Ambode Spends Over 100mn Euros On Lagos Light Rail Project - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Ambode Spends Over 100mn Euros On Lagos Light Rail Project (23678 Views)

Tinubu Talking About Lagos Light Rail, BRT Lanes And PPP Models (Throwback) / Obasanjo Criticizes Ambode For Abandoning Lagos Rail Project / Lagos Light Rail And The Problem Of Accountability - Businessday (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Blue3k(m): 4:13pm On Aug 16, 2018
The current administration in Lagos State has spent up to 200 million euros on the first phase of the ongoing light rail project in the state, popularly known as Blue Line.

The Lagos State Commissioner for Transportation, Ladi Lawanson, made the disclosure in an interview with the News Agency of Nigeria (NAN) in Lagos on Thursday.

The Blue Line Light Rail runs from Badagry in the western flank of Lagos to Marina on the Lagos Island.

Mr Lawanson said the administration of Governor Akinwunmi Ambode had spent between 100 million euros and 200 million euros since it inherited the project from the previous administration.

He said that putting finances together was one of the challenges faced by the government in the implementation of the project, which started in 2008.


“The government was mindful not to go into deep borrowing which will become an albatross on the state’s neck.

“That is why we try to look inwards for most of the finances.

“A huge component of the financing is coming from internally-generated revenue and the foreign exchange component was sought through an export credit agency low-interest funding.’’


Mr Lawanson said that putting funds together, providing independent power system and bringing all the technical components of the project together had pushed the completion date of the project to 2022.

“To make the rail system to work, you need uninterrupted power.


“The state government has to provide an independent power system to ensure that the system will run uninterruptedly.

“Bringing all the technical components of the project together is what we are saying. Realistically, it not feasibly to have it before 2022. We have to test-run it.’’

The commissioner said that the government had since signed a memorandum of understanding with a French firm, Alstom, to complete the project after a technical review.

“The administration reached out to the reputable company to take the project from where it was, to completion.

“ Before now, what was done was civil works,’’ the commissioner explained, noting that other components, including signal, electrical and rolling stock had not been covered.

“Alstom is very good in the different aspects of the technologies required to make it a success.’’

On the Red Line aspect of the project, also referred to as phase two, which will run from Marina to Agabado in the northern flank of Lagos, Lawanson said that discussions with potential partners and financiers had commenced.

“Putting a rail project together requires a lot of patience and resourcefulness in terms of financing – where the financing will come from and who we are going to use.


“We just finished the procurement stage of the Blue Line, but we can tell you that we are in discussion with potential partners and financiers for the Red Line.

“However, no entity has been committed.”

He re-stated that the Red Line would be the second stage of the project.

“It is meant to cover the most densely populated parts of Lagos State.

“We expect that it would have the biggest impact in terms of number of people to be conveyed,’’ Mr Lawanson said. (NAN)

Source: https://www.premiumtimesng.com/regional/ssouth-west/280441-ambode-govt-spends-over-100mn-euros-on-lagos-light-rail-project.html
Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by afroniger: 4:19pm On Aug 16, 2018
No be small thing. Financing such an ambitious project in the face of other administrative obligations must be a challenging undertaking. But I believe in this administration's ability to see it to its eventual completion.

17 Likes 3 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by seborrhic: 4:25pm On Aug 16, 2018
Something that took Ethiopia just 4years to complete(2011-2015) at a fraction of the cost Lagos is spending and still to spend.
https://en.m.wikipedia.org/wiki/Addis_Ababa_Light_Rail
By 2022,if it's actually completed by then,it would have taken Lagos state government 14years and probably a billion dollars to complete a light rail from Mile 2 to Marina.
This will surely enter into the Guiness book of records.

116 Likes 7 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by 989900: 4:28pm On Aug 16, 2018
Red line is the real money making machine.

However, this Blue line is taking more than forever . . . reeks of administrative incompetence/malfeasance.

12 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Blue3k(m): 4:31pm On Aug 16, 2018
Ok first power then light rail. After that red line and other colors.

“To make the rail system to work, you need uninterrupted power.

Front page: Lalasticlala

1 Like

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by RockHard: 4:32pm On Aug 16, 2018
seborrhic:
Something that took Ethiopia just 4years to complete(2011-2015) at a fraction of the cost Lagos is spending and still to spend.
https://en.m.wikipedia.org/wiki/Addis_Ababa_Light_Rail
By 2022,if it's actually completed by then,it would have taken Lagos state government 14years and probably a billion dollars to complete a light rail from Mile 2 to Marina. This will surely enter into the Guiness book of records.

Eh.. this has been thrashed here before. They are not the same model. Besides, the Lagos one has met with series of challenges that's affected its timely delivery.

Lagos light rail is elevated for most parts since it runs on swampy land and it's also a 2 way rail.

You'll have to calculate the cost of the pilings, the concrete footings and it's larger size to accommodate the 2 trains at the same time.

It also crosses a water body and it's complete with a super highway that runs alongside it with pedestrian bridges linking the train stations which are also elevated.

