Re: Construction Diary Of An Executive Four Flats In Enugu by bixton(m): 7:07pm On Mar 22, 2019
Dubemcapital1:
Hps roof... About 3000 per sqm but highly dependant on the design you choose.
Okay, thanks.
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 3:08am On Mar 25, 2019
Finishers at work already. Final touches....

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
marble tiles makes floor finishing rich

Re: Construction Diary Of An Executive Four Flats In Enugu by danny34(m): 6:36pm On Mar 29, 2019
Hmmm the pace wey u use follow the house no he here o. Just the other day this tread was opened. Weldone. It turned out wonderful, should you need painting services, we are here n Enugu, n very affordable too!
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 8:03am On Apr 01, 2019
danny34:
Hmmm the pace wey u use follow the house no he here o. Just the other day this tread was opened. Weldone. It turned out wonderful, should you need painting services, we are here n Enugu, n very affordable too!
That's good, may not be for this one though but hope to do a job with you. Thanks a lot
Re: Construction Diary Of An Executive Four Flats In Enugu by Tonymegabush1(m): 9:39am On Apr 01, 2019
Nice work @ op, your work looks promising... Pls tell me more abt water [borehole ] did u dig or do u intend to, I ave a intended site to b situated in Nsk town besides unn, and I heard that water digging is very costly in enugu not excluding nsk.... Tell me more about it
Re: Construction Diary Of An Executive Four Flats In Enugu by danny34(m): 12:27pm On Apr 01, 2019
Dubemcapital1:
That's good, may not be for this one though but hope to do a job with you. Thanks a lot
Thanks too. Will look forward to that...........
Re: Construction Diary Of An Executive Four Flats In Enugu by oalandAgents2: 2:31pm On Apr 01, 2019
nice one follw my post too
Dubemcapital1:
Let's look at this construction diary , a storey of 3bedroom flat in another architectural measurable extent of a particular kind.


Client's name : Mr Steven
Location of the project : Enugu State
Budget estimate : 42.5m
Expectations : an outstanding tenant house


Welcome on board people let's visit the site...



Also view Our previous work@ dubemcapital

https://www.nairaland.com/3243543/making-2storey-building-12-flats

https://www.nairaland.com/4025643/building-existing-structure-storey-one

https://www.nairaland.com/3104124/building-6-bedroom-executive-duplex

https://www.nairaland.com/2635697/building-6bedroom-duplex-half-plotI

https://www.nairaland.com/3758639/lets-build-unique-3-bedroom
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 4:02pm On Apr 01, 2019
oalandAgents2:
nice one follw my post too
Okay, thanks
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 12:53am On Apr 02, 2019
Tonymegabush1:
Nice work @ op, your work looks promising... Pls tell me more abt water [borehole ] did u dig or do u intend to, I ave a intended site to b situated in Nsk town besides unn, and I heard that water digging is very costly in enugu not excluding nsk.... Tell me more about it
Though this project is at Nike not Nsukka but we did a manual bore hole of about 80ft, though the test conducted advice we can get water at 30feet but to be on the safe side we went up to 80feet.

Really Nsukka water level is very low, someone went up to 800 feet deep to get water and some other was just 600 feet below the surface for water in the same Nsukka area.

So water in Nsukka is not easy , i was adviced to buy water from water tankers if am handling any project in Nsukka. Is that bad some lucky ones get water at 300feet even depending the part in Nsukka.

Thanks
Re: Construction Diary Of An Executive Four Flats In Enugu by Tonymegabush1(m): 2:18pm On Apr 02, 2019
Dubemcapital1:
Though this project is at Nike not Nsukka but we did a manual bore hole of about 80ft, though the test conducted advice we can get water at 30feet but to be on the safe side we went up to 80feet.

Really Nsukka water level is very low, someone went up to 800 feet deep to get water and some other was just 600 feet below the surface for water in the same Nsukka area.

So water in Nsukka is not easy , i was adviced to buy water from water tankers if am handling any project in Nsukka. Is that bad some lucky ones get water at 300feet even depending the part in Nsukka.

Thanks
Tnks man ur response was really helpful but that water issue down there (NSK) is really giving me headaches the bill for water construction which was given to me was within 2.5m to 3m... After checking out two contractors, the suggestion of using tankers seems good but how much do u think I will burn out b4 finishing 3 storey building, in the end if I decide to construct the borehole definitely I must sell water within there......

Tnks 4 ur time once again
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 5:06pm On Apr 02, 2019
Tonymegabush1:
Tnks man ur response was really helpful but that water issue down there (NSK) is really giving me headaches the bill for water construction which was given to me was within 2.5m to 3m... After checking out two contractors, the suggestion of using tankers seems good but how much do u think I will burn out b4 finishing 3 storey building, in the end if I decide to construct the borehole definitely I must sell water within there......

Tnks 4 ur time once again
Just budget about 25 to 30 water tanker (full load) × 7,000 or 8,000 = 175,000 or 240,000 as the case may be.

However, is better to have a permanent water source (bore hole) in the premises hence is for tenants. That will add value to the house and you can aswell generate some income from it too.
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Mable laying concluded... indoors painted already

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Stainless Rail installation....

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
I prefer white doors, is exceptional with a good touch of finishing.

Also metal doors are stonger, safer and cheaper.

Re: Construction Diary Of An Executive Four Flats In Enugu by adewaleID: 6:54pm On Apr 05, 2019
Superb work, following
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 6:45am On Apr 06, 2019
More pictures of other flats interior finishing

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 6:50am On Apr 06, 2019
adewaleID:
Superb work, following
Thank you and welcome
Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Stainless rail and 8mm glass combined...

Out door painting...

Lighting up the house...

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Based on test conducted on the soil we may likely get a good water at 30 feet .

So, we started opening the ground with intention to hit 150 feet if the water recharging rate didn't stop us

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
.........Some P.O.P ceiling after installation and finishing... And colour variation...1

Combination of about 3 different paint brands.

List:

1. Dulux colour
2. Value paint
3. Durable paint

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Some P.O.P ceiling after installation and finishing... And colour variation.

Combination of about 3 different paint brands.

List:

1. Dulux colour
2. Value paint
3. Durable paint

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
More pictures of the finishing

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
More pictures of the sanitary ware...

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 7:21am On Apr 13, 2019
....

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
Outside view

... repainting the gates and the fence.

...installing outdoor hangers for laundary

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
As the new well goes deeper we have to fill up the other well with sand and possibly build an overhead tank stand on it.... That is the only position that will not deface the building with the overhead tank stand we are considering beauty too.

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
So we shut down the other well and excavated for the tank stand.



By calculation, a 10 ton trip of sand will fill up a well of about 35ft depth by 3feet width. So we fill up the well with sharp sand which better.

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 3:45am On Apr 20, 2019
More on tank stand

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
The rolling gate we have here is an unusual one, There was serious need to manage space and this concept was birthed ...follow me

The first wing of the gate opens by rolling out by the fence wall and the second follows all by the wall area.

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op):
The tank stand is up. Click on the link for more details on how the over head tank was built


https://www.nairaland.com/4967576/making-overhead-tank-stand-back-filled

Re: Construction Diary Of An Executive Four Flats In Enugu by Dubemcapital1(op): 1:00am On Apr 29, 2019
We where able to get water at 27ft but wish to have a year round sustenance so we went deeper to 64 ft.


From the rate the well is recharging we are very sure of 12,000 litres every week with such result we can now introduce submersible pump.