Re: The Anambra Modern Duplex Construction by spyder880(m): 6:03am On Nov 12, 2019 |
Then we started to import filling sand into this site......... 1 Like
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:06am On Nov 12, 2019 |
Filling this foundation is in progress........ 1 Like
|
Re: The Anambra Modern Duplex Construction by Tolzeal(m): 6:37pm On Nov 12, 2019 |
Oga spyder880. I present oo. Weldone on great jobs you've been doing over years. I'm learning much reading through your threads. 2 Likes |
Re: The Anambra Modern Duplex Construction by spyder880(m): 8:24pm On Nov 12, 2019 |
Tolzeal: Welcome bro. We will continue to do our best to improve the building industry from where we met it. Thanks for the encouragement. 3 Likes |
Re: The Anambra Modern Duplex Construction by Tolzeal(m): 9:26pm On Nov 12, 2019 |
spyder880: Please I have a proposal for you. If that would be okay. I'm trying to send mail with NL mailing system. Thank you for you kind work |
Re: The Anambra Modern Duplex Construction by spyder880(m): 9:52pm On Nov 12, 2019 |
Tolzeal: You can also send it on my WhatsApp line 080 333 50 750. Thanks. 1 Like |
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:16pm On Nov 13, 2019 |
Plumbing materials arrives for this foundation..... 3 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:18pm On Nov 13, 2019 |
We have filled up the whole foundation with sand...... 2 Likes
|
Re: The Anambra Modern Duplex Construction by Umarzy(m): 6:31pm On Nov 13, 2019 |
spyder880: Nice work . I have observed that Hardcore is not basically used in foundations, of which is a perequisite. Why is that? |
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:35pm On Nov 13, 2019 |
Umarzy: Hardcore is used only where its necessary. Works like filling stations or areas where heavy use is expected must be planned to have the materials adequate for the job. In residential buildings, the most important thing is adequate compaction to prevent soil compression and sinking in the future. 5 Likes 1 Share |
Re: The Anambra Modern Duplex Construction by Umarzy(m): 7:17pm On Nov 13, 2019 |
spyder880: Good. Thanks 1 Like |
Re: The Anambra Modern Duplex Construction by spyder880(m): 5:51pm On Nov 14, 2019 |
More pictures of the filled foundation........ 3 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 5:54pm On Nov 14, 2019 |
We have brought in chippings and sand in readiness for the DPC cast of this house....... 3 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 5:57pm On Nov 14, 2019 |
There was some very heavy rainfall yesterday, and some of the parts of the foundation filled with laterite sand has started sinking on it's own. 4 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 5:59pm On Nov 14, 2019 |
Upon all the rains, the portions filled with sharp sand refused to sink in. ......... 4 Likes
|
Re: The Anambra Modern Duplex Construction by Valto(m): 7:49pm On Nov 14, 2019 |
spyder880:wow. i am learning something. welldone oga tigerken! 2 Likes |
Re: The Anambra Modern Duplex Construction by jp130(m): 8:03pm On Nov 14, 2019 |
Gud eveni sir, plz i av a question if u dnt mind. Wat is d width of d foundation or better still dimension in meters |
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:17am On Nov 15, 2019 |
jp130: The width of the building is about 8.6 metres. 1 Like |
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:19am On Nov 15, 2019 |
I bough a new roll of hose, and some meters of flexible hose to be used in pouring water into this foundation today. 3 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 7:02am On Nov 16, 2019 |
Preparations for concrete cast of the DPC. 2 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:28pm On Nov 16, 2019 |
Soil compaction of the sand we filled in this foundation. We are doing this with a mechanised compactor. 3 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:30pm On Nov 16, 2019 |
Thereafter, we got ready for the concrete cast........ 2 Likes
|
Re: The Anambra Modern Duplex Construction by spyder880(m): 6:39pm On Nov 16, 2019 |
More pictures of the ready areas........ 3 Likes
|
Re: The Anambra Modern Duplex Construction by Umarzy(m): 9:49am On Nov 17, 2019 |
spyder880: Sir, what about the Damp Proof Membrane (DPM)? |
Re: The Anambra Modern Duplex Construction by spyder880(m): 12:09pm On Nov 17, 2019 |
Umarzy: Due to the elevated nature of this foundation, damp will not be a problem here. We also used sharp filling sand and did a foundation beam. We decided to leave out the membrane. 1 Like |
Re: The Anambra Modern Duplex Construction by spyder880(m): 12:10pm On Nov 17, 2019 |
More work from this site yesterday.......... 3 Likes
|
Re: The Anambra Modern Duplex Construction by Focusmind: 12:52pm On Nov 17, 2019 |
I didn't see iron rod criss crossing the surface before pouring the concrete mixture. My Engineer laid a thick black nylon on the compacted sand and criss crossed the length and breath of the surface with 12mm iron before pouring the concrete mix. Did he do the right thing as it was very expensive for me. I |
Re: The Anambra Modern Duplex Construction by Umarzy(m): 12:59pm On Nov 17, 2019 |
spyder880: Okay. Thanks |
Re: The Anambra Modern Duplex Construction by spyder880(m): 1:08pm On Nov 17, 2019 |
Focusmind: He must have a good reason for doing that. Maybe your environment is very different. Where's your site? 2 Likes |
Re: The Anambra Modern Duplex Construction by spyder880(m): 1:33pm On Nov 17, 2019 |
These steps are planned to descend lower than the foundation level, this will lead into the visitor's toilet which is planned to be under the main stairs. 5 Likes
|
Re: The Anambra Modern Duplex Construction by Timtol(m): 1:33pm On Nov 17, 2019 |
Hmmm |
Re: The Anambra Modern Duplex Construction by EgunMogaji2: 1:42pm On Nov 17, 2019 |
spyder880: Next house I build will follow the principle not bringing in too much if any soil from outside. Good progress Sir. I can't wait till you start laying blocks. With this design you're giving our Chief Skimanski a run for his money. 3 Likes 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (Reply)
Lagos Issues Seven-day Ultimatum To Illegal Structure Owners In Lekki, Other Are / Safety Tips When Renting A Property In Lagos| Cotenant.ng / How Do You Manage To Pay Rent In This Bad Economy?
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |