chukwuka12:
Evening House,

Please I would like to know the difference/advantage/disadvantages btw using cement trolley and using tiles....
Tyrolean and tiles are two different classes of finishes. Tyrolean is best used as external finishing, while tiles can used both external and internal.

Quality Tyrolean can be more expensive(depends on type of tiles) but its more durable requires little maintainance.

Tyrolean rocks any season but tiles is bound to weqr
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 7:19pm On Nov 04, 2019
ak22:
Hello house I need quotation for this swimming pool Size 4m /3m and 4ft shallow to 2 ft ?

akiniyi22@gmail.com
Where is the site located?
PropertiesRe: Construction Diary Of Precast Septic Tank And Underground Water Tank, Lagos by beamNIGERIA(op): 11:56am On Oct 27, 2019
The formwork both internal and external requires adequate strut, the consequences of this as a contractor is fatal if formwork fails while pouring concrete.

The concrete has to be grade 30, because the structure is below the ground mix with the a very good sealant (penetron was used here) and well vibrated.

Then after deforming the formwork, the sepetic tank will be plastered in and out with sealant in mix.

PropertiesRe: Construction Diary Of Precast Septic Tank And Underground Water Tank, Lagos by beamNIGERIA(op): 11:32am On Oct 27, 2019
To construction a sepetc tank ( 3m height) in this environment, it has to be precast i.e cast and sink. Water level is relatively high, 3 feet excavation below the ground, you have to be prepared to battle water to achieve task.

The methodology is to cast walls of the septic tank to the required height on the ground surface without the floor, only starter rebars for floor.

Most times, its ideal to have the internal formwork in place and place the rebar around then place external formwork. The challenge with this procedure is the placing of reinforcement for the floor, we want a monolithic structure and avoid voids. For this project we employed both techniques to be double sure we achieving a water tight and monolithic structure.

The internal formwork was formed then after the rebars and water stopper are placed the fromwork was carefully deformed. The floor starter rebar was placed then internal and external formwork replaced with a 2x4 wood placed on the internal (at the buttom)to form groove.

PropertiesConstruction Diary Of Precast Septic Tank And Underground Water Tank, Lagos by beamNIGERIA(op): 10:58am On Oct 27, 2019
Brick et al a multi-faceted indigenous construction company, establishes strong expertise providing quality construction and environmental solutions. Our team comprises of qualified Built environment practitioners.

Just as the year 2019 gradually winds down, it goes down in our annals as a company challenging and eventful, we will like to share our construction experience on septic tank in a water logged (reclaimed land) area of Lagos state, Banana Island Estate to be precise.


Banana Island estate operates a central sewage system but for emergency/ system breakdown/ maintenance property owners are encouraged have back up sewage system in thier facility. Each facility has a sewer collection point which empties into the estate sewer mains.

We are not able to secure permission to upload structural and mechanical drawings as they classified inputs of the Services and Structural Engineers.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 6:11pm On Oct 25, 2019
diordaves:
So:
Frame
Skirting
Door
Lock
Vanishing
All round Labour

N40,000
Skirting? You mean architrave
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 5:59pm On Oct 24, 2019
Tammynator:
Builders and professionals. Small 3 bedroom flat that I want to build. See the quotation that was given to me. Are the prices okay? Though, I will have to now explore other builders. I have been dealing solely with this particular guy because, he helped me in acquiring the land.
70,000 for excavations for a 3 bedroom. Ordinarily, I will consider that outrageous but labour cost is factored by location.

You shouldn't be needing more that 30tons of granite to complete your structure and there are two different rates against granite.

Please provide your best email address for correspondence.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 5:30pm On Oct 24, 2019
mimini:
Good day house. Please this is so important. What causes this rising dampness on walls. I have noticed it in many houses in Abuja. What can be done to rectify this problem. it flakes off the cement from the wall. Gives dark patches and swellings on screeded walls. I cannot even use wall papers cause it will soak the paper. I paint the wall after every raining season.
Mind you, the house I am living in now is a new house and german floor waterproof nylon was used to cover the whole floor before concrete was poured. Water proof cement was also used to screed the wall.

Please any solution because it is really embarrassing.
Thank you.
Amongst many reasons that cause dampness on walls, will like you to note that high proportion of damp problems in buildings are as a result of rain penetration (non dpc related) and capillary action/rising damp (dpc related).

Preferring solutions, I advise physical inspection by an expert (depending on extent of defects), you don't want to create more mess or waste resources while defects persist.

