Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by clementcro(m): 7:51am On Sep 14, 2021 |
We can build it for you in 50days max, Check this tread to see an update of something like that https://www.nairaland.com/6542974/cons-4-bedroom-duplex-bq Contact Double Edge Properties today, 08060595019 |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by HIGHESTPOPORI(m): 7:53am On Sep 14, 2021 |
With money 30 days can do it. Meanwhile watch the Champions league matches at home today by upgrading your dstv packages.check my last topic. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by hardbite(m): 7:58am On Sep 14, 2021 |
3 months to finish (1 month for the Grey shell and 1-2 months for the finishing) I'm an engineer in Owerri if you need someone to build it for you (I can show you my previous works in the town if you wish) |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Staccato001: 7:59am On Sep 14, 2021 |
@Bukad Construction Duration Estimates 1.Building skeleton i.e to roofing level = 5 weeks 2. Finishings (plastering, electrical wiring, windows/doors, tilling, screening/painting, plumbing/electrical fittings)= 6 weeks Total Duration= 11 weeks (Assuming constructed in dry season) Cost Estimates 1. Building skeleton= N9.5m ( using stone coated roofing) 2. Finishings = N13.5m (using armoured doors for main entrances, Nigerian paneled casement windows, 60*60 Italian postlene tiles in major areas, Sweethome closed couple plumbing fittings with water heaters,etc) Total= N23m ( Twenty three million Naira Only) NB: We can be reached for other professional consultancy as we have delivered such structures around South East. Thanks Are you sure about this with the present economic comatose coupled with Naira freefall? Is this quotation for 5bd duplex a present one and can you share some of your work of recent? Thanks |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by ofiko123(m): 8:07am On Sep 14, 2021 |
As fast as your money can get you.. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by spyder880(m): 8:07am On Sep 14, 2021 |
EgunMogaji2: Thank you Sir. 3 Likes |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Yemtechltd(m): 8:11am On Sep 14, 2021 |
The timeline of 3 to 4 months is achievable for this base on timelines of typical projects we've delivered with 100% finance on ground at start up, rough breakdown below: 1. Substructure(Foundation) - 2 weeks 2. Ground floor frames & walls - 1 week 3. Suspended first floor slab - 2 weeks 4. Roof carcass & covering- 1 week 5. Services (Plumbing, electrical & electrical conduit piping work) - 1 week 6. Wall, Floor & Ceiling Finishing - 6 weeks 7. Compound works - 2 weeks 8. Fixtures, fittings & painting - 1 week. Total: 17 weeks (Approximately 4months max.) Note: Some task will overlap so its achievable under 4months, but any timeline below 3months might jeopardise quality as some components require adequate timeline to cure and gain strength before removing temporary supports or applications of finishing on its surfaces. Failure to allow for those components to gain adequate strength before proceeding further are the usual causes of defects such as cracks, material Failure etc. As regards cost, finishing taste determines cost a lot, but averagely N40 to N50m will deliver a tastefully finished 5-bedroom duplex with good structural integrity. For further detailed consultation and clarity on the above you can write: Yemtech Construction E-mail: info@yemtechconstruction.com DuduParaPara: 1 Like |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by otunbateejay(m): 8:22am On Sep 14, 2021 |
DuduParaPara:Bro since u said everything about the house is ready it can take more 24 days or 1month |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Ate247(m): 8:25am On Sep 14, 2021 |
Your analysis is short and precise for a structure in South East. Not someone saying 40M For 6 month. [1quote author=Bukad post=105794171]Construction Duration Estimates 1.Building skeleton i.e to roofing level = 5 weeks 2. Finishings (plastering, electrical wiring, windows/doors, tilling, screening/painting, plumbing/electrical fittings)= 6 weeks Total Duration= 11 weeks (Assuming constructed in dry season) Cost Estimates 1. Building skeleton= N9.5m ( using stone coated roofing) 2. Finishings = N13.5m (using armoured doors for main entrances, Nigerian paneled casement windows, 60*60 Italian postlene tiles in major areas, Sweethome closed couple plumbing fittings with water heaters,etc) Total= N23m ( Twenty three million Naira Only) NB: We can be reached for other professional consultancy as we have delivered such structures around South East. Thanks [/quote] |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Skullano(m): 8:30am On Sep 14, 2021 |
3 months and half, your house is complete. I sell original and standard piping and sanitary wares (plumbing materials) at Onitsha, Anambra State and I deliver at any part of the states in the East. Nwanne, patronise me biko.. WhatsApp number: +2347039750318. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Yemtechltd(m): 8:31am On Sep 14, 2021 |
otunbateejay: Are you aware you require 28 days full strength for the suspended floor slab before striking off the temporary Formwork at the soffit? And until the Formwork is removed you cannot proceed further with finishing works on the internal part of the Ground floor. So 1month isn't realistic at all. 1 Like 1 Share |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by cedricksly: 8:31am On Sep 14, 2021 |
wman:answer his question if u can and leave this one u are saying... How many people who are expert do u think go more than front page Pushing to front page is for wider audience and more expert advise.... If na ur post shey u got talk like this? 2 Likes |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Blackdisciple(m): 8:41am On Sep 14, 2021 |
Na your money go make am fast oo. But just be carefully with the fastness so that building will not collapse later. 1 Like |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by taskcompleteng: 8:47am On Sep 14, 2021 |
Yemtechltd: I love your break down, it show you're a professional in the field. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Bahamas95(m): 8:48am On Sep 14, 2021 |
I wonder why you are so concerned about the time frame......Is there something you ain't telling us?
