Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 3:29pm On Aug 06, 2018
mexxy1:
I have been following you and your jobs and, you're doing well but, I have to point out to you that you're very unprofessional in your approach to showcasing your jobs.

Take note of the following;
1. Try as much as possible to post pictures of your jobs and not of you.

2. It is very unprofessional to post the interior of a client's living room no matter what statement you're trying to make.

3. Another unprofessional attribute you have is posting actual names of clients. I would rather you post the clients moniker (for those on nairaland) or blur the names (for those on or not on nairaland).

That being said, I wish you well in your jobs. Thank you.
Thank you for your observations
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
....
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 12:21am On Aug 06, 2018
Photo update from today

Day 20 — August 5th
Dennis3D is working
07038166370, 08081465833
Dennis3ddesigns@gmail.com

We don't stop at anything... We are almost there. Started the parapet carpentry works today... Welder to commence tomorrow Day 22 - August 6th.

First see photos

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 12:12am On Aug 06, 2018
mufutau55:
You don try well, well o. Keep it up Sir.

Hajji M.
Pls how do I advertise - boost my posts here. Pay and boost on property section. I need more details on how to go about this...
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
Today been day 20 of this construction. Watch out as we start the parapet carpentry works today. Leveling was completed yesterday 4th August making it Day 19.

We are still moving on and on... See photos of yesterday works before leveling commenced...

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 5:12am On Aug 04, 2018
mufutau55:
You don try well, well o. Keep it up.

Hajji M.
Thanks Hajji. Your guy is loyal. Doing stuff gradually
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
DAY 18 of the Project.

More photos from today August 3rd...
Seeing is believing...

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 8:44pm On Aug 03, 2018
Today 3rd August - This is how far we went. Casting of the upper floor Lintel and Columns just after two days block work.

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 6:02am On Aug 03, 2018
After going to check for the design roofing facial we initially designed and couldn't get it in the market here in pH. We therefore resort to casting parapet now. But first I have redesigned the roof pattern just yesterday. Reviewed with client and its accepted.

Here is the new approach now. Now that's why we are extremely competent and fast because from design to construction. We are always on ground providing additional support to our client.

Note: this parapet design is more cost effective than the curved shaped one. Which we did the design too and presented the 3 different roofing designing to the client to pick from.

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 5:55am On Aug 03, 2018
August 2nd 2018

We are at Lintel already. That's day 17 of our work
.. More pictures to follow as we cast today August 3rd.

Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by Dennis3D(m): 5:51am On Aug 03, 2018
Well done partner
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 4:44pm On Aug 02, 2018
Dominionng:
Cost depends on size and thickness. Ranges from 10k - 35k a piece

Sizes: 1.2m x 2.4m, 1.2m x 3m

Thickness: 6mm, 8mm, 10mm 12mm, 20mm
You are 100% correct with this info. I confirmed from the dealers in Lagos this exact information you wrote here.
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 11:38am On Aug 02, 2018
gordonbarrett:
Thanks for the information. Do you have any idea of the size and cost of the board?
I have a contact for the board dealer in Lagos but not here in ph. In fact I went out this morning to look for the board at mile 3 in PHC here. I didn't find it. So am going to change the roof facial now to concrete facial with its own design. Am currently designing it on my system now. I have communicated with the client about it though so we have other options...
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 8:51am On Aug 02, 2018
InvertedHammer:
/
Ever considered concrete and materials lift. It pays for itself overtime. I try to bypass waste.

You are trying o! Rain in PH is on another level. I had to abandon ship in June after rain no gree make we progress.

No rain on Fridays because of Ikwerre burials ( grin grin grin) that's what I heard and it seemed to work.

Well...Kudos!

/
Hmmm rain in PHC is something else especially at this time of the year. It's been raining everyday here but thank God that the times I don't need the rain to fall it wouldn't. Thank God for that. Not my power. Example. The day we cast decking. It rain heavily on the Sunday morning 30th July in PHC. In fact I almost gave up on the rain. By 8am it stopped and was drizzling. By 10am sun ☀ came out and was really shining very well. Till evening. The next day was sun too for two days. It's been nice and challenging at the same time.
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 8:47am On Aug 02, 2018
Dominionng:
It is called Cement Board sir. Kalsi is a brand.

