Properties › See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 5:52am On May 09, 2019*. Modified: 12:04am On Dec 26, 2019 |
Hello Nairalanders,
Note: We did all the construction works in 2018 alone. It's finishing we started in 2019. For all the projects we are showing here.
It is a good honor and privilege to be part of this great forum and most especially this property section. It is also important to note that the works you are about to see, are all owned by Nairalanders here as well who has found us worthy of handling their design and construction projects.
These projects are situated not in one location. Meaning. We can work in your location except a few remote areas that has security challenges.
We personally designed this projects from the brief handed over to us by the Nairaland individual, and we ended up designing to their taste and even exceeding their expectations during the course of the construction.
For designs and construction. Contact us on 07038166370, 08081465833 Email us at Dennis3Ddesigns@gmail.com.
We Design and build to 99% accuracy level. Don't be a Thomas. See it yourself.
This first building is situated in Lakowe Ajah Lagos State. Details of Construction - Land: 510sqm - Description: Owner Occupied 4 Bedroom Executive Duplex. Total rooms. 8 Bedrooms ensuite. Total toilets: 9. Total Kitchen: 4. Total Sitting room: 4 Car park: 6 vehicles Security House : 1 Gen House: 1
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:18am On Apr 11, 2019 |
Thinking of Building Design and Construction. Leave it for us. We do as we say and build as we design.
|
|
|
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 4:44am On Apr 08, 2019 |
megacontrol: Please what is the headpan/bucket quantities for 1:2:4 mix ratio? 1 Bag of Cement - 4 Head pan of sand - 8 Head pan of Granite = Good Concrete mixture grade 20 |
Properties › Re: Quality Imported Doors And Tiles Available by Dennis3D(m): 5:58pm On Apr 06, 2019 |
Iamgrey5:
 Send me your door samples and price attached. Best price pls. I want to show my clients. Send to my WhatsApp on 07038166370 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:07am On Apr 01, 2019 |
Adedward: 14 feet is OK for that kind of building, Minimum should be 18fit. Coz the building is long. I have done 11x22m with 18fit. See my profile for the project. And many other projects |
|
|
Properties › Re: Vacant Thread by Dennis3D(op): 9:51am On Mar 27, 2019*. Modified: 6:33pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 9:51am On Mar 27, 2019*. Modified: 6:33pm On Nov 17, 2020 |
. |
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 3:33pm On Mar 26, 2019 |
We don't stop at anything. We deliver quality and class. We give the best as we say. We Design before its built. We evaluate or works with client during construction. We guarantee style and precision.
|
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 3:30pm On Mar 26, 2019 |
See how far we have come on this project. We update our designs and give our clients the best. We don't stop at design stage. We build exactly what is designed.
|
Properties › Re: Vacant Thread by Dennis3D(op): 3:27pm On Mar 26, 2019*. Modified: 6:33pm On Nov 17, 2020 |
. |
Properties › Re: Vacant Thread by Dennis3D(op): 3:24pm On Mar 26, 2019*. Modified: 6:33pm On Nov 17, 2020 |
... |
Properties › Re: Vacant Thread by Dennis3D(op): 3:23pm On Mar 26, 2019*. Modified: 6:34pm On Nov 17, 2020 |
. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:35pm On Mar 17, 2019 |
GoodFaith: YOUR ABOVE COMMENTS JUST CALLED ME IGNORANT-- YES IGNORANT YOU ARE A COMPLETE TRASH FUCKER THE COST OF 775K MAKE ANY SENSE TO YOU? TELL ME ANY SENSE IN BENIN CITY FOR THAT PROJECT ARE YOU FUCKING OUT OF YOUR DUMB ASS 419 MIND PLEASE DON'T HELLO ME WITH YOUR BS STOP YOUR BS I AM VERY WELL INFORMED Please go far from me I am not foolish or dumb I KNOW BETTER WHAT IS UNACCEPTABLE IS YOUR FAILURE TO MAKE ANY ANALYSIS ON THE 775K YOU KNOW WHAT WAS REAL INTERESTING WAS rotecch77 KNEW BETTER TOO I AM NOT A CONTRACTOR BUT I HAVE GOT MY HANDS DIRTY I BELIEVE ON PROJECT MEETING STATE AND LOCAL STANDARD I HAVE HAD TWO OF MY PROJECT INSPECTED IN THE LAST FOUR MONTHS ONE INSPECTOR'S COMMENT WAS THIS IS THE BEST HOUSE YOU HAVE HAD TO THE TENANT SECOND INSPECTOR GOOD MAN GREAT PROPERTY No arguments with you. I clearly pointed out where are misinformed with the information given and you are showing your level of maturity or what you might want to call it. I have raised points with facts. Deal with it. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:54am On Mar 16, 2019 |
GoodFaith: In Benin one bricklayer and a services set 100 block ( bricklayer 3k ,service 2k) to set 400 block will be 20k
20 bags for one? ---- Get real to set 100 block is one bag of cement To set 400 block let us say 5 bags
rotecch77@ take your time oh The dude is getting robbed Hello. Please watch your word. And stop misleading people here. Did I hear you say one bag of Cement would set 100 blocks. Pls you don't need to be on this thread. I swear. Where on earth do you set 100 blocks with one bad of Cement. No wonder why buildings fail. At what mixture rate are you using. You just exposed yourself and your flaws. It's totally unbearable to say that. If you are not well informed don't speak. Watch. Read. Learn. Than giving people wrong advice. Normal mix ratio of 1:6 or 1:7 of 9 inches would give you approximately 40 - 50 blocks for one bag of Cement then 55 - 65 for 6 inches. Where did you get your 100 from. Be careful please. People here talk anyhow to run other peoples job down. That's baseless and completely unacceptable. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:48am On Mar 16, 2019 |
rotecch77: I like most replied you have gotten so far here.