Rain penetration/water seeping from the outer surface; due to drive rain most times(after hours of down pour) you have external walls socked and depending on type of soft sand used for plastering (usually of high salt content) the wall surface absorbs the water, gradually increase in size, travel through the brick and form dampness on the internal surface.
Water proof the surface with bituminous coatings and plaster (mixture of sharp and soft sand) with very good sealant e.g penetron or sikalatex and provide for effective slope to drain off rainwater.
As well, Plaster with coarse and fine sand.

Water rising from ground by capillary action despite having DPC; There is possibility that DPC is faulty or bad installation.
I advise you pave the surface abutting the building to prevent rain water seeping into the wall.
Or if considering interlock paving, make sure the floor has a damp proof course (DPC) which arrests the rising water.

If I haven't been able to mention any likely cause relative to your building, please sort for physical inspection by a water proofing contractor.
PropertiesRe: Very Urgent by beamNIGERIA: 11:33pm On Oct 23, 2019
erico2k2:
Never used stone dust, but why? is it cheaper than sharp sand?
Why? Note because its cheaper but because its yield higher compressive strength compared to just sharp sand.

Such blocks are better load bearing
PropertiesRe: Very Urgent by beamNIGERIA: 11:30pm On Oct 23, 2019
ak22:
No is not
Actually stone dust are cheaper to sharp sand in area closer to quarry than originally sharp sand source...place like ijebu ode
PropertiesRe: Very Urgent by beamNIGERIA: 11:26pm On Oct 23, 2019
ak22:
Please everyone in the house . please how many concrete block can 30 tons of Stone dust can produce ? Syder880 , erico2k2, beamNIGERIA,segzy14, Hajji muffutau55,EgunMogaji
Did reply on the other platform, hope its found useful.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 11:13pm On Oct 23, 2019
ak22:
Please everyone in the house . please how many concrete block can 30 tons of Stone dust can produce ? Syder880 , erico2k2, beamNIGERIA,segzy14, Hajji muffutau55,EgunMogaji
Using,
1 bag of cement to produce 35 pieces
And volume of Cement to aggregates 1:6
30 ton of stone dust will mould 2700 - 3000 pieces of 9" blocks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 2:10pm On Oct 22, 2019
erico2k2:
You still do not get it, you are talking from assumption.I do not need to be a certified Engineer to build a new machine and train more Engineers to maintain it.If you check from history the great inventors where never certified Engineers.
Now you did make some points that I found valid though.But I maintian the word you was looking for is Certified Engineer.The reason why you would need a certified Engineer would be Jobs that required certification, or for legal reasons. ie Insurance etc or government legislature..
I am a Uk certified Enginer,Im a fluid Engineer so I deal with Flued Mechanics.I carry out test and certification with major fleets on thier hydrolic systems.At teh end I put a sticker o n them to certify them legal to operate.Now if these Hydrolic systems goes faulty you do not need me to come fix it,the guys who fix them are not certified Engineers like me,But they still are Engineers.I dont know if this is clear enough.
Thoses guys are technicians.
The word Engineer is a protected Title, the phrase Certified Engineer addresses quackery and imposters.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA:
erico2k2:
You are extremely wrong there, [b]anyone who can Engineer anything perfect is an Engineer[b], however, I think the word you were looking for is A QUALIFIED ENGINEER. This is the Difference, we as Nigerians should desist that school of thought which tend to think its only those with certificate are worthy to be called Engineers nop, all maintenance personal in various industries in the west are mostly called Engineers even though they trained on the JOBB.
There you need a bit more enlightenment.
Here there is a question of legality, more than anything else.

In jurisdictions, the term “engineer” denotes a “professional.” Someone who has been certified to practice, as a lawyer or doctor would be.

Your line in bold is best ascribe ignorance, literally you can be called an engineer when you not certified, so long as you didn’t lead anyone to rely upon that assertion (as seen in op)

Certification of engineers typically applies in fields where human safety is at stake… So certification and licensing of structural, Mechanical and civil engineers is taken very seriously.
Business To BusinessRe: Introduce Your Business by beamNIGERIA: 8:05am On Oct 19, 2019
Phaitilicious:
Hello everyone.

I run an Errands / Personal Shopping company.

@shopnerrands we take care of shopping and errand needs for business owners and individuals.

