My 4 Bedroom Project - Properties (11) - Nairaland
Nairaland Forum › Nairaland General › Properties › My 4 Bedroom Project (92922 Views)
1 2 3 ... 8 9 10 11 12 13 14 ... 24 Reply (Go Down)
| Re: My 4 Bedroom Project by Dominionng(m): 8:44am On Jun 23, 2016 |
It is called Dado rails or Chair rails. Let me drop this picture here, hoping it guides you during your painting. Dominion.
|
| Re: My 4 Bedroom Project by bplenty(op): 11:45am On Jun 23, 2016 |
@Larwin I am hoping the designs will radiate the pop finishes after its been done and painted. Wnen it gets to that stage I shall put it on here. @dominionng True thats the correct follow up photo for what it shall look like when all has been neatly done. All correct sir. ![]() |
| Re: My 4 Bedroom Project by Larwin(m): 12:40pm On Jun 23, 2016 |
Dominionng:It's a woow. It shows class... |
| Re: My 4 Bedroom Project by ricki: 12:50pm On Jun 23, 2016 |
Larwin:pick ur fone na |
| Re: My 4 Bedroom Project by ricki: 12:57pm On Jun 23, 2016 |
bplenty:how much dem buy those doors i want to buy some too ... |
| Re: My 4 Bedroom Project by Larwin(m): 4:35pm On Jun 23, 2016*. Modified: 9:12pm On Jun 23, 2016 |
ricki:Sorry sire, have been on the field, would have returned your call but u restricted me from seeing your number. Kindly call back or gimme your line. Thanks |
| Re: My 4 Bedroom Project by bplenty(op): 9:45pm On Jun 23, 2016 |
@ricki The doors were bought from Ibadan by @kolashangeone for 30k each. They are called Mdx doors if I recollect from memory. Be in contact with @kolashangeone for more insight cheers |
| Re: My 4 Bedroom Project by bplenty(op): 10:22pm On Jun 23, 2016 |
@larwin Just out of curiosity. Could you kindly tell me how much it costs for your borehole drilling services please. My site is at Arigbajo, Ifo. I may look into that aspect now if your charges are considerable. Cheers. |
| Re: My 4 Bedroom Project by Larwin(m): 10:41pm On Jun 23, 2016 |
bplenty:Oh, ifo. Please can we talk on phone maybe WhatsApp . Dat will be a little better than here. Thanks |
| Re: My 4 Bedroom Project by bplenty(op): 12:13am On Jun 24, 2016 |
Hi @larwin please send your number here. |
| Re: My 4 Bedroom Project by olumide4christ: 2:05am On Jun 24, 2016 |
bplenty:Look at the bottom of his quotes. His phone number is there, in the signature - 0803701..... |
| Re: My 4 Bedroom Project by bplenty(op): 2:40am On Jun 24, 2016 |
Thanks very much @olumide4christ. I got it from his signature. Cheers. |
| Re: My 4 Bedroom Project by Larwin(m): 7:55am On Jun 24, 2016*. Modified: 8:47am On Dec 06, 2017 |
Thanks olumide4christ @bplenty I will be waiting for yr message or call. So as to. Discuss better. 08060288869 Regards. |
| Re: My 4 Bedroom Project by bplenty(op): 8:52am On Jun 24, 2016 |
Thanks @Larwin. Will add u up for a chat. Cheers. |
| Re: My 4 Bedroom Project by Larwin(m): 11:15am On Jun 24, 2016 |
bplenty:I feel you bro. |
| Re: My 4 Bedroom Project by bplenty(op): 12:26pm On Jun 24, 2016 |
Your welcome chief @larwin |
| Re: My 4 Bedroom Project by bplenty(op): 1:44am On Jun 25, 2016 |
The doors has finally been fixed by @kolashangeone and his boys. However one of the doors for the toilet was meant to be 2ft 6. There was a mistake so it came out as 2ft 3. Other doors to the rooms are 3ft. They internals from @kolashangone has been finally completed. The next phase is the POP that will commence next week. Again thanks to all the contributors. Your comments are highly welcomed. Cheers.
