Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,162,895 members, 7,852,024 topics. Date: Thursday, 06 June 2024 at 11:42 AM |
Nairaland Forum / Nairaland / General / Politics / Second Niger Bridge: Asphalt Laying And Street Light Installation Begins (65055 Views)
Concrete Vs Asphalt Roads: Pros And Cons Of Each / VIDEO : Julius Berger Begins Asphalt Laying Of 2nd Niger Bridge, Streetlights / My Visit To Second Niger Bridge Site Onitsha Anambra State-photos (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (14) (Reply) (Go Down)
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by ehiwarior: 6:32pm On Aug 18, 2022 |
Biodun556: Them suppose slap u...road wey he suppose build since months to leave power u de praise am...u de make person de laugh self 2 Likes 1 Share |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Mrsoft3(m): 6:32pm On Aug 18, 2022 |
Biodun556: I nearly Insult you,but home training no allow me. 2 Likes 1 Share |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by GeneralDae: 6:32pm On Aug 18, 2022 |
osazsky:Easy. Dem fit just deduct am from FAAC. ASUU dey ask for salary payment for all their 6 months strike. Dat one make sense to you? 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by osazsky(m): 6:33pm On Aug 18, 2022 |
osazsky:cuz the projects looks audio 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by TheGoodJoe(m): 6:34pm On Aug 18, 2022 |
Mickykarim: We are proud of the foreign returns we will get from this bridge. Now that the Nation is struggling to finance foreign debt, we can turn to the Niger Bridge to bail us out. Smart investment. |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Creamz(m): 6:34pm On Aug 18, 2022 |
Parachoko: This is commendable from the APC government, but maybe you should Google more what Nigeria was before 1999. Most dualised Road in the country was done by the PDP government 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Amalekki: 6:34pm On Aug 18, 2022 |
Small bridge wey Goodluck Jonathan finished in just 3 months in 2012 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by SmartPolician: 6:35pm On Aug 18, 2022 |
Parachoko: You must really be a baby when Obasanjo was president. So, I will forgive you when you write nonsense. First, Obasanjo did a lot of Trunk A roads, Abuja national stadium, national mosque and Christian center, etc. Obasanjo set up many of the agencies we know today, including EFCC, ICPC, NDDC, etc. When Malam Nuhu Ribadu imprisoned his boss, Tafa Balogun, the world gave Obasanjo a standing ovation for his war on corruption. He strengthened the banking sector, thereby making weak Nigerian Banks some of the strongest on the continent. Obasanjo built many power stations, including Omotosho, Olorunsogo and Geregu power stations. Obasanjo and NOI got Paris Club to cancel Nigeria's debt of $32 billion. When that man was leaving office, our foreign debt was infinitesimal. When flour became expensive in 2005, the Obasanjo administration introduced a law that will compel bakers to add 10% cassava powder to bread to reduce the demand for flour. That man had lofty ideas. We also know how his policy made us to enjoy the GSM we use today. Obasanjo significantly increased our foreign reserves. I don't think you need a lecture on what this does to your FDI. Obasanjo was a media-friendly president. He would come on radio and TV to take direct questions from Nigerians and answer them himself. This is something your Buhari has never done. I love Obasanjo's sense of humour. Unlike useless Buhari that was touring the world and wasting tax-payers' money, Obasanjo was practically touring the world to ask foreign investors to come and invest in Nigeria that Nigeria had returned to democracy with a stable economy. I can go on and on. The only challenge of Obasanjo was that there was no social media in his time. If not, we would have documented these achievements ourselves. 3 Likes |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Invitationn: 6:36pm On Aug 18, 2022 |
TheGoodJoe:So unsophisticated to say the least. Why was the bridge not built when the economy was blooming - if it ever bloomed? Your analogy is faulty. Infrastructure aids economic growth in the long run. Imagine the cut in the travel time when the bridge is done. Think of the economic boost it'd give the region. 3 Likes |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by osazsky(m): 6:36pm On Aug 18, 2022 |
GeneralDae:if it has been budgeted for they should be paid cuz govt decieved them for 8 years..every sector was paid minimum wage areaas apart from uni..in Europe when union go on strike govt pays them too same with America.. uni really never ready to open.they will get all thier salaries that's y it's a union..and apc dont know this..well they dont know anything.. |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by 07kjb: 6:37pm On Aug 18, 2022 |
Biodun556: So just one bridge that is not upto 30km that have lasted for seven years is what u are tagging as the best in infrastructure Nawao 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by xevove2061: 6:37pm On Aug 18, 2022 |
Mickykarim: my brother, I am better than you in all ramifications. This i can "beat my chest to". I also know you are not financially better off than I am.. As long as your monthly take home is not up to 10m before tax, you are shit to me.. 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by GeneralDae: 6:37pm On Aug 18, 2022 |