Our services are:
Market Errands
Foodstuff/ Grocery Shopping.
Party planning Service
Aso-Ebi distribution
General Errands
Senior Care

Call or Whatsapp; 08110019641
Great
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 6:08pm On Oct 18, 2019
Kimsunh:
Pls house I am constructing a small 4 bedroom duplex on a 30/120 plot of land. We are at the parapet level and my oga engineer gave me this quotation which I think is killing. Please help me vet this quotation because I’m sure I can’t pay for this never and I don’t want to fight him. The length and breadth of the house is 72/24 Thank you sirs
Please let's try an avoid abuse of titles. It demeans professionalism.
I'm sure this quotation wasn't prepared by an 'Engineer'. That that he builds for you doesn't justify him earning the title Engineer, you addressing him as such, he is impersonating.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 7:25pm On Oct 09, 2019
bixton:
Your statement best stands out as an assumption and not verifiable and one of those building construction myths peddled.
The time factor/time line stated by AyeMaDaFunMi on his originating post is in order and will not bring any defect on the structure.
The only phase he needs to limit the time between the roofing wood frame work and the installation of the roofing sheets. It's either they are both done and considered as a single phase or the time interval between both should not be more than 3 months.
It is empirical and verifiable.

Causes of building defects are multi-dimensional and cuts across all process involved in producing the structure.

what do you define as myths? That any structural break in the wall could compromise the building envelope? Or 12months is enough time compromise integrity of masonry with moisture intrusion?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 11:06pm On Oct 07, 2019
bobkezel:
Gurus inn the house, Pls how many coaches of blocks is recommended after lintel casting?
Number of coaches after lintel is dependent on some factors like
1. Use of building as these would specify the headroom that needs to be achieved for the space. Residential buildings, you can have 2.8 - 3.0m from ffl.

2. Type of ceiling finishes: to achieve some ceiling finishes (e.g suspended pop )you need enough clear space after your ceiling level to thus there is need to more number of coaches after lintel.

Just relate your needs with any experienced builder/Engr., you don't have to be generic.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 10:47pm On Oct 07, 2019
bixton:
Please can you kindly highlight the aftermath defects of such?
As in the case of green growth on blockwall, where the roots have penetrated into masonry joints. Its difficult to completely ripped them off the wall before plastering. These root (no matter how small it is) later dislodge blockwall joints, allows water penetration then followed by eventually building defects e.g cracks, spalls.....
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA:
joycluv:
Good day all! Can a land measuring 35ft x 150ft accommodate a filling station or a plaza? Note: The side that measures 35ft is the only access to the land but faces the main road. Thanks as you share your views.
A plaza would fit better, you have a chance of going vertical to makeup for the horizontal shortfall
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 5:28pm On Oct 07, 2019
AyeMaDaFunMi:
I know construction is in stages. What I want to know is what can I do to build a house to completion, but doing a project every 6-12 months?

Can exposed/untreated concrete and steel retain their strength for 12 months?

I'm thinking maybe..

Phase 1: DPC
... wait 6-12 months or until funds are ready
Phase 2: German floor and plumbing
... wait
Phase 3: 1st floor walls to lintel
... wait
Phase 4: Decking and plumbing
... wait
Phase 5: 2nd floor walls to lintel
... wait
Phase 6: Decking/roofing and plumbing
Phase 7: Windows and door
... wait
Phase 8: Electrical
... wait
Phase 9: Plastering
... wait
Phase 10: Tiling
... wait
Phase 11: Painting
I'm very glad you cautious of the integrity of these buildings elements in process of over prolonging (in phases) the construction activities. Most of building defects after commissioning are due to neglected factors such as this.

Work protection is very important in construction, substantial amount of efforts should be put into protecting works in progress otherwise resources, project integrity and value are in jeopardy.

That been said, what you need right now is a program of work, prepared by a certified builder with your cash flow duly consulted.

In addition, the break between phase 3(Its ground floor nt 1st floor) and phase 4 shouldn't be up to 12months, as your have highlighted those walls are going to be loading walls. Likewise 5&6. Anything longer than that, green growth starts to occur on ur block walls and it's bad to Finish a building with that because of aftermath defects.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 12:08pm On Sep 27, 2019
elengine:
Professionals in the house. Please I need your advice urgently. I have just plastered a duplex and I did a decking or slab for my water tank on top of the roof. I just realized during the heavy rain that the slab or decking where we have water tank on it is leaking. I see water finding their way from the water slab to the wall inside. Although my plumber has assured that he will fix everything but I am considering doing a scaffolding and put my tank on it. So I want to know if it is possible to fix the slab as claimed by plumber I should just go ahead and do the scaffolding. I was told that slab will always leak even if it is not now, it will leak later
I don't understand what you mean by your plumber fixing everything.

I advise you felt the whole slab and drain the floor through sprout detailing. If you are considering having a scaffold, its great but still you need to arrest leakages on the the slab.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 8:52am On Sep 24, 2019
boma4success:
Hello my great Engineers in the house, please I will like to be enlightened on the construction of a water tank stand over a septic tank. My engineer advised I build my tank stand on the septic / soak away tank we are about to construct. He said we will only need 4pcs of 16mm to reinforce the water tank stand pillar from inside the ground to the top(where d water tank will be placed). And 12mm rods will be used for other things like underground pillars, first chaining, second chaining and the slab.
Please is this best way to go about it?
God bless you as you drop your comments / advices.
.

