Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by donforeign: 2:49am On May 11, 2024
spyder880:
The compound, before we start the concrete floors...........
no be small funds dn enter here Sha.. njce work spyder
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by jmoore(m): 1:20pm On May 18, 2024
spyder880:
Concrete floor stamping ............
Bros, please how can I patch this by myself?

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:03am On May 20, 2024
jmoore:
Bros, please how can I patch this by myself?
Is this an under decking?
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by jmoore(m): 8:21am On May 20, 2024
spyder880:
Is this an under decking?
I don't know the terminology. But it should be under decking. It is a 2 story building. I took the picture while standing at the ground floor and looking up.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:21am On May 20, 2024
jmoore:
I don't know the terminology. But it should be under decking. It is a 2 story building. I took the picture while standing at the ground floor and looking up.
You can always patch a wall, but an under decking might be more tricky as the force of gravity will be working against you, especially if you're not trained in plastering. But you can try, it might be difficult, but doable.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Deeegbee: 11:32am On May 20, 2024
spyder880:
Compound landscaping going on here.............

More pictures later
Oga Spyder880, please how much in estimate can complete 3 bedrooms down and 3 bedrooms upstairs on a 60 by 60 plot?
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by tranxo(m): 6:46pm On May 21, 2024
spyder880:
Washing and cleaning out some completed rooms in this house..........
Chief I noticed that windows are generally becoming narrower these says. Is it because they are the push-out type?
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:38pm On May 21, 2024
tranxo:
Chief I noticed that windows are generally becoming narrower these says. Is it because they are the push-out type?
Yes, push out type windows are becoming less wide, although longer these days.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:27am On May 23, 2024
Concrete floor stamping in progress here..........

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by moneylatalks: 7:54am On May 23, 2024
Congratulations... E no easy .... Please

19 plots along Asaba/onitsha express way opposite B Division Asaba Delta state.
N900M Asking
0$
803-535836-4

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:48am On May 24, 2024
Floor concrete cast, with stamping ...............

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:23am On May 24, 2024
Stamping process...........

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:25am On May 24, 2024
House front.........

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:27am On May 24, 2024
Inside the compound..............

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:30am On May 24, 2024
Closer on this completed building...............

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by dongc(m): 10:43am On May 25, 2024
Min Oga...jisike sir ...
Looking at this picture considering slope and tilt ..are there no risk with rain water going in with this level... or maybe this Pic doesn't depict accurate level..

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:24am On May 26, 2024
dongc:
Min Oga...jisike sir ...
Looking at this picture considering slope and tilt ..are there no risk with rain water going in with this level... or maybe this Pic doesn't depict accurate level..
It depicts the actual level. The land is very much sloped to the back, water flow will be controlled by the use of a gutter behind the house to channel water into a bigger gutter at the back.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 2:58pm On Jul 10, 2024
Apart from one or two touch ups, this project is almost completed. Handing over soon.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:50pm On Jul 18, 2024
Completing the works in this house...........

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:52pm On Jul 18, 2024
More pictures

Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by donforeign: 5:40am On Aug 04, 2024
Am yet to see pipes surrounding the building unlike most but you see pipes around and it's annoying.. nice job
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:45am On Aug 04, 2024
donforeign:
Am yet to see pipes surrounding the building unlike most but you see pipes around and it's annoying.. nice job
We dis conduit piping of waste for this particular building. grin

Welcome.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men:
Boss are these installed prepaid meter single-phased? Is it worth it to install 3 phased meter considering the cost of wire and other things.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:50pm On Aug 19, 2024
How much did the duct metal covering cost, compared to aluminum type
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by michlins(m): 6:38am On Aug 20, 2024
Gen2men:
How much did the duct metal covering cost, compared to aluminum type
I did those. They were not cheaper but the owner specifically requested for them
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:07pm On Aug 20, 2024
michlins:
I did those. They were not cheaper but the owner specifically requested for them
Okay thanks
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:46pm On Aug 21, 2024
Gen2men:
Boss are these installed prepaid meter single-phased? Is it worth it to install 3 phased meter considering the cost of wire and other things.
They are 3 phase meters.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 9:52pm On Aug 21, 2024
spyder880:
They are 3 phase meters.
OK
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Badgers14: 8:17pm On Oct 11, 2024
spyder880:
Yes, I have my plastering team, ceiling team, screeding team, electrical team all working now, the door crew will arrive this weekend, to work with the windows guys, then all windows and doors will be dressed same time.

We are already moving for tiles and sanitary wares. Welcome.
Oga Spyder880,

Please how many bags of cement was used in the plastering of this house ( both internal and external)?
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:09am On Oct 12, 2024
Badgers14:
Oga Spyder880,

Please how many bags of cement was used in the plastering of this house ( both internal and external)?
This will e difficult to calculate, because I bought cement in 4 stages of the work, and from the same supplies we were doing some other works in the site. Let's say about 250 bags or more.
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Badgers14: 8:53am On Oct 12, 2024
spyder880:
This will e difficult to calculate, because I bought cement in 4 stages of the work, and from the same supplies we were doing some other works in the site. Let's say about 250 bags or more.
Ok, thanks..

Someone in my WhatsApp group is undertaking a similar project.. dude was crying about the cement usuage...

The plastering guys used 104 bags to plaster just the ceiling of the 2 deckings( first decking : from ground floor to first floor, and second decking from first floor to second floor).

He said he purchased 350 bags of cement and they are calling him that they need more cement. The fence have not been plastered, they have not plastered the interior of the second floor, doors and windows have not been been dressed.

So basically the 350 bags, was used to plaster the interiors of the ground floor and the first floor and the exterior ( only the exterior of the back of the building , one side of the building and half of the front of the building have been plastered).

The project is 2 decking just like you have here..

I was feeling his pains, I thought 350 bags should have been enough to complete the plastering of a 2 storey building..

Wouldn't you think so?
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op):
Badgers14:
Ok, thanks..

Someone in my WhatsApp group is undertaking a similar project.. dude was crying about the cement usuage...

The plastering guys used 104 bags to plaster just the ceiling of the 2 deckings( first decking : from ground floor to first floor, and second decking from first floor to second floor).

He said he purchased 350 bags of cement and they are calling him that they need more cement. The fence have not been plastered, they have not plastered the interior of the second floor, doors and windows have not been been dressed.

So basically the 350 bags, was used to plaster the interiors of the ground floor and the first floor and the exterior ( only the exterior of the back of the building , one side of the building and half of the front of the building have been plastered).

The project is 2 decking just like you have here..

I was feeling his pains, I thought 350 bags should have been enough to complete the plastering of a 2 storey building..

Wouldn't you think so?
I will need to go back to this house expenses records to confirm the actual cement usage. I had everything written down. I will consult my records later today.
1 2 3 ... 16 17 18 19 20 Reply

The Making Of Asaba Stepped Up Two Storey Building. COMPLETED !!! • The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" • New Construction Of A Block Of 6 Flats Of 2 Bedrooms In Enugu East. • 2 • 3 • 4

Christmas Tragedy: Landslide Kills 3 In Abuja, Injures 3 Others • Man Loses Baby In Imo Building Collapse,Escaped With Only Wife & 2 Clothes.PICS • Free 5 Bedroom Bungalow Design and 3D For Nairalanders