|
| Re: My 4 Bedroom Project by KolaShangOne(m): 5:38am On Jun 25, 2016 |
Some few doors have width issues and will be changed completely. |
| Re: My 4 Bedroom Project by bplenty(op): 9:07am On Jun 25, 2016 |
Thanks @kolashangeone when r you planning on changing them doors please? |
| Re: My 4 Bedroom Project by Larwin(m): 11:36am On Jun 25, 2016 |
Good job @kolashangeone |
| Re: My 4 Bedroom Project by ricki: 4:40pm On Jun 25, 2016 |
KolaShangOne:That means the frame comes out too? The best way I know dem dey do this at iyana ipaja sawmill is both doors, frame and keys are all fix right there left to be transported to site. THats is i think the best way for locally made doors and the bricklayer had to work around the fully made door+frame and not the other way round...... But meanwhile: Application for Tender can we have de ones removed Sire?? ![]() question tendered with upmost respest...... ofcourse |
| Re: My 4 Bedroom Project by Larwin(m): 4:59pm On Jun 25, 2016 |
Oga ricki am still expecting yr call o |
| Re: My 4 Bedroom Project by bplenty(op): 11:32pm On Jun 25, 2016 |
@Ricki thanks for the input. Yes all the whack doors that were by initially resized from 3ft will be changed as @kolashangeone has agreed to this. Thanks. |
| Re: My 4 Bedroom Project by bplenty(op): 11:49am On Jun 26, 2016 |
............... |
| Re: My 4 Bedroom Project by mufutau55(m): 3:03pm On Jun 26, 2016 |
ricki:@Ricki Can you post some of the pictures from the Iyana Ipaja Sawmill area you mentioned. I will appreciate it sir. Thanks. Hajji M. |
| Re: My 4 Bedroom Project by bplenty(op): 10:52pm On Jun 26, 2016 |
@ricki It would be nice if you can please post them pictures. Thanks. |
| Re: My 4 Bedroom Project by ricki: 7:53pm On Jun 27, 2016*. Modified: 8:30pm On Jun 27, 2016 |
bplenty:Oga mi, I dey Stamford bridge right now o I have a place around ipaja so i rummage around there a lot when i enter town.but i can send my guys to go and take a picture for you. Every time we get doors from there that the way we do it. It is a better concept even the frame is built around the doors. Giving it a nice finish, squared and not expensive at all. check this out https://www.nairaland.com/1799959/re-pictorial-representation-kitchen-cabinet for me it is important to get thing right first time and all of that comes from experience..... Simply tell your carpenter to build ( if you dont mind ) frame around a new set door before fitting them into the wall. Simple mate just like in the picture |
| Re: My 4 Bedroom Project by bplenty(op): 9:50pm On Jun 27, 2016 |
I swear to God if I had initially seen this thread before now I could just have gone for this one. Thanks again @ricki for sharing. |
| Re: My 4 Bedroom Project by bplenty(op): 10:47pm On Jun 27, 2016 |
Updates : Frames for the window nets were delivered to the site this past weekend. Photos coming through soon. I contacted @Larwin and his boys to do a research on my site to see if borehole drilling would work. Research/results will be delivered in 24 hours.
|
| Re: My 4 Bedroom Project by bplenty(op): 10:50pm On Jun 27, 2016 |
More photos.
|
| Re: My 4 Bedroom Project by bplenty(op): 11:05pm On Jun 27, 2016 |
Pictures of the painted bulglary windows.
|
| Re: My 4 Bedroom Project by Larwin(m): 2:20pm On Jun 29, 2016 |
@bplenty, thanks for the opportunity to work for you.... Let's move to the next step in a short while. |
My 4 Bedroom Under Construction. • 3 Bedroom Project At Shimawa, Expert Needed. • Urgent Enquiry On A 3 Bedroom Project • 2 • 3 • 4
31-Year-Old Landlady: 'I Built This House With My Money, Not With My Body' • Owerri Collapsed Building: Before And After Photos • New Houses I Saw In Villages In Imo State Today - Photos

i want to buy some too ...