|
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by rotecch77(m): 8:57am On Sep 14, 2021 |
NotKnown:Done already and we handle renovation work too. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Solatium(m): 9:10am On Sep 14, 2021 |
DuduParaPara: From Earth works to stacking of blocks to decking and roofing will take you approximately 6 week's. all other finishing can be done and perfected in another 4weeks. 2½ months,you will have a fully built house ready |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by igwe18(m): 9:15am On Sep 14, 2021 |
if you gat 45m-60m depending on taste. you want to speed it up in less than 3months?,extra 3.5 or just double the labour!! |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by deleone120: 9:17am On Sep 14, 2021 |
It can be built in 16 weeks kindly send us an email @ deleonengineeringservs@gmail.com let's give you a proper break down n you can also get or profile n references |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by poiZon: 9:20am On Sep 14, 2021 |
Bukad:This duplex not bungalow, didnt u factor the deckings.... |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by valencia25(m): 9:22am On Sep 14, 2021 |
InvestmentMood: Lol... I have scrolling through the thread to see anyone disclaim that wrong quotation, i thought my eyes was deceiving after seeing his breakdown. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Zagee: 9:28am On Sep 14, 2021 |
With columns and beams approach, 2-3months |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Zagee: 9:30am On Sep 14, 2021 |
Building a house done cost oh!!! This time 4 years ago, 3m could raise your skeletal work for a 3-bed valencia25: |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Bukad(m): 9:35am On Sep 14, 2021 |
[you cantbsaybpurelu wrong when you are not into construction full time. Are you aware that getting materials directly from distributors reduces construction coat by 18%? quote author=InvestmentMood post=105794752] Purely wrong. Just my 3 bedroom duplex / paint house, I have spent over 20 million naira, yet I still need about 6 million to complete it. Let alone of 5 bedroom duplex[/quote] |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by poiZon: 9:36am On Sep 14, 2021 |
Randy111:U can finish a bungalow in 3weeks, its not carrying any load. What we r discussing is duplex. Nothing dey bungalow bros, if u get money u can finish it in 2weeks sef. The max coach a new wall can carry is 7coaches. After doing concrete for foundation, the next day u build it to german floor, after putting concrete on German floor, u allow one day pass, the next day u build it to window level or lintel. This is probably day5, use day6 for fabricating the lintels and also do the concrete works. Allow for a day to dry. Day8 u start buildng to finishing. Allow 2or 3 days, carpenter will start knocking for roof, at the same time electrical works will also start for cracking of walls and piping. A serious carpenter shouldn't spend more than 7days in the work. So approximately 16days spent. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Bukad(m): 9:37am On Sep 14, 2021 |
[you cant say by purely wrong when you are not into construction full time. Are you aware that getting materials directly from distributors reduces construction cost by almost 18%? quote author=InvestmentMood post=105794752] Purely wrong. Just my 3 bedroom duplex / paint house, I have spent over 20 million naira, yet I still need about 6 million to complete it. Let alone of 5 bedroom duplex[/quote] 1 Like |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by Ellasure: 9:39am On Sep 14, 2021 |
DuduParaPara: For excellent cement settings and construction decisions give us five to six months to deliver a good job quality. 08130470260 |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by martyns303(m): 9:51am On Sep 14, 2021 |
Bukad: https://www.nairaland.com/6642699/how-much-it-cost-build What do u think about the above topic….. |
Re: How Fast Can A 5 Bedroom Duplex Be Built In Nigeria? by kiddkash(m): 11:01am On Sep 14, 2021 |
hakeem4:what are you talking about. leave it for engineers like us. it takes 1 day to dig foundation with excavator. up to 2 days to put little concrete start and blocks depending on how many employees you have working. then another day to fill the sand in to the holes of the foundation and seal it with concrete finishing/German floor. it take up to 4 days to dry permanently. then it could take 2 to 3 days to lay the blocks from the foundation to decking level, also depends on how many employees for e.g. if you have up to 25 it will be done in two days. then carpenter comes to build the woods for decking, plus plumber comes and do his and electrician comes and pass pipe simultaneously. it wont take 2 days depends also on how many carpenters, plumbers and electrician. after that the iron castings are laid. then the concrete for decking is done. it will take at least 4 days for it to dry. after that the 25 laborers will lay blocks to roofing level in less that 3 days. then if you are doing parapet or just roofing. carpenter will take measurement within hours, assemble the woods and get it done in 2 days, them the roofing anther 2 days. then plastering of the building plus laying of tiles wont take up to 3 days. then painting. houses are built in a month depends on your pocket. your pocket determines how many laborers |
(1) (2) (3) (4) (5) (6) (Reply)
Lagos Seals Banks, Hotels, Others On Airport Road For Planning Infractions / 6 Tips To Estimate The Cost Of Building A Duplex In Nigeria / How To Do Ratification Or Regularization Of Land Under Government Acquisition
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50 |