The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process - Properties (18) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process (42138 Views)

Can ₦2M Finish The Construction Of A 2-Bedroom Flat? / Construction Process Of Our Bungalow Apartments. / CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE (2) (3) (4)

(1) (2) (3) ... (15) (16) (17) (18) (19) (20) (21) ... (33) (Reply) (Go Down)

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:25am On Aug 11, 2022
Production of ceiling boards in progress........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:39am On Aug 11, 2022
Some pictures of this ongoing finish showing the roof, parapet and wall plastering before the window designs.............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michlins(m): 8:26pm On Aug 11, 2022
Being made a part of this project will be a dream come true

1 Like

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by mildteddy(m): 3:34pm On Aug 12, 2022
What is the size of the land for this project?
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:24pm On Aug 13, 2022
mildteddy:
What is the size of the land for this project?

This land should be about 1000 square metres.

1 Like

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:55am On Aug 14, 2022
Hanging ceiling boards...........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:57am On Aug 14, 2022
More from this site.........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 2:56pm On Aug 14, 2022
We are poised to start doing the windows of this house starting from tomorrow. We will be combining the 3 sets of workers in this house,
Plastering crew
Ceiling crew
Windows team

More pictures later.
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by omanzo02: 10:11pm On Aug 15, 2022
spyder880:
Plumbing piping works..........
Hi Spyder,
For plumbing work, what sizes of pressure pipe is suitable fold hot and cold water taps, shower, sink and toilet drainage?
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:33pm On Aug 15, 2022
omanzo02:

Hi Spyder,
For plumbing work, what sizes of pressure pipe is suitable fold hot and cold water taps, shower, sink and toilet drainage?

4" for waste drainage
2" for floor drain
2" for wash hand basin drainage
1" or 3/4 for cold water supply
3/4 or 1/2 for hot water pressure pipes.

1 Like

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by omanzo02: 5:52am On Aug 16, 2022
spyder880:


4" for waste drainage
2" for floor drain
2" for wash hand basin drainage
1" or 3/4 for cold water supply
3/4 or 1/2 for hot water pressure pipes.

Ok, Thanks!

1 Like

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:21am On Aug 16, 2022
Updates from our works on the ceilings of this house.............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:25am On Aug 16, 2022
More pictures from the ceiling yesterday.........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by ImperialCovfefe: 1:34pm On Aug 17, 2022
spyder880:
We are poised to start doing the windows of this house starting from tomorrow. We will be combining the 3 sets of workers in this house,
Plastering crew
Ceiling crew
Windows team

More pictures later.
Bro, can you throw more light on the windows cost? Thanks
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 1:26pm On Aug 19, 2022
spyder880:
More pictures from the ceiling yesterday.........

Nice. How much per sqm
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:52pm On Aug 19, 2022
rukyboy:


Nice. How much per sqm

Still working on the costs.
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:53pm On Aug 19, 2022
We are completing the second wing of the house, internal plastering.

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:58pm On Aug 19, 2022
More.........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:16am On Aug 21, 2022
Yesterday at this site as we move forward with the finish of this house.............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:18am On Aug 21, 2022
More internal works...........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:20am On Aug 21, 2022
More ceilings from various rooms and flats.............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:23am On Aug 21, 2022
More..........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:08am On Aug 23, 2022
We have completed every plastering works here on this site, we are now waiting for the arrival of windows so we can hang the windows and dress them in.

The ceiling crew are moving fast, almost completed 2 flats, more works going on today.

More pictures from this site later today.
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:34am On Aug 24, 2022
Work is still ongoing here at this site, I will be going to see the windows man this afternoon...........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 4:13pm On Aug 28, 2022
spyder880:
We have completed every plastering works here on this site, we are now waiting for the arrival of windows so we can hang the windows and dress them in.

The ceiling crew are moving fast, almost completed 2 flats, more works going on today.

More pictures from this site later today.


I thought windows are usually fixed before plastering is done. Especially casement windows
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:37am On Aug 29, 2022
rukyboy:



I thought windows are usually fixed before plastering is done. Especially casement windows

That's only when you're using sub frames. You fit the sub frame and dress them in neatly, then bring the windows and fit later. In this method we are building window frames with the glass intact, we complete wall plastering, then hang the windows and now dress them in neatly. The final work is to create the chosen wall designs outside, like wall marking, or window hoods.
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:38am On Aug 29, 2022
More windows are being coupled together for this building..............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 4:05pm On Aug 31, 2022
Producing more cornice and ceiling skirting for this building...........

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 4:07pm On Aug 31, 2022
Balconies, dining rooms.............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 4:09pm On Aug 31, 2022
Staircase............

Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 12:22pm On Sep 01, 2022
Engineer, at which locations in this building do you use cornice instead of POP?

spyder880:
Producing more cornice and ceiling skirting for this building...........
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:10am On Sep 02, 2022
folyshow:
Engineer, at which locations in this building do you use cornice instead of POP?


Under the deckings.

(1) (2) (3) ... (15) (16) (17) (18) (19) (20) (21) ... (33) (Reply)

Prince Ebeano Supermarket In Lekki On Fire / How Much Will I Need To Roof This 3 Bedroom Bungalow - / What Are The Pros And Cons Of Flat Roof Design In Nigeria

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.