mexxy1:Thank you for your observations |
.... |
Photo update from today Day 20 — August 5th Dennis3D is working 07038166370, 08081465833 Dennis3ddesigns@gmail.com We don't stop at anything... We are almost there. Started the parapet carpentry works today... Welder to commence tomorrow Day 22 - August 6th. First see photos
|
mufutau55:Pls how do I advertise - boost my posts here. Pay and boost on property section. I need more details on how to go about this... |
Today been day 20 of this construction. Watch out as we start the parapet carpentry works today. Leveling was completed yesterday 4th August making it Day 19. We are still moving on and on... See photos of yesterday works before leveling commenced...
|
mufutau55:Thanks Hajji. Your guy is loyal. Doing stuff gradually |
DAY 18 of the Project. More photos from today August 3rd... Seeing is believing...
|
Today 3rd August - This is how far we went. Casting of the upper floor Lintel and Columns just after two days block work.
|
After going to check for the design roofing facial we initially designed and couldn't get it in the market here in pH. We therefore resort to casting parapet now. But first I have redesigned the roof pattern just yesterday. Reviewed with client and its accepted. Here is the new approach now. Now that's why we are extremely competent and fast because from design to construction. We are always on ground providing additional support to our client. Note: this parapet design is more cost effective than the curved shaped one. Which we did the design too and presented the 3 different roofing designing to the client to pick from.
|
August 2nd 2018 We are at Lintel already. That's day 17 of our work .. More pictures to follow as we cast today August 3rd.
|
Well done partner |
Dominionng:You are 100% correct with this info. I confirmed from the dealers in Lagos this exact information you wrote here. |
gordonbarrett:I have a contact for the board dealer in Lagos but not here in ph. In fact I went out this morning to look for the board at mile 3 in PHC here. I didn't find it. So am going to change the roof facial now to concrete facial with its own design. Am currently designing it on my system now. I have communicated with the client about it though so we have other options... |
InvertedHammer:Hmmm rain in PHC is something else especially at this time of the year. It's been raining everyday here but thank God that the times I don't need the rain to fall it wouldn't. Thank God for that. Not my power. Example. The day we cast decking. It rain heavily on the Sunday morning 30th July in PHC. In fact I almost gave up on the rain. By 8am it stopped and was drizzling. By 10am sun ☀ came out and was really shining very well. Till evening. The next day was sun too for two days. It's been nice and challenging at the same time. |
Dominionng:Thanks for that info. Very important |
. |
Client: Nairaland Project Location: Gbagada Project Lagos State Architect: Dennis3D Contractors: Dennis3D
|
This year alone I have been opportune to do 4 projects currently ongoing. I designed all and am doing the construction. I have an in depth knowledge of these foundation types. - Strip - Strip and Pad. - Isolated Pad - Raft - A combination of either of two or more foundation types. The locations I have projects ongoing are - Lakowe Ajah Lagos - Oke Aro Ogun State - Gbagada Lagos State - Uratta North Imo State - PHC River State of which this thread is capturing it. Other projects listed here have their own thread and posts here in my profile. You might want to take your time to check it out... We design and build homes not houses... |
An ongoing project I designed for a Nairaland client and am currently building it too in Ajah. Started it February this year. Here is the 3D and the real life construction images.
|
ogaibe1:Thank you sir. Pls feel free to ask your questions anytime for anything about construction. I am very deep into building design and construction and am willing to help. As we speak. Am currently doing some projects for two Nairaland clients. Big projects... And I can share the pictures here |
educhigo:No. It's not advisable. |
Hello guys. Today 1st August Birth to this... We are already at the upper floor lintel level... Pillars in place, lintel to continue tomorrow while the Carpenter starts upper floor chain round again...
|
More pictures from July 31st Work. Upper Floor was adjusted to be two unit of one bedroom Flat now.
|
We were able to do this today 31st July 2018. We resumed the upper floor just two days after casting. That might surprise you. However we are applying safety propping in place and reducing weight on the building in the best way possible. After which the building would be left without touch for a month before plastering can commence...
|
Frayo82:Contact me. That's my work. I build with 99% accuracy level. Yes u heard me. My profile says it all. Am currently working in that axis already. Check my profile to see numerous works am working on |
gordonbarrett:It's cheaper than concrete casting |
This and many more. But I would stop here to focus on the new project that this project is meant for. Wait for updates today as I put up what am doing today on the saloon. Am doing the layout today after the decking have been left to rest. But the supports are all in place and reinforcements of the bracings... |
To portray my points well enough. Am gonna post more of my completed projects here... This is me also during the construction...
|
EgunMogaji:Check this out. Am going to show you guys the computer design before and after construction. I built this in Ikorodu Lagos State
|
gordonbarrett:It's called Kalsi Board. POP Water resistant plasterboard can be used too or direct concrete facial casting |
EgunMogaji:The oldest I have done personally is 5years now and it's looking so nice. If you don't mind I can share it here too |