Hello My Good People,
I received a contravention/Demand notice from the Ministry of Physical Planning and Urban Development at my building construction in Amagba area, Benin City, Edo State. Please, any advice on how to go about it?

https://www.nairaland.com/6860261/construction-2-flats-gra-benin/1

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 9:15am On Feb 18, 2022
Plaster and window installation Complete.

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 11:33pm On Jan 22, 2022
Black Milano Stone Coated Roof Tile Roofing Project in Progress.

Thanks to Almighty God!

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m):
Hello my Good people,

I requested a quotation on my Construction Of 2 Flats At GRA, Benin City, Edo State and got these.

Stone Coated Tile Quotation for MILANO Design
Total meter 550 =
RIDGES CAPS = 52pic
VALLEY GUTTER = 11pic
Bash board =
Nails =
Sealant 4set =
Sun breaker =
Thunder arrestor =
Quotation for Water Collector's ( White)
Gutter @#18pcs =
Down Pipe@ 8pcs =
Outlet @ 8pcs =
Outside Corner @ 10pcs =
Inside corner @ 2pcs =
Gutters Connectors @ 10pcs =
Pipe Connectors @ 6pcs =
Clip @ 45pcs =
Elbow @ 35pcs =
Hanger @ 60pcs =
End cap @ 2pcs =
Accessories=
Transportation and loading=
WORKMAN =
Total =


https://www.nairaland.com/6860261/construction-2-flats-gra-benin/1#109459825

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 9:56pm On Jan 17, 2022
Complete parapet and roofing

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m):
Hello My Good people,

I need a quotation on my Construction Of 2 Flats At GRA, Benin City, Edo State:-

Stone Coated Tile Quotation for MILANO Design
Total meter 550 =
RIDGES CAPS = 52pic
VALLEY GUTTER = 11pic
Bash board =
Nails =
Sealant 4set =
Sun breaker =
Thunder arrestor =
Quotation for Water Collector's ( White)
Gutter=
Down Pipe=
Outlet =
Outside Corner =
Inside corner =
Gutters Connectors =
Pipe Connectors =
Clip=
Elbow =
Hanger =
End cap =
Accessories=
Transportation and loading=
WORKMAN =
Total =

https://www.nairaland.com/6860261/construction-2-flats-gra-benin/1#109349365

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 12:03am On Jan 14, 2022
Roofing in progress

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 7:08am On Jan 07, 2022
Iron work

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 5:08am On Jan 06, 2022
mountmoriah:
I can handle it for you

3x4x18@N3, 500 x 40pcs. = N140, 000
2x4x18@N1, 800 x 230pcs = N414, 000
2x3x18@N1, 500 x 70pcs. = N105, 000
2x2x18@N1, 100 x 500pcs = N550, 000
3" & 4" @N60, 000
Transport = N60, 000
Loading and offloading
Workmanship. = N230, 000
Grand Total. = N1,499,000
Ok, what is your contact number?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 2:41pm On Jan 05, 2022
KolaShangOne:
Kinda much. I believe you can save more money.

Are you covering with stone coated tiles or aluminium?
I’m using stone coated tiles .
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 10:28pm On Jan 04, 2022
My Good people of Nairaland,
My Contractor gave me these estimate for Roofing of a Construction 2 Flats At GRA, Benin City, Edo State.
https://www.nairaland.com/6860261/construction-2-flats-gra-benin
Hardwood (martin)
3 by 4 = 40 × 4000 = 160000
2 by 4 = 230 × 2000 =460000
2 by 3 = 70 × 1700= 200000
2 by 2 = 500 × 1200 = 600000
Bags of nail ( 4" and 3" ) =60000
Transportation/loading = 100000
Work man = 300000
Total = 1.88000

I need a reasonable estimate from anybody this group who can handle this project, please.

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 9:54pm On Jan 04, 2022
Parapet making

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 1:49pm On Dec 24, 2021
Kambols95:
Structurally, this is strange. I don't think this bricklayer of yours knows how to read Architectural plan(because no designer will use sandcrete block to replace reinforced concrete). This block-made column will never be able to withstand the concrete fascia(parapet) load, the roof load etc that it would be subjected to.

Please desist from giving your works to quacks.

Ensure you build right always, engage professional Builders. My stake
Mr.Professional,

Do you know what inside the sandblock or heard from the Builder before calling he a name?
PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 1:26pm On Dec 24, 2021
Day 10
Lintel and Pillars casting in progress.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 3:09pm On Dec 19, 2021
nannymcphee:
I do not see granite here? Do you already have granite or you intend to use sand + cement only?

What is the size of your blocks?

If it is 6", you can get already sawed 1x12, that way you don't get to pay for sawing. 2 of the sawed wood is sold for the price of 1no 1x12 wood.

Ask for a breakdown of the sizes of the wood they are buying. Watchout, what you need is 1x12, some will sell 1x10 or 1x11 for you all in the name of that's "how they cut it these days"

Go get the prices of the wood yourself, they might quote 2x2 or 2x3 for you to brace Arcs & co, you can use bamboo instead(it's cheaper)


Try to get min of 2quotes from carpenter & iron bender

Your transportation quote, ask o, does it cover loading & offloading?

Abeg o, this your 70k trip of sand, is it 4in1 or 2in1 biko?
We have granite on ground already, the size of the block is 5", I am going to the sawmill direct so as to get the correct 1×12 and the off cut from the 1×10 will be used for brace. Getting wood from sawmill is actually cheaper than from retailers. The quotation they gave is actually what am working.
The 70k trip of sand is 4 in 1.
The transportation quote covers loading.

