have to account for anything when it comes to this project because Lagosians are not blind, they see this project and serious work going on everyday, they see workers and engineers building massive rail bridge across the Lagoon everyday on their way to and from work. Lagosians are not stewpid or ignorant like a lot of trolls and irrelevant PDP losers.

Worry about your own village and useless village governors sometimes..

They don't have to account? Because citizens/Lagos 'see' work supposedly going on? So where is the place of transparency that APC campaigned with? If they don't have to account then where is the integrity? What has become of the loans already collected by the State? Is the amount already spent commensurate with the proposed project, time already spent and the yet to be completed outcome? Have u tried comparing figures with other African countries? Would you be this obtuse and bias if it was another part other than APC that was the ruling party in Lagos?
Re: Lagos Light Rail Project Dragging Too Long — PDP by deomelo: 3:02pm On Aug 16, 2018
obi58:



Hahahaha my Biafra brother you are back! How market?

You say a government that has spent over a billion dollars on a project since 2008 and is promising 3km will be ready by 2022 should not account for public funds spent to its own people?

What brand of tramadol do you take? You need to send me the recipe so that we can both get high grin





www.nairaland.com/attachments/5535356_cracks1_jpeg1d491ab30bff0af18de8dcc8ac3d8287


www.nairaland.com/attachments/5535357_cracks3_jpegfe073bd3110e1c3eaf2ee3d550600d8f


www.nairaland.com/attachments/5535358_cracks2_jpegb7c83461acd888f4ec1780c44d5a5ddd

www.nairaland.com/attachments/5535359_cracks_jpeg987e4c42e7eeb9b84d212523344a882d


www.nairaland.com/attachments/5536748_br_jpegc8117c630082344e94d7be0bf2d0edc6




www.nairaland.com/attachments/6515274_fbimg1515257544802_jpeg7ab599e711f29cc8b8b0ec23f36d1372 [/quote]



You ever wonder why Igbos are so troubled and concerned about Lagos and not heartbreaking, deplorable, shameful and life threatening absurdities in their village like the above rubbish...

But they the hypocrite villagers will die over Lagos...




grin grin
Re: Lagos Light Rail Project Dragging Too Long — PDP by Afamed: 3:05pm On Aug 16, 2018
seguno2:


PDP in Lagos for 16 years?
What are you smoking
Advise PDP to complete their National Headquarters first.Its close to 20yrs now still under construction.
Re: Lagos Light Rail Project Dragging Too Long — PDP by freeze001(f): 3:07pm On Aug 16, 2018
That is the role of an opposition party, to ask questions and keep the ruling party on its toes. I am sure you have complained of the filth and poor waste management that has recently begun to overtake the state. If PDP takes the state government to task on it now you will say you don't need their sympathy as of they are not fellow citizens that are affected by the failing of the government. Na so una dey do?
adeoba2008:
Have they ever ruled Lagos? PDP should shut up! We don't need their sympathy.
Re: Lagos Light Rail Project Dragging Too Long — PDP by natznext(m): 3:08pm On Aug 16, 2018
Ambode has really messed up Lagos...
canceling Lawma, starting other massive road and transport projects while abandoning the ones the previous administration started
The Badagry express way should have been completed by now, that blue line should have been completed by now, the Jetties should have been completed by now and the water ways opened up
But nope, Oga decided to privatize Lawma and cut work by half on the projects of the previous administration, then go starting up other masive projects thereby throwing the whole state in disarray, Dude even wanted to start the 4th mainland bridge! When Badagry express way is left unfinished!.

(1) (2) (3) (4) (Reply)

INEC Have Clearly Rigged The Presidential Elections For PDP / 2023 Presidency : I Won’t Reveal My Manifesto For Nigerians Now – Tinubu / Doyin Okupe: Secrets To Winning A Delegate Election In Nigeria

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 53
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.