Beautiful thread by the way.
Thanks for that info. Very important
Properties › Vacant Thread by Dennis3D(op):
.
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 11:35pm On Aug 01, 2018
Client: Nairaland
Project Location: Gbagada Project Lagos State
Architect: Dennis3D
Contractors: Dennis3D

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 11:33pm On Aug 01, 2018
This year alone I have been opportune to do 4 projects currently ongoing. I designed all and am doing the construction.

I have an in depth knowledge of these foundation types.

- Strip
- Strip and Pad.
- Isolated Pad
- Raft
- A combination of either of two or more foundation types.

The locations I have projects ongoing are
- Lakowe Ajah Lagos
- Oke Aro Ogun State
- Gbagada Lagos State
- Uratta North Imo State
- PHC River State of which this thread is capturing it. Other projects listed here have their own thread and posts here in my profile. You might want to take your time to check it out...

We design and build homes not houses...
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 11:27pm On Aug 01, 2018
An ongoing project I designed for a Nairaland client and am currently building it too in Ajah. Started it February this year. Here is the 3D and the real life construction images.

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 11:24pm On Aug 01, 2018
ogaibe1:
Mr Dennis, I see your doing your thing already, I like the bold steps you have taken to feature your work here, there are a lot of professionals just like you and be ready to answer questions so that the trust and confidence in your work can stand out. I like what am seeing already and am confident that you have more project including mine loading.
Thank you sir. Pls feel free to ask your questions anytime for anything about construction. I am very deep into building design and construction and am willing to help.

As we speak. Am currently doing some projects for two Nairaland clients. Big projects... And I can share the pictures here
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 10:43pm On Aug 01, 2018
educhigo:
please urgent advise needed,can i build 1 upstair 6flat with 5 inches blocks please i need and urgent answer
No. It's not advisable.
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
Hello guys. Today 1st August Birth to this... We are already at the upper floor lintel level... Pillars in place, lintel to continue tomorrow while the Carpenter starts upper floor chain round again...

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
More pictures from July 31st Work.

Upper Floor was adjusted to be two unit of one bedroom Flat now.

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op):
We were able to do this today 31st July 2018.

We resumed the upper floor just two days after casting. That might surprise you. However we are applying safety propping in place and reducing weight on the building in the best way possible. After which the building would be left without touch for a month before plastering can commence...

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:53am On Aug 01, 2018
Frayo82:
Hi all what is the cost of getting an engineer to supervise a 4 bedroom duplex in lekki lagos.
See plan for sample
Contact me. That's my work. I build with 99% accuracy level. Yes u heard me. My profile says it all. Am currently working in that axis already. Check my profile to see numerous works am working on
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 3:02pm On Jul 31, 2018
gordonbarrett:
Thanks for the information.

Is the Kalsi board cost effective compared to plasterboard, and will it require screeding after installation or just painting? I know it should be cheaper that concrete facia.
It's cheaper than concrete casting
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 9:44am On Jul 31, 2018
This and many more. But I would stop here to focus on the new project that this project is meant for.

Wait for updates today as I put up what am doing today on the saloon. Am doing the layout today after the decking have been left to rest. But the supports are all in place and reinforcements of the bracings...
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 9:30am On Jul 31, 2018
To portray my points well enough. Am gonna post more of my completed projects here...

This is me also during the construction...

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 9:18am On Jul 31, 2018
EgunMogaji:
You have my support for not doing double work on the steps.

What is the oldest build you’ve done and have you returned for inspection?

Thanks for sharing.
Check this out. Am going to show you guys the computer design before and after construction.

I built this in Ikorodu Lagos State

Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 9:09am On Jul 31, 2018
gordonbarrett:
Nice design.

Wondering the Material used for this type of facia and soffit. Is it plasterboard?
It's called Kalsi Board. POP Water resistant plasterboard can be used too or direct concrete facial casting
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 9:08am On Jul 31, 2018
EgunMogaji:
You have my support for not doing double work on the steps.

What is the oldest build you’ve done and have you returned for inspection?

Thanks for sharing.
The oldest I have done personally is 5years now and it's looking so nice. If you don't mind I can share it here too