The Ethiopian Lightrail runs on land and is a normal railway line with stops alongside it.

Their specifications and topography are miles apart, hence the cost difference and delivery timing. (Credit to ba7man).

71 Likes 6 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by RockHard: 4:36pm On Aug 16, 2018
Lagos Metro Rail Project is not limited to metro rail.

Ethiopia's rail project is just a rail project

Lagos state metro includes 27km metro rail with multiple lines

54 km 10 lane expressway

BRT access

Stations

Overhead bridges

Rail bridge across the Lagos Lagoon

Power station

36 Likes 2 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by RevenGeMission: 4:52pm On Aug 16, 2018
Some people will never see anything GOOD in Ambode or APC

even in BOQs same plan built in different location will never cost the same , let alone an entirely different model which they use as comparism
/ incompetency , some people are beyond redemption

They won't consider the difference in circumstances, even till now we do not have stable power , i am sure the heavy works required to be done has to be done with electricity too


People are just stupid and it bothers me

RockHard:


Eh.. this has been trashed here before. They are not the same model. Besides, the Lagos one has met with series of challenges that's affected its timely delivery.

Lagos light rail is elevated for most parts since it runs on swampy land and it's also a 2 way rail.

You'll have to calculate the cost of the pilings, the concrete footings and it's larger size to accommodate the 2 trains at the same time.

It also crosses a water body and it's complete with a super highway that runs alongside it with pedestrian bridges linking the train stations which are also elevated.

The Ethiopian Lightrail runs on land and is a normal railway line with stops alongside it.

Their specifications and topography are miles apart, hence the cost difference and delivery timing. (Credit to ba7man).

11 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by ba7man(m): 4:54pm On Aug 16, 2018
RockHard:


Eh.. this has been trashed here before. They are not the same model. Besides, the Lagos one has met with series of challenges that's affected its timely delivery.

Lagos light rail is elevated for most parts since it runs on swampy land and it's also a 2 way rail.

You'll have to calculate the cost of the pilings, the concrete footings and it's larger size to accommodate the 2 trains at the same time.

It also crosses a water body and it's complete with a super highway that runs alongside it with pedestrian bridges linking the train stations which are also elevated.

The Ethiopian Lightrail runs on land and is a normal railway line with stops alongside it.

Their specifications and topography are miles apart, hence the cost difference and delivery timing. (Credit to ba7man).
These people simply embrace ignorance and stup1d1ty to justify their political disposition.

20 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by LaudableXX: 8:02pm On Aug 16, 2018
Blue3k:
Ok first power then light rail. After that red line and other colors.

Front page: Lalasticlala

That excuse of lack of power is nansense. angry They can use dedicated microturbines running on natural gas or LPG, to power the rail tracks and the locomotives. undecided

4 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by LaudableXX: 8:06pm On Aug 16, 2018
RockHard:
Eh.. this has been trashed here before. They are not the same model. Besides, the Lagos one has met with series of challenges that's affected its timely delivery.

Lagos light rail is elevated for most parts since it runs on swampy land and it's also a 2 way rail.

You'll have to calculate the cost of the pilings, the concrete footings and it's larger size to accommodate the 2 trains at the same time.

It also crosses a water body and it's complete with a super highway that runs alongside it with pedestrian bridges linking the train stations which are also elevated.

The Ethiopian Lightrail runs on land and is a normal railway line with stops alongside it.

Their specifications and topography are miles apart, hence the cost difference and delivery timing. (Credit to ba7man).
Guy, which other light rail project in the world is as expensive as the one that Lagos has embarked upon? Over 100 million Euro has been spent, and yet it is unfinished. Instead of trying to do a root cause analysis, we are giving excuses of topography and swamps? shocked Haba! If the same topography and swamp existed in another country, the light rail would have been completed and put into operation, since! How many years have they spent building that thing, and yet it is still uncompleted? shocked

34 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by RockHard: 8:11pm On Aug 16, 2018
LaudableXX:

Guy, which other light rail project in the world is as expensive as the one that Lagos has embarked upon? Over 100 million Euro has been spent, and yet it is unfinished. Instead of trying to do a root cause analysis, we are giving excuses of topography and swamps? shocked Haba! If the same topography and swamp existed in another country, the light rail would have been completed and put into operation, since! How many years have they spent building that thing, and yet it is still uncompleted? shocked

Bro, Commissioner Ladi Lawanson don give government explanation. It's then up to you to accept or believe him or not. undecided

15 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by LaudableXX: 8:15pm On Aug 16, 2018
RockHard:
Bro, Commissioner Ladi Lawanson don give government explanation. It's then up to you to accept or believe him or not. undecided
I don't believe his fake excuses.... after spending all dat 100 million euros? Haba! Do they think they are talking to f00ls? shocked

19 Likes 2 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by RockHard: 8:16pm On Aug 16, 2018
LaudableXX:

I don't believe his fake excuses.... after spending all dat 100 million euros? Haba! Do they think they are talking to f00ls? shocked

Ok sir.

