Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:54pm On May 25, 2016 |
Picture showing the main Lounge almost completed with the Glass blocks, Burglaries, granite floor Tiles, etc installed...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:49pm On May 25, 2016 |
Picture showing Staircase windows...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:46pm On May 25, 2016 |
Picture showing Staircase almost completed...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:45pm On May 25, 2016 |
Picture showing granite floor tiling works almost completed in Family Lounge...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:42pm On May 25, 2016 |
Picture showing one of the guest bedrooms...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:40pm On May 25, 2016 |
Picture showing Kitchen...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:39pm On May 25, 2016 |
Picture showing the Master's Bedroom walk-in closet...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:37pm On May 25, 2016 |
Picture showing external wall tiling works...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:35pm On May 25, 2016 |
Picture showing yet to be completed External Wall Tiles...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:33pm On May 25, 2016*. Modified: 9:09am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:32pm On May 25, 2016 |
Picture showing Master's Bathroom...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:30pm On May 25, 2016*. Modified: 9:08am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:28pm On May 25, 2016 |
Picture showing Dining Area...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:26pm On May 25, 2016*. Modified: 9:08am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:24pm On May 25, 2016 |
Picture showing on going tiling works on the floor of the kitchen
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:22pm On May 25, 2016*. Modified: 9:08am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:18pm On May 25, 2016 |
Pictures also showing completed POP Ceiling and screeding works with ready to be installed Burglaries...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:15pm On May 25, 2016*. Modified: 9:07am On Apr 17, 2017 |
Pictures showing completed POP Ceiling works, flush doors and Burglaries to be installed... It also shows the granite tiled floor of the main Lounge... http://www.sharpedgedesignltd.com/
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 2:10pm On May 25, 2016 |
Pictures showing Completed POP Ceiling and wall screeding works, electrical cabling and on going Furniture works... twinskenny: well engr..is there a chance for cctv or dstv installation for the client,? Thanks Good day to you, Well we did not make any provision for CCTV as it was not required by the client but there are adequate provisions for DSTV (all conduit)... as a matter of fact, one of the latter pictures i will eventually upload shows the already installed DSTV dish. Thanks for your question.
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 1:35pm On May 25, 2016*. Modified: 9:07am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 1:34pm On May 25, 2016*. Modified: 9:07am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 12:19pm On May 25, 2016 |
Pictures showing Tiling works in Progress...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 12:11pm On May 25, 2016*. Modified: 9:07am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 10:12pm On May 24, 2016 |
Pictures showing Building after External Plastering...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 10:00pm On May 24, 2016 |
Pictures showing the Internal and External Plastering...
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:55am On May 24, 2016*. Modified: 9:06am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:47am On May 24, 2016*. Modified: 9:06am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 9:41am On May 24, 2016*. Modified: 9:06am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 12:02am On May 24, 2016 |
Pictures showing Concrete Fascia (Parapet)
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 11:57pm On May 23, 2016*. Modified: 9:05am On Apr 17, 2017 |
|
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 11:48pm On May 23, 2016 |
phocuyelu: Thanks for the update but I think most people are more interested in the cost breakdown/estimates and maybe basic challenges and lessons from the project. Like you rightly said, each project with its peculiarity but just posting pictures showing various levels of construction is common here already. Your advice is well noted and really appreciated; will definitely work on it and probably come up with innovative ways of sharing cost estimates as it were... Thanks a lot |
Properties › Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(op): 10:46pm On May 23, 2016 |
mavverick: Nice work OP I think the following would have been useful:
* which area of Lekki ? * Some info on the terrain ? * Some info on the challenges faced and your solution ? * Cost/Estimate information. * Kind/height of foundation, was it dug or the blinding done at the ground level you met.
Thanks. Thanks for your questions... will respond to each one of them. The building is at Ikota... infact it's in Megamound Estate. Like is shown in the very first set of pics i shared, the terrain is largely swampy The major challenge faced on this project was the terrain because in spite of the swampy nature of the soil, we still had to dig to get to relatively solid ground upon which the foundation was laid. This challenge was however totally surmounted once we were done with the foundation. The other alternative would have been for us to sand fill and wait for some 2 years for the soil to compact well... unfortunately, our client did not have the luxury of time. Other challenges include the budget i.e we were constrained for cash from the start to the finish... i guess this is common with most clients. As for the cost estimate, i would rather not go into that now as every project is perculiar to itself... whatever estimates i put here might discourage some prospective client but that info you can get if u call or send a private msg to me. The height of the foundation for this project is 1.8metres and we dug to hit solid ground... Thanks a million for your questions... really appreciate u |