Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 9:00am On Jan 18, 2017 |
abouzaid: received, I'll get back to you if it goes through. Ok no problem.....best of luck |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 8:10am On Jan 17, 2017 |
allhavesinned: Ok please leave your whatsapp number 08064059967.............you can whatsapp me on that,thanks |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 10:57pm On Jan 16, 2017 |
abouzaid: send whatever you can, I'm not sure the intended client can afford that level of finishing, i want to prepare like two or three different estimates for him based on different levels of finishing. sent....pls do let me know if you received |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 5:05pm On Jan 16, 2017 |
allhavesinned: Can u do such in owerri? very well sir.......i worked in owerri 2years ago.supervising umuapu-etekuru road leading to egbema. |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 3:52pm On Jan 16, 2017 |
ak22: sir please I need some help of amendment on that drawing . plan can you help with just 5 bedrooms bungalow floor plan not duplex. because this of this recession time please but beautiful and not too big structure and the one of the room will separate from other four room for visitors no problem.....let me check my file and select for you,but it might not be soft copy,i will take i good shot nd send to you |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 3:26pm On Jan 16, 2017 |
Adegbulugbe: yes we can,it very possible.....But will require some question based on interior...as for structural that must be perfectly done without economizing.but other can be economize and it will look good and perfect do you want to start soon or you just want to have it in mind?i |
Properties › Re: Fairly Used Bottle Water N Sachet Machines For Sale In Lagos by Adegbulugbe(m): 7:40am On Jan 15, 2017 |
udemejacob: I have sent some pix n quotation to ur email Ok thanks..will check it out |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 7:38am On Jan 15, 2017 |
Another project comment by client.Mr Frances Dike
|
Investment › Re: The Secret Of MMM's Comeback by Adegbulugbe(m): 11:28am On Jan 14, 2017 |
johnreh: ppl will still go on insulting OP. 11am and i cant still GH. mmm just came back to crash big time!!! i just got help now but i'm not yet merged |
|
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 8:33pm On Jan 13, 2017 |
abouzaid: send whatever you can, I'm not sure the intended client can afford that level of finishing, i want to prepare like two or three different estimates for him based on different levels of finishing. ok |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 8:09pm On Jan 13, 2017 |
abouzaid: can you give me the floor plan of the5bedroom duplex with a little breakdown of the cost of fittings used? send it to greenermodels@gmail.com.i hope you don't mind working as a subcontractor? No problem...but what part of the fittings are you referring to?is it the toilet fittings<or the electrical or the Kitchens.pls specify so i will know what to send to your mail,thanks. |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 5:49pm On Jan 13, 2017 |
ibukunmak: please will like to ask if you can build a structure of 5 bedrooms similar to this for between 20m - 35m. yes we can,it very possible.....But will require some question based on interior...as for structural that must be perfectly done without economizing.but other can be economize and it will look good and perfect |
Properties › Re: Another 5bedroom Duplex Averagly Completed At Rukpokwu SAS Road Port Harcourt by Adegbulugbe(op): 6:45am On Jan 13, 2017 |
contact us for more pictures and inquiry at paraconeng@yahoo.com +2348064059967 |
Car Talk › Re: Car Talk Chat Room by Adegbulugbe(m): 9:04am On Jan 12, 2017 |
|
Properties › Re: Fairly Used Bottle Water N Sachet Machines For Sale In Lagos by Adegbulugbe(m): 8:51am On Jan 12, 2017 |
udemejacob: I deal with industrial fairly used n neat machines for sachet n bottle water, they r not up to a year, all my machines are in good condition n in good n neat shape. contact or WhatsApp if u r interested: 08173428595. List of machines available. 1- monobloc 12:12:5 and 8:8:3 2- 2 cavity pet blowing machine 3 - shrink wrapping machine 4- pure water machine 5 Reverse Osmosis ( RO ) etc................ Pls can you send some picture of the bottle water and the sarchet water machine to my email...paraconeng@yahoo.com.thanks |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 1:21pm On Jan 11, 2017 |
Thanks to a niaralander for patronizing my work....a new project awarded...info update soon.......call for your perfect structure and good finishing @Paradox civil Engineering........08064059967..........paraconeng@yahoo.com.....THE BEST WE DELIVERED |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adegbulugbe(m): 6:47pm On Jan 10, 2017 |
abdulwastecx: You mean for the soil stabilization? There is no too much difference between the different brand of ordinary Portland cement in Nigeria. The major reason while dangote is preferred is the fact that it can't be adulterated easily.