8 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by IamAirforce1: 8:32pm On Aug 16, 2018
How much did he get as kickback ?

5 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Lexusgs430: 8:32pm On Aug 16, 2018
Jobs and money for the boys........
Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Malawian(m): 8:32pm On Aug 16, 2018
Chai, very soon, Danfo buses going to the island will be empty all the time.

1 Like 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Naijawebmaster: 8:33pm On Aug 16, 2018
That's a whole lot of money!

Need a reliable and professional website design? Then check my signature No advance payment required.
Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by raymytech2: 8:33pm On Aug 16, 2018
Everyone is currupt For all website design, contact me @raymytech
Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by BruncleZuma: 8:33pm On Aug 16, 2018
RockHard:


Eh.. this has been trashed here before. They are not the same model. Besides, the Lagos one has met with series of challenges that's affected its timely delivery.

Lagos light rail is elevated for most parts since it runs on swampy land and it's also a 2 way rail.

You'll have to calculate the cost of the pilings, the concrete footings and it's larger size to accommodate the 2 trains at the same time.

It also crosses a water body and it's complete with a super highway that runs alongside it with pedestrian bridges linking the train stations which are also elevated.

The Ethiopian Lightrail runs on land and is a normal railway line with stops alongside it.

Their specifications and topography are miles apart, hence the cost difference and delivery timing. (Credit to ba7man).

You've not been to Ethiopia ...not an easy terrain as well.

10 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Realdeals(m): 8:36pm On Aug 16, 2018
You mean 100m Euro has been expended between Iganmu and Marina and the work is yet to be completed? Fashola completed Iganmu to Mile 2 before leaving office.
They should also stop deceiving themselves with the red lane, FG is still struggling to create space for the Lagos-Ibadan rail track in some places like Oshodi and Ikeja

9 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by LaudableXX: 8:42pm On Aug 16, 2018
Realdeals:
You mean 100m Euro has been expended between Iganmu and Marina and the work is yet to be completed? Fashola completed Iganmu to Mile 2 before leaving office.
They should also stop deceiving themselves with the red lane, FG is still struggling to create space for the Lagos-Ibadan rail track in some places like Oshodi and Ikeja
Bros, na so we see am, o! shocked They are now using the excuse of topography and swamp.... mtcheew!

9 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Opinionated: 8:44pm On Aug 16, 2018
So, why is it not working?

1 Like

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Lavendered: 8:46pm On Aug 16, 2018
haba

1 Like

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by omowolewa: 8:47pm On Aug 16, 2018
Great
Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Nobody: 8:48pm On Aug 16, 2018
seborrhic:
Something that took Ethiopia just 4years to complete(2011-2015) at a fraction of the cost Lagos is spending and still to spend.
https://en.m.wikipedia.org/wiki/Addis_Ababa_Light_Rail
By 2022,if it's actually completed by then,it would have taken Lagos state government 14years and probably a billion dollars to complete a light rail from Mile 2 to Marina.
This will surely enter into the Guiness book of records.

Don't mind them that is an avenue of embezzling money

5 Likes 1 Share

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by deomelo: 8:49pm On Aug 16, 2018
LaudableXX:

Guy, which other light rail project in the world is as expensive as the one that Lagos has embarked upon? Over 100 million Euro has been spent, and yet it is unfinished. Instead of trying to do a root cause analysis, we are giving excuses of topography and swamps? shocked Haba! If the same topography and swamp existed in another country, the light rail would have been completed and put into operation, since! How many years have they spent building that thing, and yet it is still uncompleted? shocked



If you are going to talk about cost and wail that the one in Lagos is the most expensive, commonsense dictates that you show us the total cost of the rail projects in other countries, list the total cost o far for Lagos metro and lets compare.


You people need to stop making ignorant claims, it's really annoying..

12 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by ednut1(m): 8:52pm On Aug 16, 2018
What is on ground is not up to 10m euros abeg

7 Likes 2 Shares

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by Nobody: 8:54pm On Aug 16, 2018
Ah! 200 million euros shocked shocked

9 Likes

Re: Ambode Spends Over 100mn Euros On Lagos Light Rail Project by freeze001(f): 8:54pm On Aug 16, 2018
989900:
Red line is the real money making machine.

However, this Blue line is taking more than forever . . . reeks of administrative incompetence/malfeasance.

Obviously there is poor accountability and transparency as far as this project is concerned. Yet see what a supposed youth had to say:
deomelo:

Sadly for you, they don't have to account for anything when it comes to this project because Lagosians are not blind, they see this project and serious work going on everyday, they see workers and engineers building massive rail bridge across the Lagoon everyday on their way to and from work. Lagosians are not stewpid or ignorant like a lot of trolls and irrelevant PDP losers.

Worry about your own village and useless village governors sometimes..

10 Likes

(1) (2) (3) (4) (Reply)

DPO Ibrahim Aliyu Ishaq Kidnapped In Edo / Osinbajo Receive Faure Gnassingbe, Togolese President, His Entourage In Aso Rock / Twitter User Exposes Saraki Links With Anti PMB US Group

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 52
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.