Nairaland Forum / Nairaland / General / Properties / Construction Of A 4bedroom Duplex With A Bq@ Abeokuta (21115 Views)
Construction Of A 4bd/rm Duplex With A Bq @Abeokuta by Dioritestructures / CONSTRUCTION & DESIGN OF 4bedroom Duplex With 2bedroom 2flat Attach IN LAGOS / Construction Of 4bedroom Duplex With 2bedroom 2flat Attach At AIT Road Alagbado (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Hajivince(m): 11:11am On Oct 16, 2018 |
Timtol:My good partner, keep it coming 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 1:53pm On Oct 16, 2018 |
Timtol: So at what depth did you hit clean water? |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:49pm On Oct 16, 2018 |
bixton:Haven't figure that out going down the more because we are yet to be pleased with the "evenly" clean water. Our Target @first is 75metres tho |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 11:07pm On Oct 16, 2018 |
Timtol: Okay, nice. Kindly fill the thread with feedbacks as you proceed. Goodluck 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:14am On Oct 17, 2018 |
bixton:Yeah! Having bad service in this hotel. Trying to that now. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:16am On Oct 17, 2018 |
Sharp Sand 30tonnes. More update on the granite which arrived late @night. Await the cement from Lagos shortly,it had a delay. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:17am On Oct 17, 2018 |
... 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:24am On Oct 17, 2018 |
400blocks needed to raise the side fence. Remains 210blocks to be completed 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:25am On Oct 17, 2018 |
... 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:27am On Oct 17, 2018 |
Excavation started yesterday 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 11:26pm On Oct 17, 2018 |
300bags of cement from Lagos 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 11:52pm On Oct 17, 2018 |
The rebars. We have Y10, Y12, Y16 and Y20. Using TMT rods,Tiger. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 11:58pm On Oct 17, 2018 |
Y16 and Y20 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 12:02am On Oct 18, 2018 |
Timtol: In what area are you using the Y20? 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:04am On Oct 18, 2018 |
We are almost done with the excavation. We will be done with all today by God's grace including the mat bases from the 900wideness,1000wideness,1200wideness and 1400wideness(for the place where we have alot of load) 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:12am On Oct 18, 2018 |
It's a pity for a man who brought his block trying to advertise for his boss and we later haven't recommend his block pack guys to disturb us the following morning (omonile). We were told that never exit in abeokuta again,but all was sort out with no problem but definitely we can't buy from him again. More update today by God's grace as we proceed. Good job my partner HAJIVINCE. Team work. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:14am On Oct 18, 2018 |
bixton:Critical points we have have alot of load. It has a widest base. 1 Like 1 Share |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 12:18am On Oct 18, 2018 |
Timtol: Okay, if you can try and upload the structural plan of the building. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:19am On Oct 18, 2018 |
bixton:You are interested in seeing the critical points? 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 12:20am On Oct 18, 2018 |
Timtol: Yes, bro. 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:20am On Oct 18, 2018 |
We just have apart 2widest critical points at the centre of the building. Then other points of 1200wideness etc 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:21am On Oct 18, 2018 |
bixton:Ok cool 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:24am On Oct 18, 2018 |
bixton: 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:26am On Oct 18, 2018 |
bixton:Hope you can see those two points? I know you are a structural engineer so you will understand those points as well. Thumbs! 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Hajivince(m): 6:46am On Oct 18, 2018 |
[quote author=Timtol post=72185042][/quote] Show him the first floor layout for the structural works & show him the Beam details, he will be able to read it that way. The foundation layout won't show him what he needed My G. I will show you on site today. 2 Likes |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:27am On Oct 19, 2018 |
Pad bases Different wideness of the pad bases.
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:34am On Oct 19, 2018 |
We breeds qaulity and accuracy 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:38am On Oct 19, 2018 |
This is the final clean water gotten below a depth of 100metres. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:44am On Oct 19, 2018 |
Damp proof membrane 2 Likes
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:46am On Oct 19, 2018 |
Mat getting set with the columns. 1 Like
|
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:48am On Oct 19, 2018 |
More update... 1 Like |
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 2:49am On Oct 19, 2018 |
Timtol:This is our depth.
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)
What Can One Build On A 30FT X 120ft (half A Plot) / Estimate For Decking / ANOTHER REASON TO INVEST IN IBEJU LEKKI
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 21 |