Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX (33714 Views)

Cost Of Constructing A Mini Swimming Pool / Contemporary Architecture: The Story Of Our 4 Bedroom Duplex By Skimanski / 1400 Sqms Of Corner Piece Land For Sale Arcadia Grove Estate At Osapa London Lek (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (11) (Reply) (Go Down)

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:07pm On Aug 17, 2016
msogunro:


Approximately how many cubic meters/feet/yards of concrete did it take you to fill foundation form?


57.63 m3 (Cubic Meter)
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:08pm On Aug 17, 2016
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words

architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems)
Dezyns and Structures.

Architect Jude O. Odemwingie.
email: jude@dnstructures.com
email: skimanski4life@yahoo.com
website: www.dnstructures.com
Tel; 08038390386 or 08185174782
follow us on Instagram: @ dezynstructures


Kindly take your time to Follow our numerous professional works on every page of these links below

https://www.nairaland.com/1164230/best-architectural-interior-construction-works
https://www.nairaland.com/2067260/lekki-gardens-finishings
https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex
https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction
https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension
https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4
https://www.nairaland.com/2770635/construction-works-units-flats-new
https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension
https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by msogunro: 8:50pm On Aug 17, 2016
skimanski:



57.63 m3 (Cubic Meter)

Thanks Skimanski.

I've seen concrete mixer trucks in Lagos and I've seen it used on one of the Nairalnad builds. For such a large quantity of concrete, why aren't concrete mixer trucks used over manual mixing and dumping?

I imagine there would be significant benefits in filling the forms in a few hours than filling it in a day or two - efficiency, better quality monolithic concrete pour. I don't know their cost so that may be the reason why its not widely used.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:16pm On Aug 17, 2016
msogunro:


Thanks Skimanski.

I've seen concrete mixer trucks in Lagos and I've seen it used on one of the Nairalnad builds. For such a large quantity of concrete, why aren't concrete mixer trucks used over manual mixing and dumping?

I imagine there would be significant benefits in filling the forms in a few hours than filling it in a day or two - efficiency, better quality monolithic concrete pour. I don't know their cost so that may be the reason why its not widely used.



The cost of Concrete from Mixer Trucks is more than that of the manual ones. The advantage over Manual Labour mix is Speed. Its way faster for sure. So as a result where its advantage can be significant is if you have a lager size of concrete requirement and little time to complete concrete cast, then you can opt for mixers. except you have money to show off.

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by msogunro: 9:44pm On Aug 17, 2016
skimanski:




The cost of Concrete from Mixer Trucks is more than that of the manual ones. The advantage over Manual Labour mix is Speed. Its way faster for sure. So as a result where its advantage can be significant is if you have a lager size of concrete requirement and little time to complete concrete cast, then you can opt for mixers. except you have money to show off.

The manual mixer is faster? I would have thought the truck is.

Same quality in the mix and monolithic foundation I assume.

Approximately how much do you think you would have paid to fill the forms had you used the truck mixer?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:44pm On Aug 17, 2016
Conclusion of filling as we prepare for Mechanical and Reinforcement works.

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by twinskenny(m): 9:47pm On Aug 17, 2016
Good job boss
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:54pm On Aug 17, 2016
msogunro:


The manual mixer is faster? I would have thought the truck is.

Same quality in the mix and monolithic foundation I assume.

Approximately how much do you think you would have paid to fill the forms had you used the truck mixer?


I mean it has a speed advantage over manual labour mix. Meaning its faster than manual labour mix.


Truck Mixers can be as much and 21,100/m3

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 4:12am On Aug 18, 2016
skimanski:
Conclusion of filling as we prepare for Mechanical and Reinforcement works.

Good work. How many days of filling with water before casting the DPC?

When are you planning the casting of the DPC considering the logistics challenge you mentioned?

Did you do a soil test or how did you arrive at the foundation design?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 7:45am On Aug 18, 2016
Beulah09:


Good work. How many days of filling with water before casting the DPC?

When are you planning the casting of the DPC considering the logistics challenge you mentioned?

Did you do a soil test or how did you arrive at the foundation design?


We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately

There was no need for soil Test done because it's a storey building and we could assume the land was solid enough from the surrounding. Also the estate have okayed the land for construction. Soil Test is required when you have above 2 floors in such an area.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 7:46am On Aug 18, 2016
Beulah09:


Good work. How many days of filling with water before casting the DPC?

When are you planning the casting of the DPC considering the logistics challenge you mentioned?

Did you do a soil test or how did you arrive at the foundation design?


We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately

There was no need for soil Test done because it's a storey building and the estate have okayed the land for construction in a memo that contains the building codes. According to the estate documents, Soil Test is required when you have above 2 floors.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 3:37am On Aug 19, 2016
skimanski:



Never will I be involved in a leaking Pipe. Not after the all my years of renovation.

