Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:10am On Jun 05, 2024
More

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 3:36pm On Jun 04, 2024
More update pics loading
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:07am On Jun 04, 2024
Imported railing fabrication almost done
Total cost N3.5m

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:06am On Jun 04, 2024
Pop ceiling still in progress

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:25pm On May 27, 2024
More loading
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:24pm On May 27, 2024
Work is in progress

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:50pm On May 24, 2024
AngelicBeing:
Well done ✅ 👍
Thanks so much ma
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:15pm On May 24, 2024
AngelicBeing:
My omonile boys will be visiting your site today and you must settle my boys with the following>> foundation money 500 dollars, erecting pillars money 700 dollars, window level money 700 dollars , lintel money 700 dollars, decking money 1000 dollars , complete carcass money 2000 dollars, total money to be paid by cash to my boys is 5600 dollars or send it to my bank account in Sweden > HSBC account number 432659 , swift / wire transfer code 097 otherwise l will tell my boys to stop work on your site immediately, thanks , Angelic Being tongue
Hahahahha..my BOSS TUALE OOO pls it’s me your boy I Dey loyal ooo
Thanks so much for your time here l, I really appreciated.
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:04am On May 24, 2024
Still in progress
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 10:03am On May 24, 2024
Happy jumat to you all
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:03am On May 24, 2024
Happy jumat to all our Muslim clients and followers
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:23pm On May 22, 2024
robonski15:
I am in need of an experienced engineer to complete my building project. Location Mainland
Kindly drop contact details.

My oga rotecch77 i need your recommendation.
Thank You
Good evening sir
Chart me up on 08066619493
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:17am On May 22, 2024
Watch out of more pics update
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:16am On May 22, 2024
Reeefe:
Good day house, I need a quote for plumbing cracking and piping with PPR.
6 toilet and bathroom
2 visitors toilet
4 kitchen

Ps: 4 out of the the 6 toilet will be using the wet and dry design pattern.
Send your drawing to my whatzap number
08066619493 for quotation
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:12am On May 22, 2024
Foundation with plinth beam

Phase 2 still in progress

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:22pm On May 21, 2024
Rany4all:
I know it's expensive...I was just thinking maybe a hidden or flat roof would have looked better on that building, but it's client's choice anyway. Kudos bro!
Oh ok, yes the client love hipped roof for this.
But the Eatery will be flat roof design
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 3:13pm On May 21, 2024
More update pics loading
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:04pm On May 21, 2024
Rany4all:
Is it possible to do hidden roof with steel?
Yes it’s very possible.
But naa money ooo
This building steel roofing only cost about 18M plus Aluminium roof covering we spent about 30M
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:59am On May 21, 2024
folmus:
This house fine past longspan roofing. Money!! grin grin grin
This is steel roofing and long span is the best for it… it’s real complete 0.70mm thickness both the quality and thickness used here is far far costly than gerald.
The quality of the Aluminum product is not those regular one you see out there in most building.

Thanks chief for your time here sir
————-/-
In order news 2nd/3rd building is going on here …Utilities building and mega Eatery

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:25pm On May 19, 2024
kopell:
Oga the better truth is what Rotecch77 said. There is no need for Rotecch77 to use those hash words in advising someone that asked for help. The first guy that gave you that number, please run ooo. He will use your money for pepper soup. The second so call Engineer, that 8MM in decking is questionable. I believe it should be 10MM and will be far more then that number including more extra banding wires. Please always use qualified Engineers to save life. Remember people will live there, people lives are more important than the structure. Build safe.
Yes.. as they says truth is bitter.
Based on my experience / duration in this industry it’s better I tell you truth straight if you like take it if you like don’t take it, it’s not by force
Reason why I choose work that I take now .

No time and energy to dey explain explain explain tired …….

—————
On side note we are using this imported railing for this our Royal Hall

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:13pm On May 18, 2024
Let me drop this here pop is in progress
Only materials cost about 5m plus

2nd phase is in progress 3 Floors
Details later or check our tread

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:09pm On May 18, 2024
Noworries11:
My country people and elders in the building
Na my first time to build.... I kept bringing out money so tey i spent way above my budget just to get to lintel phase however please I need an advise for an estimate cost for the decking for a semi detached duplex (4 bedroom each duplex I.e 8 bedroom semi-detached duplex)

The site engr has estimated about #4,226,000 just for the rods (decking) while another engr on the side who is willing to handle has estimated #1,050,000

Brethren to say I am confused is an understatement

I decided to run here and perhaps get professional advice.
Please note that this is the cost for rod alone

Let me break it further how they arrived at the said amount

Site Engr;
70 lengths of 16mm rod @17,000 =#1,190,000
300 lengths of 12mm rod @9,400 =#2,820,000
50 lengths of 8mm rod-@3400 =#170,000
Binding wire = #45000
Total = #4,225,000

*Alternate Engr*

2) *ROD 16M² 25PIECES PER 1? N14,500× 25 = N350,000*

3) *ROD 12M² 60 PIECES PER 1? N9,200 × 60 = N552,000*

4) *ROD 8M² 30 PIECESB PER 1? N4,500 × 30 = N135,000*

6) *BANDING WIRE #20,000*

Total = N1,057,000

Please make una choke mouth for the matter
Is like your mental health is not value to you by thinking your site Engr is ripping you as some think that all engr as rogue.
By the time your new proposed Iron Bender calling himself engr deal with you finished you will know how far.

You beta prepared about 6m-7m for both the two duplexes iron rod before the project will become abandon one ( God forbid )
If you don’t believed the figure I said take the money your self and go to the market and watch as the work going on then come back here and feed us back with the final cost.
Then I may not say anything … I value my time and health now.
I wish you well on your project .
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:56pm On May 18, 2024
therealMcCain:
Guys please help me critize this plan. I initially wanted them to be detached units but I changed my mind.

I specifically asked for the rooms to have some form of cross ventilation.

CC
saydfact
twinskenny
mufutau55
OnMyHonor
michlins
diordaves
Hey man .. Not all questions / discussion I share my thoughts on this days.
But let me tell you DONT disturb your self about this plan.
YOUR architect did very wonderful job to bring this luxury combo design out, you need to buy him drink. ( just make sure the kitchen exist door open outside the lobby).
I said this based on my theoretical and practical experience as a Builder.
Don’t ask me any further questions I will not answer …lolz
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:44am On May 15, 2024
Phase 1.. Hall .. Pop is In progress

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:42am On May 15, 2024
Phase 2 .. Mega Eatery/ gym house loading

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:21am On May 12, 2024
Happy wkd to you all
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:20am On May 12, 2024
If you don’t have strong back bone don’t do this
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:50am On May 11, 2024
Reach out to us for more details

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:47am On May 11, 2024
More

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:21am On May 10, 2024
Muyesky:
Lasercut sliding gate ready for delivery. cool
Nice one
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:17am On May 10, 2024
More pics

Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:16am On May 10, 2024
Pop ceiling loading