osazsky:Audio?? First Pic is Apapa under PDP Second Pic is APAPA under APC. Guy forget, APC fit dey perform average for infrastructure still, but dem beat PDP hands down. 3 Likes
|
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by popodaa159: 6:38pm On Aug 18, 2022 |
Theunbothered: i said the road is 13km..bridge is less than 400m ..the 2nd niger bridge alone is 1.6km(6 lane)..the single pillars on the bridge is wider than the entire bridge on the trans kalabari road.. you cant compare the depth of the niger river to the one across the trans kalabari road there is no argument here please simply say you despise the project it was done by PMB 5 Likes
|
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by drlateef: 6:39pm On Aug 18, 2022 |
PresidObi: Even when PDP their party did not provide any infrastructure for southeast? 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by RepoMan007: 6:39pm On Aug 18, 2022 |
Biodun556:Osun state too was number one until oil allocation fell and they couldn't pay salaries. Just saying. 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Ajibocode1: 6:39pm On Aug 18, 2022 |
Biodun556: Lie he is not number one majority of what buhar accomplishes today was Jonathan work |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by BreakingNews21: 6:39pm On Aug 18, 2022 |
The haters done descended into the thread strong and heavy. A giant historic project in the south-east region is reaching completion and dem still mad. I must pass out some cool drinks. haterade na Someone else can bring some palm wine to celebrate the event for the adults.
|
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by jrusky(m): 6:40pm On Aug 18, 2022 |
I think this is not bad project but they should pls try and finish it on time. |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Elliotwaveforec: 6:40pm On Aug 18, 2022 |
casualobserver: I don't like him because of his nepotism and his foolish fulanisation agenda; but he has tried for infrastructures. This is Agbara Badagry Expressway, Lagos state. Good job! 1 Like
|
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by TheGoodJoe(m): 6:40pm On Aug 18, 2022 |
Invitationn: You people keep talking this fake mediocre points looters have filled your heads with. Investment is what will bring returns brings economic growth. No family can grow economically without investing in a business that will bring returns. If anyone wants economic growth, you invest in where you get returns before talking of bridges. Now there is no revenue, is it not pathetic that the only solution is to tax individuals and businesses. That means, the so called infrastructure can not bring economic boost. Invest in the people and businesses to get economic boost. Think basic economics. |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by osazsky(m): 6:40pm On Aug 18, 2022 |
GeneralDae:oga like I said I am not seeing anything..just cuz u want to do a 9km road u carry cement go 5k..carry houe rent go 400k..cars we were buying for 1.8m is now 5m..u meet dollar for 175 carry am go 700..meet fuel at 87 carry am go 200 naira bag of rice from 7500 to 40k just because u wan do road and u nor increase salary does this make any sense oga 3 Likes |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by GeneralDae: 6:41pm On Aug 18, 2022 |
osazsky:Any union or body that goes on strike should not be paid for simply going on strike. It makes no sense whatsoever. They can only be paid what they were owed before the strike. 2 Likes |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by AbleGodsolution(m): 6:42pm On Aug 18, 2022 |
How?? Please enlighten me Sixfiguresmart: |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Jonegonu: 6:43pm On Aug 18, 2022 |
SpatialKing:. All in eighth years |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by victorazy(m): 6:43pm On Aug 18, 2022 |
God bless Yaradua and Jonathan. |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Jonegonu: 6:44pm On Aug 18, 2022 |
colestephan86:good question |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by sleemomymy: 6:44pm On Aug 18, 2022 |
PresidObi:You are a chronic liar. You have changed tactics from audio project. 1 Like |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by osazsky(m): 6:44pm On Aug 18, 2022 |
GeneralDae:u dont know the meaning of union..ask America they will explain beter also ask ur apc king Adam's oshiomole.i dont even see uni resuming till after election..cuz the money budgeted for salaries has been diverted for elections..so make student patient..I thrust assu they can crumble the system for 3 years until demands are met and all salaries paid.its a system |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by GeneralDae: 6:45pm On Aug 18, 2022 |
victorazy:God bless Yar Adua for thinking about it. God bless Jonathan for starting it on power point. 2 Likes |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by effort1: 6:45pm On Aug 18, 2022 |
Biodun556: Biodun556 is the real liar |
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by victorazy(m): 6:45pm On Aug 18, 2022 |
GeneralDae: God bless you. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (14) (Reply)
Youths Destroy Tinubu's Campaign Banner In Osun / Osun Assembly Replies Demola Adeleke On The Change Of The State's Name / Atiku Releases ‘Evidence’ Of Election Result From INEC Website
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 60 |