Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:31am On Jan 24 |
Call on us |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:47am On Jan 23 |
More
|
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 3:04pm On Jan 22 |
Call on us
|
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 2:59pm On Jan 22 |
Still active |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 2:57pm On Jan 22 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 2:54pm On Jan 22 |
More update loading |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 6:40pm On Jan 19*. Modified: 8:54pm On Jan 19 |
Steel cantilever canopy 2mtrs long
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:21pm On Jan 15 |
Amoda84: Hi @Rotecch77
Thank you for your reponse. Tried to reach you on whatsapp, please kindly drop your new whatsapp number so we can discuss. Here is my contact sir 08066619493 call/ whatzap |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:40am On Jan 15 |
External work is in progress.. floor filling and leveling, mechanical work etc
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:38am On Jan 15 |
Amoda84: Please experts in the house, I need to your expert opinion on what could be responsible for these cracks as shown in the pictures attached. The property have been in use for close to 5 years and suddenly we started seeing those cracks almost everywhere on the ground floor.
I am not so worried about the paint peeling off but the cracks, i am not sure where it is coming from so I said let me just put it to experts. We haven't detected any water leakage anywhere but I am a little worried about those cracks.
What could be responsible for this? and what kind of fixing should we do here? I am not sure if just patching the surface and perhaps repainting fixes it. Looking forward to expert opinions.
Thank you
@rotecch77 Please appreciate all response @rotecch77 This is severe risen dampness and partial differential settlement of the structure You need to attend to it quickly. We just finished with Risen dampness and normal dampness for a client here in Ibadan just yesterday
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:25pm On Jan 08 |
Beframia: What are the factors to be considered if one wants to connect to a borehole who is about 200m away? Please note that the borehole is already in use and sited in a residential property. Thank you. @topsy23 @rotecch77 200m horizontal level or 200m height? To buttress Engr Topsy, the distance in height or Horizontal level plus depth of the bore hole will determining 1. Pump size 2. Flow rate. 3. Size of pipe to be used ( mainly 1’ or 1-1/4’ Etc |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:18pm On Jan 08 |
Ayohbk: Hello house, please does anyone know the average cost of installation of water filtering system for a building with 6 flats. The current water output contains lead and it's colored. The idea is to have the borehole pump the water into a filtering system then the filtered water is transferred to the tanks. It depends on the nature of the unclean water. But budget btw 350k- 1.5m But if it’s salty water it’s more costly than this. You can reach out to us for more |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:41pm On Dec 12, 2025 |
Checking for leakage before tiling of the pool
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 1:15pm On Dec 11, 2025 |
More update coming soon |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 1:13pm On Dec 11, 2025 |
Testing for leakage before the final phase of the pool work
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:08pm On Dec 10, 2025 |
Double size Septic tank
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:56am On Dec 09, 2025*. Modified: 11:24am On Dec 09, 2025 |
If it reaches your turn call quack to handle your project. You gonna learn in hard way |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:53am On Dec 09, 2025*. Modified: 1:14pm On Dec 11, 2025 |
Double size septic tank 24ft x12ft x10ft
|
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 9:43pm On Dec 06, 2025 |
Available |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:43pm On Dec 06, 2025 |
Still on it |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 3:47pm On Dec 03, 2025 |
External
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:44pm On Nov 29, 2025*. Modified: 9:51pm On Nov 29, 2025 |
No comment I want the work to speaks for itself
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 4:55pm On Nov 29, 2025*. Modified: 6:33pm On Nov 29, 2025 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 4:54pm On Nov 29, 2025 |
More pics loading |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:26am On Nov 29, 2025 |
Gym section
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:22am On Nov 28, 2025 |
Children game house/fun fare section finishing is in progress
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:44pm On Nov 27, 2025*. Modified: 5:08pm On Nov 27, 2025 |
Lighting up of the game / fun-fare section of the project
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:03am On Nov 27, 2025 |
More pics loading
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:34pm On Nov 25, 2025 |
We don’t compromised with quality materials and quality work |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 3:50pm On Nov 25, 2025 |
More
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:41pm On Nov 25, 2025 |
Duplex90: so you took my advice and used a retaining instead of the blocks in your previous pictures. Nooo bcs we knew what we are doing from beginning only that you are quick to jumped into conclusions that we are not using concrete reason why I schooled you immediately so that you can learn as a young architect Thank God you follow us you are a fast learner Don’t be surprised another block wall is still coming after this….. but I will not tell you where we are going to put it now just follow up as usual |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:06am On Nov 25, 2025*. Modified: 10:26am On Nov 25, 2025 |
Pool structural work done and dusted
|