| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 10:13am On Jan 30, 2022 |
EgunMogaji2:You mean you built an 8 bedroom bungalow On how many plots of land? |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by EgunMogaji2: 11:31am On Jan 30, 2022 |
Senomi:12,000 square feet lot in total. Main bungalow is 4,000 square foot including a 525 square foot central courtyard. I'm paying for the excesses now in finishing stage ![]() |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 12:07pm On Jan 30, 2022 |
EgunMogaji2:I don't know how square feets are calculated, I only know plots ![]() |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by EgunMogaji2: 12:31pm On Jan 30, 2022 |
Senomi:2 plots. Each plot is 50 X 120 feet. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Nobody: 3:15pm On Jan 30, 2022 |
EgunMogaji2:Oh, ok tnks |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 12:02am On Jan 31, 2022 |
EgunMogaji2:Lol. Abi ooo |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 3:59am On Jan 31, 2022 |
EgunMogaji2:Empty nester? |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 3:14am On Feb 03, 2022 |
Bringing in more sand, cement and chippings supplies here, this will be used for the concrete flooring outside this compound.........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 12:49pm On Feb 06, 2022 |
We are extending the concrete cast of the floor outside, providing spaces for flower trees to be planted as soon as rainy season starts..............
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 12:55pm On Feb 06, 2022*. Modified: 1:11pm On Feb 06, 2022 |
More pictures
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by amicdan(m): 1:15pm On Feb 06, 2022 |
Nice job boss. Just wondering no drainage for waste water? spyder880: |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 1:19pm On Feb 06, 2022 |
amicdan:There will be a drain point somewhere through the front walls, I have prepared the levels for an opening. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by ImperialCovfefe: 8:16pm On Feb 06, 2022 |
Excellent job, Engr. I especially love the frameless windows. Can the frameless windows be opened out like normal windows to let air in, for example? |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:49pm On Feb 06, 2022 |
ImperialCovfefe:Yes, they can be opened out like casement windows. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 7:46am On Feb 11, 2022 |
Our work here yesterday was to correct issues in the borehole connection, we had water pumped up from this borehole for the first time yesterday.
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 7:47am On Feb 11, 2022 |
We have cast the front of the compound, waiting to buy flower trees for this compound...........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 7:52am On Feb 11, 2022 |
We will now move to complete this swimming pool construction, and possibly test swim this pool ![]() |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Valuepaints20(m): 8:56am On Feb 11, 2022 |
Good morning sir/ma Baba ólodár yíń tí dè ó Edakú é fu wá ní ísé ó Delivery to your doorstep GET VALUE FOR YOUR MONEY 08163862804
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 10:40am On Feb 13, 2022 |
As at now, the swimming pool team are fixing the pool controls and making sure the work is done to perfection. More pictures later. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 10:43am On Feb 14, 2022 |
We serviced this pool yesterday, pumped it full with water. We only need to connect the pumps and other controls this week. More pictures later. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:48am On Feb 18, 2022 |
The swimming pool, after we let in water into it..............
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:53am On Feb 18, 2022 |
Very refreshing, especially in this hot weather..........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:07am On Feb 18, 2022 |
Concrete cast of compound walkways completed...........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:15am On Feb 18, 2022 |
Inside this house.........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:23am On Feb 18, 2022*. Modified: 7:28am On Feb 19, 2022 |
The kitchen, now fitted with a cooker unit, but some cabinets are not completed yet........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:28am On Feb 18, 2022 |
Mounting of the shower cubicles is in progress, more bathrooms to be fitted with more units in the coming days...........
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:31am On Feb 18, 2022 |
More bathrooms.......
|
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by PotatoSalad(m): 9:55am On Feb 18, 2022 |
spyder880:Baba raise the cooker to be the same height as the countertops. So that burner flames wont ruin or discolour it over time. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 10:27am On Feb 18, 2022 |
PotatoSalad:Very good suggestion bro, we just moved the cooker to the kitchen, not yet connected or used. I will lift it as you pointed out. Thanks. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by dongc(m): 9:48pm On Feb 18, 2022 |
spyder880:Would there be extractor unit over the cooker ??steam straight to the cupboard above... |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 5:26am On Feb 19, 2022 |
dongc:There will be an extractor at some point, that's why we created that space above the cooker. |
| Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by ikuku(m): 7:58pm On Feb 19, 2022 |
spyder880:Spyder abeg how much does it cost to install this bathroom/shower cubicle? |
High Ceiling 3 Bedroom Bungalow For A 30 X 120ft Half Plot Of • The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra • The Making Of The "Owerri Royal Manor" • 2 • 3 • 4
My 4 Bedroom Project • Don't Bother Building A Family Swimming Pool If It Is Not Like This (PICS) • Chinese Man Moves His House After Government Threatened To Demolish It (photos)
On how many plots of land?