Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,721 members, 7,813,381 topics. Date: Tuesday, 30 April 2024 at 11:34 AM

Third Mainland Bridge To Be Opened February - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / Third Mainland Bridge To Be Opened February (16691 Views)

Ijora Olopa Bridge To Be Closed Immediately - FG / Second Niger Bridge Now 95% Complete, To Be Opened December 2022 (video) / Third Mainland Bridge To Be Shut 12am Thursday - Details (2) (3) (4)

(1) (2) (Reply) (Go Down)

Third Mainland Bridge To Be Opened February by dre11(m): 10:11am On Jan 02, 2021
Lagos State Commissioner for Transportation, Frederic Oladeinde, has said the Third Mainland Bridge would be opened fully to vehicular traffic in February.

Oladeinde said this on Friday in an exclusive interview with our correspondent, noting that the rehabilitation of the bridge had to be pushed from January 2021 to February due to the effect of the #EndSARS protests.

He said, “It was supposed to be January but it is now February 2021. It has been moved by a month. The first phase is finished, the second phase has started.”

The Federal Government had announced that the bridge would be closed for six months for maintenance works. Construction was scheduled to be done in two phases, three months on each carriageway.

Speaking on the outlook of transportation for Lagos State, the commissioner said the state was trying to integrate all transport modes into a card that can be utilised by residents.

He said, “The government is going ahead with the rail. We are still constructing the blue line and we have reached an advanced stage with the red line which would soon commence.“

He added, “We are ramping up water transport, we are connecting it with the Bus Reform, making sure that all our transport modes are integrated. We are extending the common ticketing system which we currently use on the Bus Rapid Transit System to the waterways and when the rail comes on board, we will extend it to the rail as well.

“Basically, people will have a card that can be used over various modes of transport.”

Oladeinde sought private sector investment to boost water transport, adding that on their part, plans had been made to expand the Lagos Ferry Services Company fleet.

He said, “We are encouraging the private sector to run water transportation. We are increasing LagFerry’s fleet from 12 to 18 and we are also in a constant dialogue with the private sector who are trying to buy more boats.

“For example, we have about 307 boats plying our waterways, including the private sector. We want to increase it by another 50.”

Regarding the gridlock situation, Oladeinde said the state government had begun to resolve all bottlenecks responsible for gridlocks in the state.

So far, he said, six points had been identified and were currently being worked on.
https://punchng.com/third-mainland-bridge-to-be-opened-february/

1 Like

Re: Third Mainland Bridge To Be Opened February by Luckydubby7(m): 12:47pm On Jan 02, 2021
And also push from February to December 2021.
Unreliable government.

11 Likes

Re: Third Mainland Bridge To Be Opened February by Legithustle: 12:47pm On Jan 02, 2021
champion wink
Re: Third Mainland Bridge To Be Opened February by RexTramadol1: 12:47pm On Jan 02, 2021
Not a bad one!
Re: Third Mainland Bridge To Be Opened February by SadiqBabaSani: 12:47pm On Jan 02, 2021
Smoke

1 Like

Re: Third Mainland Bridge To Be Opened February by DeBestGraphix2: 12:48pm On Jan 02, 2021
Okay good
Re: Third Mainland Bridge To Be Opened February by 44Bulldog(m): 12:48pm On Jan 02, 2021
Ok
Re: Third Mainland Bridge To Be Opened February by ohosi4real(m): 12:48pm On Jan 02, 2021
Congratulations to lagosian
Re: Third Mainland Bridge To Be Opened February by Jaqenhghar: 12:48pm On Jan 02, 2021
3rd mainland bridge has become the new cash cow. Every 3 months it is undergoing repair

12 Likes

Re: Third Mainland Bridge To Be Opened February by 123Map(m): 12:48pm On Jan 02, 2021
Same to you grin
Re: Third Mainland Bridge To Be Opened February by taiwoowiat: 12:48pm On Jan 02, 2021
Good.
Re: Third Mainland Bridge To Be Opened February by chukwuibuipob: 12:49pm On Jan 02, 2021
sad and closed shop again for another expensive repair in August.May God help us in dis country

1 Like

Re: Third Mainland Bridge To Be Opened February by handsomeyinka(m): 12:49pm On Jan 02, 2021
After the third mainland bridge completion,can the government help us repair the Stamford bridge for chelsea?

Sorry Chelsea fans ahead of tomorrow's clash with mancity...

In Gunners I trust..UP ARSENAL.

RAISE YOUR HANDS IF YOU BELIEVE ARSENAL IS BETTER THA CHEALSEA THIS SEASON.

2 Likes

Re: Third Mainland Bridge To Be Opened February by Orubebe01: 12:49pm On Jan 02, 2021
.
Re: Third Mainland Bridge To Be Opened February by Patosky4U: 12:49pm On Jan 02, 2021
Okay
Re: Third Mainland Bridge To Be Opened February by Abbeyme: 12:49pm On Jan 02, 2021
At last
Re: Third Mainland Bridge To Be Opened February by Kingjay007: 12:50pm On Jan 02, 2021
Bullocks
Re: Third Mainland Bridge To Be Opened February by iamnoak(m): 12:50pm On Jan 02, 2021
Okay oh
Re: Third Mainland Bridge To Be Opened February by Nobody: 12:51pm On Jan 02, 2021
Wow! Nice job.

At least the bouncing and shaking problem will reduce a bit.

1 Like

Re: Third Mainland Bridge To Be Opened February by Orire001: 12:51pm On Jan 02, 2021
Ok










I still sell affordable laptops with free delivery and pay on delivery.

Details on my signature.
Re: Third Mainland Bridge To Be Opened February by DesignValue7: 12:52pm On Jan 02, 2021
Okay
Re: Third Mainland Bridge To Be Opened February by AmbFmk: 12:54pm On Jan 02, 2021
Thanks to God.


Mind you, you can
Participate in websites and Apps Userbility testing. And earn side cash.

A review of 7 best websites that are currently recruiting testers.
Plus 3 top websites where you can outsource Userbility job.

������
https://www.wealthonnet.com/2020/12/top-7-websites-that-will-pay-you-for.html
Re: Third Mainland Bridge To Be Opened February by toskine: 12:55pm On Jan 02, 2021
Why delaying on this repair works now, can't we set a timeline and meet up for just once now, the hardship we are experiencing going to work this day is too much oo

3 Likes

Re: Third Mainland Bridge To Be Opened February by Juliet60: 12:56pm On Jan 02, 2021
Goodnews

(1) (2) (Reply)

It Is Impossible To Save $30 (₦9,540) Daily In Canada / Fadeyi Bridge: Lagos State Declares Two-night Movement Restriction On Ikorodu Rd / LASTMA Officer Spotted Dancing While Controlling Traffic (Video, Pictures)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.