Properties › Re: Vacant Thread by Dennis3D(op): 11:14am On Sep 10, 2019*. Modified: 6:55pm On Nov 17, 2020 |
. |
Properties › Re: See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 11:14am On Sep 10, 2019 |
Call us today if you need our services |
Properties › Re: Vacant Thread by Dennis3D(op): 11:14am On Sep 10, 2019*. Modified: 7:14pm On Nov 17, 2020 |
. |
Properties › Re: 2 Different Duplex Construction Ongoing At Two Different Locations by Dennis3D(op): 11:13am On Sep 10, 2019 |
Call us today if you need our services |
Properties › Re: 5 Bedroom Duplex Design With 2 Unit 2 Bedroom Flat Attached by Dennis3D(op): 11:13am On Sep 10, 2019 |
Interested. Call us today |
Properties › Re: 4 Unit 2 Bedroom Block Of Flats Design - One Plot by Dennis3D(op): 11:13am On Sep 10, 2019 |
Interested in the plan. Contact us |
Properties › Re: Vacant Thread by Dennis3D(op): 8:08am On Sep 09, 2019*. Modified: 7:07pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 8:07am On Sep 09, 2019*. Modified: 7:07pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:57am On Sep 09, 2019*. Modified: 7:07pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:56am On Sep 09, 2019*. Modified: 7:07pm On Nov 17, 2020 |
. |
Properties › Vacant Thread by Dennis3D(op): 6:50am On Sep 09, 2019*. Modified: 7:06pm On Nov 17, 2020 |
. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 9:55am On Sep 07, 2019 |
rotecch77: Good of you my brother, I believed that All the 7 professionals in build industry knows there roles.
Architects Builders(contractor) Structural Engr’s QS’s Electrical engr And the rest.
So don’t let’s argue about each professionals roles or get it twisted.
As a structural engr you know your roles in building is to design the structural details of building and hand over such documents to the architect which the architect will hand it over to the builder to construct such structure according to the details giving.
with(construction of special building like stadia, airport dam bridges and main road)
As a builder you know your work ,construction of building and maintenance with [building economy( only diff btw civil engr and builders)].mean while all the builder must know about; QS work, architectural drawing, structural design and detailings, Mech and electrical work because it’s in there Sch curriculum, if any builder fail to know this he or she can’t handle building construction, that is why, Not all contractor are builder. But all builder are contractor
QS; estimator.
Etc.
But generally All the 7 professionals can handle building construction. Good one. As you simply stated it. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:55pm On Sep 04, 2019 |
shelliz: ONLY IN NIGERIA!!! Any other part of the world where transparency is the order of the day, the price of an item, goods or services is open to all with either possibility of negotiating or not. But in NIGERIA, the reverse is the case. It's really a PITY!!!!!!!!!!!!!!!
Please be specific when you talk about "work ethics"..... Next time you should state "some untransparent nigerians work ethics". Thank you � |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:41am On Sep 04, 2019 |
durojim007: When it comes to discussing money, you requested for private chat Do you expect people to be negotiating here? Wowww. Sometimes people should learn to know the difference between a private space and public space. Ethically and commonsenically it's wrong to be negotiating with any individual here. People here aren't interested in that and it's a violation of work ethics |
Properties › Re: 4 Unit 2 Bedroom Block Of Flats Design - One Plot by Dennis3D(op): 8:26pm On Sep 03, 2019 |
emergingstars: WHAT YOU SHOULD DO BEFORE BUYING A LANDED PROPERTY
Some people believe merely paying for a property is all that is required to buy landed property. There are certain things every prospective buyer should know and do before paying for landed property. It is advisable that you seek advice from your Solicitor before completing a land transaction. It may cost more but I can assure you that over time, you will be glad you did.
1. Conduct investigation of the title –
This entails obtaining land information with the survey plan of the property at the office of the Surveyor-General to determine whether the land is free from acquisition. The investigation also entails conducting a search at the Lands Registry (in cases where property is registered), this search helps detect if there is any encumbrance (litigation, loan or other issues) pertaining the land. The title can also be investigated by a review of title documents by your Solicitor to detect the defects in the root of titles. Physical inspection and enquiry from adjourning properties can also provide information that will assist in investigating title. A search at the Court’s Registry to discover litigation on land may be done where necessary.
2. Preparation and execution of Conveyance documents –
After investigation of the title and confirmation of the status of title, the conveyance documents should be drafted by a Solicitors for execution of all parties. Please note that conveyance documents for sale of family property must be signed by the family head and all principal members of the family. The conveyance documents should contain the standard terms, including but not limited to, the purchaser’ right to be indemnified from third party claims, the Vendor’s duty to provide documents required for perfection of title, etc. Please contact your Solicitor for advice.
3. Possession –
Take physical possession immediately after payment. Possession of landed property means the occupation or physical control of the property or parcel of land either personally or through an agent or servant of the claimant. Please contact your Solicitors for advice on this.
4. Perfect your title –
After payment, signing of documents and taking over possession, ensure don’t keep the conveyance documents in your locker, proceed to perfect your title (i.e. Obtaining Governor’s Consent and registering) as prompt as you can.