Thank you for your feedback

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 11:29pm On Dec 18, 2021
My Fellow Good People of Nairaland,

I want to cast my lintel ,is it professionally advisable to chain the whole building or just the openings?

https://www.nairaland.com/6860261/construction-2-flats-gra-benin#108621097

Quotation for lintel
Wood =#315000
12mm rod, 80piecs, 4500 for one=360000
8mm rod=25pices ,2500 for one=62500
35bags of cement,4300 for one bag=150500
Nail=35000
Transportation from sawmill=15000
Binding wire=6000
Sawing of wood=10000
One trip of sharp sand=70000
Money for welder and carpenter=120000
Work men to do the casting=50000
Total=1194000
Grand total=1200000

I would appreciate your response on this.

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 11:22pm On Dec 18, 2021
DAY 8

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 5:41pm On Dec 16, 2021
Day 7
filling complete and gate set. To God be the Glory

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 9:23pm On Dec 13, 2021
DAY 6: Filling in progress

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 12:58pm On Dec 09, 2021
My Good people of Nairaland,

How much will it cost to fix parapet on a building measuring 22.7 by 11m? , roofing and installing milano. Please i would really appreciate the roofing project quotation and accessories.

https://www.nairaland.com/6860261/construction-2-flats-gra-benin#108266133

Thanks

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 3:39pm On Dec 06, 2021
Day 4

Please i need estimate for Milano or Roman Roofing Sheets on roof design below.

https://www.nairaland.com/6860261/construction-2-flats-gra-benin#108266133

PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op):
Day 4

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 12:10pm On Dec 06, 2021
GoodFaith:
Please I don't have time playing the guessing game
Look at the value of Naira for really
Unstable Nigeria
Over Priced land and properties like properties in Ontario Canada
I have done my part in Nigeria
Like I said I am not taking big risk
I take low risk
Nigeria Hard oh
Your Analysis of own investment house was very interesting
You failed to make the same Analysis about Nigeria
You wrote all the negative of owing property here
Buy a Land in Nigeria before you came back somebody might build house there my brother
Absolutely true! or you belong to the wrong side of the ruling power.
PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 8:46pm On Dec 04, 2021
igeoff:
Please how much is your budget for this project?
Good question, i will refer you to my Builder (+234 706 487 7995 Whatup). He said, "hard to tell."
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 3:23pm On Dec 04, 2021
My Good People, Day 4 ....
Construction 2 flats (3 Bedrooms at the front and 1 Bedroom at the back on 50x100 fts

https://www.nairaland.com/6860261/construction-2-flats-gra-benin#108206276

Your feedback are welcome.
PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op): 2:09pm On Dec 04, 2021
Iriruaga100:
How much did you get the 30ton granite? What’s the cost of digging the trench and casting?
30tons of Granite N280,000.00

Estimate for both materials and labor from setting out to filling level
Setting out=30000
Forming=30000
Labor for digging and pouring=84000
15bags of cement to cast foundation=60000
20bags for setting=80000
Work men/labour=14000
Filling sand 10trips=400000
Labour for filling=100000
12mm rod=76000
8mm rod=17500
Binding wire=3000
Iron benders=10000
7bags of cement to cast the pillers=28000
Work men to cast=7000
Ramaring=8000
1trip of sharp sand=70000
TOTAL=1.263500
PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op):
4inches concrete thickness for foundation blinding

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 5:24pm On Dec 03, 2021
My good People
Day 3

https://www.nairaland.com/6860261/construction-2-flats-gra-benin#108182175

I will appreciate your feedbacks.

Thanks
PropertiesRe: Construction Of 2 Flats At GRA, Benin City, Edo State. by Imas007(op):
DAY 3
Pegging and Digging process
Dept of trench=2fit
Coach that will go into the trench=2coach
Number of coach after foundation to filling level =4coach because of the terrean ( water lodge area )

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 10:36am On Nov 26, 2021
UC92:
Boss, Good to see you are making headway in your quest to get a working Architectural design, However I have my reservations about this particular floor plan.
1. Transiting to other spaces from the anteroom through the lounge isn't a good idea, the idea of an anteroom is to give the lounge a bit of privacy especially when important guests are meeting in the lounge, hence the essence of the anteroom in my opinion has been defeated.
2. Your lobby is a high traffic space and should have a primary source of light to reduce the possibility of accident. Find a way to lit up the lobby please.
3. Your kitchen terrace is a non functional one, there are so small that they may not even take up your door swing. Kitchen terraces usually serve as a waste collection point, where you deposit kitchen wastes, at times users even go as far as having their gas cylinders stationed at the kitchen terrace.
4. I can see some wasted spaces, I marked them red.
5. Circulation path in one of your rooms is a diagonal one and would affect the furniture arrangement and the overall space use.

Peace be with you.
Thank you very much!
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 4:00pm On Nov 25, 2021
abuiltech:
In order to have your TV wall and safe circulation, effective toilet layout, It will be nice if you can relocate few doors, wardrobe and toilet, ensure that all the toilet are been accessed from bedroom, check the attached pics for your perusal, congrats in advance, have a joyous build,
Well Noted, thank you very much!
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Imas007(m): 12:22pm On Nov 25, 2021
rotecch77:
Good suggestion, bcs to move big home furnitures or appliances will be difficult to move such around this portion
Well said, Good people.