Its achievable
In as much as right mix ratio (c30) is adhere to. 12mm rebar isn't acceptable for column, advise him to revise whole rebar design.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 9:38pm On Sep 20, 2019
NowisGod109:
What can one build on 137.8sq.meter of land, with how many parking space. I need a good architect in Lagos.
Certain informations will be required to attempt this question for functionality and optimization reasons, ranging from location, proximity, ROI (return on investment), prospects and government polices (town planning), etc...

In a densely populated neighborhood, 137.8sqm is a lot of space, its about been minimal in approach and maximizing its immediate potential.

Numbers of parking space required is dependent on the type of structure proposed. Eg. A store or mall required parking space is 3 per 100sqm of building area. (Architect's data)..
PropertiesRe: Whole House Audio System + Cctv Installations For A Nairalander by beamNIGERIA: 5:28pm On Sep 17, 2019
Great job
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 7:53am On Sep 12, 2019
rotecch77:
Everything/every system has merit and demerit

Advantages of this system fly over ( upper connection supply)
1. It will reduce materials.
2. There will be water for both the upper and down floor of the building at the last bottom level of the tank water.
Disadvantage
1. Their will be likely air lock once in a while( but once the taps are open within 2-10 minute it will be off).



Advantage of direct downward system.
1. Air lock can not occur on this system

Disadvantage
1. Once the water on the over head tank is low, the upper floor will experience low pressure of water

Actually I use to do both, check the pics here we did down ward system for a nairaland member, Gbadex did the painting.
Flying cold water supply is rather vernacular, shouldn't there have been a booster pump.
CelebritiesRe: Reekado Banks Fires Temi Solomon, His Brother As Manager, Explains Why by beamNIGERIA: 9:02pm On Sep 11, 2019
madenigga:
The brother looks like someone who would thrive more at a 9-5 job than in the entertainment industry
Not by looks bro, temi sabi ... has been instrumental to reeky's achievement in the industry
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 10:24pm On Sep 10, 2019
rocktowerbuilde:
Thanks for the explanation. But you seem not to understand what I mean by a "Builder".
An Education on my position
A Builder is a professional who studied building or building technology or any other related discipline in the built environment in any higher institution of learning and registered with the Council of Registered Builders of Nigeria (CORBON). They are specially and primarily trained for the construction of buildings in it's entirety. Engineers (e.g. structural, electrical and mechanical), architects, quantity surveyors etc. are respected "CONSULTANTS" on the building site.
I hope our dear nation will pass her building code (NBC) to law to regulate the operations of Professionals in the built environment and ensure sanity in the construction industry.
Rightly said
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA:
Dubemcapital1:
With due respect sir, A builder is a Contractor whose job is to construct a civil structure BY employing a necessary workforce :
1. Engineer
2. Workmen (skilled)
3. Labourers (unskilled)
4. Materials
5. Other resources.

But a civil engineer is someone who has acquired knowledge of designing, constructing and maintenance of a structure.

Therefore, just as homeowners, a builder hires an engineer to aid his work with technical or professional aspects.

So, by implication, a civil engineer can be a builder but a builder is not an engineer.

Howbeit, a builder's job description does not include the bone of contention


Thanks

Dubemcapital
STOP gibbering with confidence.

Contractor is a businesses man, could be from any background

Builders are professionals solely responsible for building production as established by Federal Republic of Nigeria Act Cap No. 40( B.13 LFN, 2004).
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 10:15pm On Sep 02, 2019
EvaFemi07:
I am new here and I really want to thank everyone for what I have read so far on this forum. Please I want to ask about BOQ, we have a duplex and all drawings are ready so I would love to know:
1) How much does it cost
2) How detail does it always fo
3) Some told me 50k and I think it might be too expensive, what do you think
4) I dont have any ideas about it so what should I look out for
5) What differentiate a good BOQ from a bad one
Please I nedd your help
I'm of the opinion that you should engage a Quantity surveyor not just anyone. You assured to get the best as regards details and accuracy.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by beamNIGERIA: 12:40pm On Aug 30, 2019
Samaras:
Good evening professionals in the house. I need an overhead tank for a duplex in Lagos done as soon as possible. Who has information as to cost estimates and/or professionals who are available to do such?
I am expecting something like done on this thread: https://www.nairaland.com/4967576/making-overhead-tank-stand-back-filled
Good afternoon sir, you can check our signature for our contact informations. Let's get additional brief and we will definitely revert as soon as possible.

Warm regards

1 2 3 (of 3 pages)