Be guided that in Nigeria, there are five ways to prove ownership of land i.e. by traditional evidence; by document of title; by various acts of ownership numerous and positive and extending over a length of time as to warrant the inference of ownership; by act of lawful enjoyment and possession of the land and by proof of possession of adjacent land in circumstances which render it probable that the owner of such land would be the owner of the other land.
For further questions and clarifications, please send us an email at lawcandles@gmail.com
We will gladly provide you with the required help and assistance. Thanks |
Properties › Re: 5 Bedroom Duplex Design With 2 Unit 2 Bedroom Flat Attached by Dennis3D(op): 6:44pm On Sep 03, 2019 |
What do you think. Call us today for building designs and construction services. WhatsApp or call 07038166370 or 08081465833 or email us at dennis3ddesigns@gmail.com
Let's talk. |
Properties › Re: 2 Different Duplex Construction Ongoing At Two Different Locations by Dennis3D(op): 6:44pm On Sep 03, 2019 |
What do you think. Call us today for building designs and construction services. WhatsApp or call 07038166370 or 08081465833 or email us at dennis3ddesigns@gmail.com
Let's talk. |
Properties › Re: 4 Unit 2 Bedroom Block Of Flats Design - One Plot by Dennis3D(op): 6:43pm On Sep 03, 2019 |
What do you think. Call us today for building designs and construction services. WhatsApp or call 07038166370 or 08081465833 or email us at dennis3ddesigns@gmail.com
Let's talk. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:43pm On Sep 03, 2019*. Modified: 7:01pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:43pm On Sep 03, 2019*. Modified: 6:48pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:38pm On Sep 03, 2019*. Modified: 7:13pm On Nov 17, 2020 |
. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:01am On Sep 03, 2019 |
praxs: My land is 50*100 which is just a plot of land. The picture is attached is from the internet, so I don't have the design. However, I wish to build a two bedroom apart with a similar frontage just like the attached picture. Discard the garage design, I don't need it, just the frontage. More to that, to reduce cost, I will prefer to go for flat roofing (Dubai Com temporary roofing, don't really know the name). Do you think 2.5m can do this job? Location:Somewhere in the north 2.5 can't do the job. It's that simple. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:59am On Sep 03, 2019 |
bixton: Easy enough. Why don't you tell the fellow that did the drawings to put up a BOQ for you. You can bargain with him. That's another option. That can be correct only if the person is into construction and has the right figures too. It's not everyone that designs that can do a BOQ remember doing BOQ is an entire job of a Quantity Surveyor to do, just that in Nigeria here, an experienced and well groomed architect or builder can try to do it... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:57am On Sep 03, 2019 |
EvaFemi07: I am new here and I really want to thank everyone for what I have read so far on this forum. Please I want to ask about BOQ, we have a duplex and all drawings are ready so I would love to know: 1) How much does it cost 2) How detail does it always fo 3) Some told me 50k and I think it might be too expensive, what do you think 4) I dont have any ideas about it so what should I look out for 5) What differentiate a good BOQ from a bad one Please I nedd your help Do you need a BOQ that's the question. If yes. Then let's talk. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:55am On Sep 03, 2019 |
bajeen: Good morning, After foundation works for my project, i now want to take it to lintel level. A bricklayer gave me an estimate of 2500 blocks Cement: 75 bags Sand: 5 trips Labour: 180k
My ogas, please help me to vet as i am trying to cut cost while not compromising quality. How many blocks will a bag of cement lay? And what's the average labour cost of laying a block? Thanks Provide all details first before one can advise accordingly... Already setting 2500 blocks shouldn't pass 130K on its own. If there are other things like Lintel casting, site concrete pouring etc. Specify them for a better advise |
Properties › Re: Vacant Thread by Dennis3D(op): 3:45am On Sep 01, 2019 |
We design and build |
Properties › Re: See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 3:44am On Sep 01, 2019 |
We design it. We build it |
Properties › Re: Vacant Thread by Dennis3D(op): 3:43am On Sep 01, 2019*. Modified: 6:55pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 3:43am On Sep 01, 2019*. Modified: 6:55pm On Nov 17, 2020 |
. |
Properties › Re: See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 3:43am On Sep 01, 2019 |
We design and build |
Properties › Re: TWIN 4 Bedroom Duplex In A Plot Of 600sqm² by Dennis3D(op): 3:42am On Sep 01, 2019 |
We design and build |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 9:31am On Aug 31, 2019 |
Again I normally tell clients this...
There is something for everyone in the building industry. The industry from my perspective is divided into four.
Low class Middle class High Class Executive Class...
Just as these class exists. So are building materials also that exits. And you can attest to the fact that when the jobs are carried out you don't expect to get the same results.
You can't be in low class or middle class and expect a high class or executive lass finishing. That's simply natural that there is more to the eyes than you hear and see.
Operate within your budget and don't call anyone a thief or fraudulent or mischievous. More so, accept to buy materials for yourself so as to avoid issues in the future.
To maintain a good working relationship between client and contractor. There should be steady communication and tracking of data and record of materials and workmanship costs during the construction process or phases of a project.
Let me shock you. Do you know an engineer tries to Stay within budget if he is given a budget to work with from the beginning unlike when a client is making direct procurements? |