Now that you are ready for casting, is there any test that is conducted to confirm that none of the pipes are leaking? Something like a leak detection test?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:46pm On Aug 19, 2016
Beulah09:


Now that you are ready for casting, is there any test that is conducted to confirm that none of the pipes are leaking? Something like a leak detection test?


There is no need doing a Leak Test on the pipes run. Its as simple as just Pouring water and ensuring it links out.

This is it. Pipes that require more technical Leak Test is the pressure/Supply Pipes. Waste pipe never have water on them except when you flush. or waste water. This is unlike the supply pipes that have water constantly waiting to be released. Whats important when installing waste and soil pipes is to ensure you use the Thickest and more solid version, seal properly, and Ensure when your pour water it drains out via its outlet.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:48pm On Aug 19, 2016
Complete Reinforcement and Mechanical Works for drains as we prepare for concrete Cast.

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 4:27am On Aug 22, 2016
Was the DPC casting done or was it postponed?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:25pm On Aug 22, 2016
Beulah09:
Was the DPC casting done or was it postponed?


DPC Was done as promised. Pictures below.

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:28pm On Aug 22, 2016
And today we resume Brick Works

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Maryam: 2:10pm On Aug 23, 2016
How many numbers of blocks do you think will be used for this build
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by pato405(m): 3:05pm On Aug 23, 2016
where exactly is this estate? and what's the cost of a plot here? any idea pls?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 10:35pm On Aug 23, 2016
pato405:
where exactly is this estate? and what's the cost of a plot here? any idea pls?

Arcadia Groove Estate. Femi Okunu St. Off the road beside the new Shoprite in Lekki.

Land can be above 50m for a Plot.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 10:41pm On Aug 23, 2016
More on Brick Works

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 11:15pm On Aug 25, 2016
Lintel Level for brick works as we resume wood works on Reinforcement

2 Likes

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:09pm On Aug 31, 2016
PICTURES FROM OVER THE WEEKEND.

Lintel and Pillar Works

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:35pm On Aug 31, 2016
.

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:44pm On Aug 31, 2016
Pictures as we conclude columns and lintel and complete our brick works for ground floor in preparation for our First Floor Deck.

2 Likes

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:52pm On Sep 01, 2016
Resumption of Deck Works

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:53pm On Sep 01, 2016
.

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 8:50pm On Sep 02, 2016
Flooring of Deck. View from Underneath

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 12:04am On Sep 03, 2016
Moving very fast.

Any reason why you are not using marine board for the decking? Could see that you used marine board for the raft.
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(m): 9:23am On Sep 03, 2016
Beulah09:
Moving very fast.

Any reason why you are not using marine board for the decking? Could see that you used marine board for the raft.

We are using the wood we have on site, no need buy new boards. Which is some pieces of Marine Board and some pieces of 1 x 12 wood. Not necessarily one particular material. What is important is that the wood gives us our straight Deck. Even if not smooth because at the end we'll use suspended Ceilings/POP to cover it up. The reason why we couldn't Run away from using Marine board for the raft is because we can be sure of our building been Properly Square on all Corners and Straight.

1 Like

Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by Beulah09: 7:07pm On Sep 06, 2016
skimanski:


We are using the wood we have on site, no need buy new boards. Which is some pieces of Marine Board and some pieces of 1 x 12 wood. Not necessarily one particular material. What is important is that the wood gives us our straight Deck. Even if not smooth because at the end we'll use suspended Ceilings/POP to cover it up. The reason why we couldn't Run away from using Marine board for the raft is because we can be sure of our building been Properly Square on all Corners and Straight.

Thanks. When will you be casting the deck? Is the ongoing rain not a concern.

Which one comes first? The electrical or the plumbinh works?
Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by wanaj0: 5:12am On Sep 07, 2016
skimanski:


We are using the wood we have on site, no need buy new boards. Which is some pieces of Marine Board and some pieces of 1 x 12 wood. Not necessarily one particular material. What is important is that the wood gives us our straight Deck. Even if not smooth because at the end we'll use suspended Ceilings/POP to cover it up. The reason why we couldn't Run away from using Marine board for the raft is because we can be sure of our building been Properly Square on all Corners and Straight.

Are you going to use suspended ceiling/POP everywhere? I think it is better to have a smooth surface. You may be able to achieve that by laying membrane on the deck formwork.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (11) (Reply)

Building Collapses In Sango Police Barracks, Ibadan, Oyo State (Video) / Building Collapses In Obalende, Lagos. 4 Dead / Properties In Port Harcourt Destroyed After A Heavy Rainfall (Photos)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 41
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.