Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,158,166 members, 7,835,902 topics. Date: Tuesday, 21 May 2024 at 05:11 PM

The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra - Properties (42) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra (76365 Views)

The Making Of The "Owerri Royal Manor" / The Making Of The "Akure 5 Bedroom Duplex" / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)

(1) (2) (3) ... (39) (40) (41) (42) (43) (44) (45) (Reply) (Go Down)

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:51pm On Feb 21, 2022
ikuku:

Spyder abeg how much does it cost to install this bathroom/shower cubicle?

An average of N150,000 for materials, fixing and workmanship.

3 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by IniUbom(m): 2:48am On Feb 23, 2022
How much is the oga payment for mortgage each month? Is it a fixed or variable rate?
I no bi mumu; I no bi fool o.
Knowing Naija, oga carry cost for head o! Paid in fool! Only interest - to enjoy o!
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by ikuku(m): 8:36pm On Feb 24, 2022
spyder880:


An average of N150,000 for materials, fixing and workmanship.

Thank you!

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:31am On Feb 26, 2022
My cleaning team were on duty in this house all through this week, they have cleaned the windows, the gates and other needed works.

By today, the painting crew will move in and complete the painting of this house, especially at the lower portions where we left off for the floor works to be completed before we top off on the painting.

Bathroom cubicles, bathroom doors and other remaining works are planned to start by next week.

More pictures when I visit the site next week.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by joyousmother2016: 12:21am On Mar 01, 2022
spyder880:
My cleaning team were on duty in this house all through this week, they have cleaned the windows, the gates and other needed works.

By today, the painting crew will move in and complete the painting of this house, especially at the lower portions where we left off for the floor works to be completed before we top off on the painting.

Bathroom cubicles, bathroom doors and other remaining works are planned to start by next week.

More pictures when I visit the site next week.



Can't wait to see the interior decoration of the house. Does this house have a dining room?
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:36am On Mar 01, 2022
joyousmother2016:




Can't wait to see the interior decoration of the house. Does this house have a dining room?

More pictures loading later, we are using part of the very large kitchen as a dining section, with the kitchen island providing more options.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by ImperialCovfefe: 1:59am On Mar 02, 2022
Oga spyder, Welldone.

A quick question, for the attached window, does a large window like this not pose a higher security risk in terms of breaking/entry considering the clime compared to a smaller dimension? If yes, what are the mitigating measures introduced? Thanks.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:10am On Mar 02, 2022
ImperialCovfefe:
Oga spyder, Welldone.

A quick question, for the attached window, does a large window like this not pose a higher security risk in terms of breaking/entry considering the clime compared to a smaller dimension? If yes, what are the mitigating measures introduced? Thanks.

All opening in a house, doors, windows and even walls pose a lot of security risk, there is none more risky than the other, depending on other measures surrounding the property.

3 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:38am On Mar 02, 2022
Rounding off on all painting works..........

4 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:41am On Mar 02, 2022
More......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:45am On Mar 02, 2022
More still......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mufutau55(m): 1:21pm On Mar 02, 2022
spyder880:
More......
Is the gate made by Michlins? Thx.

Hajji M.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 4:04pm On Mar 02, 2022
mufutau55:

Is the gate made by Michlins? Thx.

Hajji M.


No Sir, but he has done bigger gates for me in about 2 different sites. He may also work in one of my projects this month.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by joyousmother2016: 5:36pm On Mar 02, 2022
spyder880:


More pictures loading later, we are using part of the very large kitchen as a dining section, with the kitchen island providing more options.

Interesting. Cant wait to see the photos.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by Jeff68: 7:26pm On Mar 02, 2022
spyder880:
More......

Simply magnificent!!
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by mufutau55(m): 9:17pm On Mar 02, 2022
spyder880:

No Sir, but he has done bigger gates for me in about 2 different sites. He may also work in one of my projects this month.

Thank you Sir.

Hajji M.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 10:24pm On Mar 02, 2022
mufutau55:


Thank you Sir.

Hajji M.

Thank you my Boss.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 6:58am On Mar 03, 2022
If rain fall once lol that white go stain maybe the owner go change mind to do sketting ...nice work Spyder.. u re good

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:59am On Mar 03, 2022
donforeign:
If rain fall once lol that white go stain maybe the owner go change mind to do sketting ...nice work Spyder.. u re good

Thank you Sir.

We are going to paint some parts of the building with gray this week, the inspection chambers will be painted by today and tomorrow. My painters already moving to the site.

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by donforeign: 7:11am On Mar 03, 2022
spyder880:


Thank you Sir.

We are going to paint some parts of the building with gray this week, the inspection chambers will be painted by today and tomorrow. My painters already moving to the site.
yeah that go make sense. if need be make Dem use those burn bricks for buttom self .. baba this house dn take your time o... Na man u be

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by joyousmother2016: 10:08pm On Mar 03, 2022
spyder880:


More pictures loading later, we are using part of the very large kitchen as a dining section, with the kitchen island providing more options.



If you dont mind please What's the floor size of the kitchen? How big is it? I would love my dream home to have a large kitchen. For now i don't even have money to buy a plot of land but someday God will bless me. While praying, trusting and waiting Let me be planning on the architecture of my home.

3 Likes 3 Shares

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 6:55am On Mar 05, 2022
joyousmother2016:




If you dont mind please Whats the floor size of the kitchen? How big is it? I would love my dream home to have a large kitchen. For now i dont even have money to buy a plot of land but someday God will blessings me. While wailing Let me be planning on the architecture of my home.
I share your faith

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 9:49am On Mar 06, 2022
We bought paints and painted the inspection chambers which are around this compound......

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 9:53am On Mar 06, 2022
Another angle of this beautiful building..........

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:40am On Mar 12, 2022
Bringing in and offloading the 10 units of air conditioners we bought for this house yesterday............

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 6:43am On Mar 12, 2022
We completed the works at the swimming pool area yesterday.............

The pump is working, the lights are Ok, now ready to use.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 11:04am On Mar 15, 2022
Glass shower cubicle work in progress.
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 11:22am On Mar 15, 2022
spyder880:
We completed the works at the swimming pool area yesterday.............

The pump is working, the lights are Ok, now ready to use.
Why is the water color greenish?
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 1:24pm On Mar 15, 2022
tranxo:

Why is the water color greenish?

Well, this is just the water we used to test the pool, I am sure by the time the owner starts using the pool, there will be a better water treatment with chlorine and other pool additives.

2 Likes

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by tranxo(m): 2:08pm On Mar 15, 2022
spyder880:


Well, this is just the water we used to test the pool, I am sure by the time the owner starts using the pool, there will be a better water treatment with chlorine and other pool additives.
Okay sir
Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(m): 3:35pm On Mar 24, 2022
Buying more swimming pool equipment......

1 Like

Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by whirlwind7(m): 5:01am On Mar 26, 2022
donforeign:

yes ,,him supose even use bricks tke design the bottom of the wall, for make sense.. everything just plain... make we leave am since oag like am

Exactly!
Bricks would have made perfect sense here.
But of course, the owner has the final say.

I love the house, but I wouldn't build something like this on such small space. The house needed a lot of space around it. The swimming pool also took away the little that was left.
I admire the concept the owner brought into this though. I daresay he's spent time overseas and want something different from the norm around here. I hope there's space left for ornamental plants.

1 Like

(1) (2) (3) ... (39) (40) (41) (42) (43) (44) (45) (Reply)

Most Expensive Buildings In The World / Cost Of Digging A Borehole For Water? / Femi Osibona & Italian Architects At The Top Of Collapsed 21-Storey Building

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.