BuildingProject's Posts
Nairaland Forum › BuildingProject's Profile › BuildingProject's Posts
neduboo:Just bought mine few days ago. 12mm and 16mm. 250k/tonne 10mm is 255k/tonne Binding wire 8k. |
segzy14:Am just beginning to get worried cause of the filling and the number of cements going to be used. Cause they've used 77 bags to that stage and he said they're going to need 30 bags for casting that is about to start. |
Hello all, So work has commenced and my Engineer said the land is sloppy so he had to lay 9 coach at the back and 8 coach at each side so that when they start constructing the drainages I won't have water flood in my compound. Here is now my question.... He said he wants to bury another 3 coach at the back so that when it's time to start sand filling, the walls are not going to collapse due to weight of the sand been resting on the walls. Am thinking if there is an alternative to this cause he has consumed 1200 blocks already to dpc level and it's not a water logged area. He said we either build another wall of 3 coach to hold the wall or we pour concrete inside the block so that it can stand the pressure. Please what options do I have cause they've started casting already.
|
Hello all, please I need help of professionals in the building. I want to start my kobo kobo project and the bàbà láti I called í about kill me with bills. Someone should please help me to review all this things he wrote. Most especially the job discussion part.
|