You can as well read up on the '' physico-chemical classification of Nigeria cement '' Thanks bro |
Properties › Re: Urgent Quote Needed For House Build by Adegbulugbe(m): 6:33pm On Jan 10, 2017 |
BOSSGUY1: coments in red 1. What grade of tiles material would you prefer for your finishes, Spanish, Italian or china? China
2. What quality of doors would you prefer? specify if grade A/B Grade A 3. what quality of windows would you prefer for your house? specify grade A/B grade A 4. What quality of electrical fittings would you prefer for your house? specify grade A/B grade A 5. What quality of toilet wares would you prefer? grad A/B grade A 6. Would you want all your walls to be POP screed? no 7.. What type of cabinets would you prefer? specify grade A/B this is not relevant 8. What type of wardrobe materials would you prefer? specify grade A/B this is not relevant 9. Would you want all your ceilings to be full POP and cunning all through? no 10. What type of roof materials would you prefer? specify either Long span Aluminum/step stone coat (Gerald) long span aluminium 11. would you prefer your roof to have parapet facials? No parapet for this house 12. Would you want your house work bill of quantities to include external works i.e fence and gate, green areas, septic tank& soak-away pit, bore holes, generator house and floor pavings? (specify for floor if concrete paving asphalt or interlocking stones) no don’t include, this quote is for house structure only and finishes including drainage 13. would you also want the contractor to include in our Bill for the supply of generator set? No 14. Finally, have you a ready working drawing that define all you posted above? Not completed yet
Please you may need to give us feed back on all those questions to determine what your budget should be. And not only that if item no 14 is not yet in place, you need one first. If you do not have item 14 ready, we can produce one for you without wasting time. we assure you that we are going to work with your information given and polish it with our modern day style that you will surely fall in love with. All you need to do is just to let us have the photocopy of your survey plan so as to plant your structure well and manage your space for you nicely. And if it happens that your survey is not yet in place, lets handle it, we are good to go.
Please note and this is for all potential quotes, at this point in time until drawing plans are complete I need to be provided with intelligent estimate, this could come from previous experience of building 4bed houses in Lagos, and current cost of materials. I understand accuracy is compromised without full drawing plans but take my home as being no bigger than the 4-5 bed detached we conventionally see in the Lagos area.
I need to know will I be spending 15M-20M 20M-25M 30M-35M 40M-45M 45M+ The quote is for the house structurally only from foundation to roofing painted and decorated with finishes. Please submit your quote here or privately to my email Lucky@lemonskip.com
Thank you,
Engr. Dare For: Abraham's Well Consult & Construction Ltd. with all this requirement,i will assure you that you will spend close to 40m based on using china tiles and not all the walls are screeded but you must have a good structure,good kitchen set,good quality wardrobe materials,the internal doors can still be average quality,but all the external doors must be best quality.i have a building similar to this your taste im building presently which im at painting stage now.you can mail me at paraconeng@yahoo.com to send you some samples and also you can send your survey plan then i will design the best for you.Thanks |
Properties › Re: Another 5bedroom Duplex Averagly Completed At Rukpokwu SAS Road Port Harcourt by Adegbulugbe(op): 7:29am On Jan 10, 2017 |
Picture of the structural work
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adegbulugbe(m): 9:50pm On Jan 09, 2017 |
I supervised a road construction in owerri the cement specification approved for the soil cement was Dangote cement but i figured they brought in Unicef or Unicem whatever inplace of the approved one,pls house what are the quality comparison in this cement cause i want to stop them and instruct to use Dangote |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adegbulugbe(m): 9:43pm On Jan 09, 2017 |
spyder880: Yes. Superset is preferred by most block makers. Another cement I see them buy mostly is Ibeto and BUA. good to meet you guys here...........yes ibeto is good in block making buy you hardly know if the block is cement sufficient or not in your physical look cause it makes mix black alot |
Properties › Re: Another 5bedroom Duplex Averagly Completed At Rukpokwu SAS Road Port Harcourt by Adegbulugbe(op): 8:14pm On Jan 09, 2017 |
More pictures
|
Properties › Another 5bedroom Duplex Averagly Completed At Rukpokwu SAS Road Port Harcourt by Adegbulugbe(op): 8:13pm On Jan 09, 2017 |
Structure:5bedroom duplex
Location:Rukpokwu SAS port harcourt
Supervisor: Engr Andy
Client:Mr Keme Bomo
|
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 6:56pm On Jan 09, 2017 |
ak22: nicholas.globalconcepts@yahoo.com sent......pls do let me know Asap you got it. |
|
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 8:31am On Jan 08, 2017 |
@ak22......plus can you resend your mail or give me a yahoo mail....this is giving issue to send you.. |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 10:01pm On Jan 07, 2017 |
ak22: nice job bro . please can you share the plan draw with me please akiniyi22@gmail.com thanks no problem...I will do that. |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 10:00pm On Jan 07, 2017 |
bugmenot:
Nice job @adegbulugbe.
How much did you get the glass shower cubicle for? Is it real glass or plastic?
yes it a real glass..not plastic at the rate of #125k it came with plastic base but I decided to firm a tiled base then place it on it cos the plastic base don't last |
Properties › Re: How Do I Build A Septic Tank / Soakaway In This Situation? (pic Attached) by Adegbulugbe(m): 5:31pm On Jan 07, 2017 |
Pesuzok: Thank you for your contribution, but my other concern is how to effectively utilize the size of the septic that would be done. The piping is already indicating that I cannot use more that half of the septic volume when done what you mean is that the final slope of the waste drain get to almost half of the septic tank guess .if that is what you mean,you can go down small cos that is more advisable than raising your pipes again exposed round the building except you i can only give you an option of doing something like pavement revolve round the pipes. |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 5:23pm On Jan 07, 2017 |
topsy23: Good work and welcome boss Thanks bro @ topsy |
Properties › Re: Construction Of 5bedroom Standard Duplex In Port Harcourt Complete Project by Adegbulugbe(op): 5:18pm On Jan 07, 2017 |
mufutau55: Lovely wardrobes. Nice building too. We would have love to see more of the building constructions not just the finished project.
Hajji M. here are the pictures from the foundation to DPC and also some of the block work to decking level
|