But if will look at this quote very well is not too much on high side as some people exaggerated it. Although few of the items are slightly on high side.
A. The size of your suckaway and septic tank will determine the cost.
1.cost of digging 2 unit of complete suckaway/ septic tank in lagos range btw 25-30 for 1unit, means 50- 60k for the 2 unit.(your quote says 50k STILL GOOD RATE.
2.Setting of block for the 2 unit will cost you around . Let say each unit is 400 block x2=800 ×50each=40,000 Your quote says 48,000 SLIGHTLY OK this will based on the size of the Suckaway/septic tank.
3.Carpenter : here in lagos for each unit it will cost about 10-15 x 2uint 20-30 ( this depends on area)
4 Iron bender same as carpenter.
5 .labour for casting both the columns, beam, and slab for the 2 unit will cost around 25-35k ( this also depends on your location bcs some labour now charge 3k for casting and bricklayer 3.5k.
Material.
CEMENT; 40 bags of cement for the 2unit means 20bags for each unit (a) settings of 400 block, floor casting, beams, columns, slab with good ratio lats say ratio 1;2;4 i will say ( your quote of 40bags is PERFECTLY OK
REINFORCEMENT, .as i said ealier .the size of the septic tanks will determine this but something 35-40 lenght of 12mm will do the beam, columns, slab of the 2 units.(note this is for regular septic tanks and suckaway)
But if you are still not ok with him you can buy your materials
LET ME STOP HERE FOR OTHERS. God bless you for talking in this manner. I don't know who made the initial post. But the point to take from all this is. Cost of Labour and materials and quality of construction varies from location to location. No client should use the basis of one work to judge others. People cut corners alot and do very unstable jobs now making a client feel as if he is cheated. If not why not contact the big Ogas in the field and see their rates. Ira by per square meter construction which takes care of materials and Labour and profit and all. So I join you to say that client should be mindful of how they try to run someone down because of a quote. I think what you need to do as a client is to call the person that did the quote to explain why some variables are the way they are. It's when the person don't give you satisfactory response that you can come here. Instead of tagging him a thief. My take. Alot of us here are victims of such accusations. Not necessarily me, but from what I see here. That's the case. Client want cheap Labour but good job. You can't eat your cake and have it in construction. Be wise. Be mindful. Everyone has the right to fair hearing. |
Properties › Re: Vacant Thread by Dennis3D(op): 6:35am On Mar 16, 2019*. Modified: 6:58pm On Nov 17, 2020 |
. |
|
Properties › Re: Vacant Thread by Dennis3D(op): 6:54pm On Mar 12, 2019 |
Perimeter fence concrete base construction ongoing. Quality must be retained.
|
Properties › Re: Vacant Thread by Dennis3D(op): 6:52pm On Mar 12, 2019*. Modified: 6:59pm On Nov 17, 2020 |
.
|
|
|
Properties › Re: Vacant Thread by Dennis3D(op): 4:20pm On Mar 09, 2019 |
Result to be out ASAP.
|
Properties › Re: Vacant Thread by Dennis3D(op): 4:12pm On Mar 09, 2019 |
Soil test investigation ongoing. Very necessary due to soil structure and area under survey.
|
Properties › Re: Vacant Thread by Dennis3D(op): 4:07pm On Mar 09, 2019*. Modified: 6:52pm On Nov 17, 2020 |
. |
|
Properties › Re: 3 Bedroom Bungalow Design - Photos by Dennis3D(op): 3:48am On Mar 06, 2019 |
Ayhomes: how much will this cost according to what you design here ? Estimated building cost alone is 15m |
Properties › Re: Vacant Thread by Dennis3D(op): 3:47am On Mar 06, 2019*. Modified: 7:18pm On Nov 17, 2020 |
. |