EfeEj's Posts

Nairaland ForumEfeEj's ProfileEfeEj's Posts

1 2 3 4 5 6 7 (of 7 pages)

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 3:55pm On May 13, 2017
Rubbles brought in for road filling

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 3:21pm On May 12, 2017
Excuzeme:
Thank you for your response.
If l may probe further, is the above different from what l have seen done (which they also call Screeding!) whereby normal cement only (like Dangotte Cement) is used by mixing it with a little cement gum (to increase adhesion) and then used to PAINT the walls of the building?

Or is it the same thing but just using "cheaper" materials?

Once again, thanks for your response.

**** Why are we not seeing more pix of this beautiful house?
It's almost the same thing but not same. The portland cement Is introduced in the mix when it is to be applied on the exterior of the building exposed to weathering effects. It gives resistance to water fromantic the rains.

Been busy lately, more pictures loading
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 3:23pm On May 09, 2017
Excuzeme:
Nice job you have done.
The roof concept is beautiful.

Can you throw more light on the "Screeding" part of your work.
You buy a Screeding paint (thick whitish, plaster-like paint?) and use it to paint the Walls that have already been plastered.


Is the above correct?
Do you use paint Brush or Plaster Trowel to do this?
What does it add to the house?
Tnx.
It's done with a mixture of pop paint and pop cement. There is a different kind of trowel for its application. Yes it's applied on a plate red wall. It's purpose is to make a smoother, more aesthetically pleasing wall surface
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 12:31pm On May 08, 2017
EgunMogaji:
Good job OP. I'm very happy to see this structure and I especially the roof.

Congratulations to you and the owner on a bespoke structure.

Please don't disappoint with the finishing.

@Skimanski, oga you need to see this Sir.
Thank you very much oga @egunmogaji. I appreciate
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 12:34pm On May 04, 2017
Floor paving

Not yet finished

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 12:33pm On May 04, 2017
Floor paving

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 11:08am On May 04, 2017
GROUND FLOOR
Living room
Kitchen
Store
2 bedrooms ensuite

UPPER FLOOR
Master bedroom ensuite (same size as living room)
Madams room
Studio room/boxroom/study
Spacious roof terrace

Pictures of this will be posted

Regards,

Arc. Efe
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 10:37am On May 02, 2017
EndiaSami:
Brother mi, Boss mi.

Thank you very much. Working with you was great. The project is looking really nice. Wow.
More Blessings.
You're welcome to work with me anytime. It's my pleasure.

Arc Efe
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 5:26pm On May 01, 2017
TLAX:
What do you have in place to check heavy downpour of rain.? Seems it would collect on the terrace partly and cascade down the roof to the other compound likely.
Rain water collectors have been installed to channel the water as shown in the pictures. It takes all runoff water to the waste water collection chamber.
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 11:32am On May 01, 2017
mufutau55:
Excellent Sir.

Hajji M.
Thank you very much Hajji.
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 6:40pm On Apr 28, 2017
Exterior

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 4:42pm On Apr 28, 2017
Extrenal painting done

PropertiesRe: Please Help Me To Evaluate This Plan by EfeEj(m): 4:34pm On Apr 28, 2017
You have a 6 bedroom duplex, all rooms ensuite and cross ventilated, 2 living and 1 dining and ante room. Spacious masters room with walk-in closet. Just that you have plenty of lobby space. You are good to go.

Congratulations!

Arc Efe
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 3:46pm On Apr 28, 2017
Closer at the roof terrace

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 12:18pm On Apr 28, 2017
Roof terrace

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 11:02am On Apr 28, 2017
Fitting

PropertiesRe: Need A Virtual Office/serviced Office In Lagos? Look No Further by EfeEj(m): 10:25am On Apr 28, 2017
Pls post pictures
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 9:58am On Apr 28, 2017
olumide4christ:
I'm sure this is the BIOFIL DIGESTER SYSTEM...that's what some corporate organizations like banks (Guaranty Trust Bank for example) are using for their branches now. Seems to be better way to go for septic tank works, though I would like to see one that has lasted for 5 years upwards in order to determine its durability..


...By the way..nice job you have here....I really like your outside-the-box design, its so unique...like the say, variety is the spice of life.
Well said. Thank you very much
PropertiesRe: I Need An Achitech To Draw A Plan For A Half Plot Plant by EfeEj(m): 9:52am On Apr 28, 2017
matken:
Kindly looking for a good architect to draw a plan for a half plot of land in ikorudo.note it a plan for 1-storey building. If you got a beffiting plan whatsap andl let see
Don't look for a ready-made plan, might regret it.
Better you give an Architect your brief, he gives you options till you are satisfied.

WhatsApp 08035188042 or email greenliveprojectsltd@gmail.com

Regards,
Arc. Efe
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 11:04pm On Apr 27, 2017
Our choice bath/shower tap fitting

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 8:46pm On Apr 27, 2017
Tyrolean vs stonework

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 7:41pm On Apr 27, 2017
We are not afraid to use the color BLACK

#retrostyle #tyrolean #stonedetails

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op):
Stonework detail

Chose the black and grey black colors for the tyrolean walls to give them that rugged vs suede vibe.

PropertiesRe: Cargo Containers and Reefer Containers,40ft And 20ft For Sale by EfeEj(m): 5:05pm On Apr 27, 2017
How much for 1 container?
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 5:00pm On Apr 27, 2017
Interior

PropertiesRe: 2 Die As Building Collapses In Lekki, Lagos by EfeEj(m): 4:26pm On Apr 27, 2017
When did this happen?
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 4:24pm On Apr 27, 2017
External screed

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 4:06pm On Apr 27, 2017
My pop screed artisan pose for a pic after a long days job.

He requests for a snap saying he's proud of his job. I wonder how many of us are proud of what we do

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 3:14pm On Apr 27, 2017
Final finishes on gate after the oxide coating

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 9:04am On Apr 27, 2017
Gate works

PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 8:57am On Apr 27, 2017
buzzetin:
You are good bro, your works are exceptional
Hello Buzzetin,

I so much appreciate your comments. It encourages us to get better in the art.

Thanks again!

Arc.Efe
PropertiesRe: Construction Of 2units 4bedroom Apartment On Half Plot (pictures), Lekki Scheme2 by EfeEj(op): 11:00pm On Apr 26, 2017
Tracks in place for a roller gate

Concrete will be casted under the tracks to cater for the weight of the gate that will be mounted upon it.

1 2 3 4 5 6 7 (of 7 pages)